RBSP MCR EFW- 1 JHUAPL, Jan 30,31 2007 RBSP-EFW Radiation Belt Storm Probe Electric Field and Waves Instrument (EFW) PI: Prof. John Wygant, UMN

Slides:



Advertisements
Similar presentations
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
Advertisements

Science Questions What is responsible for the "near" prompt onset of convection in the inner magnetosphere? Fast mode rarefraction wave?. How is the dayside.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Observatory - Overview July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 1 Single Observatory Stowed.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
Stuart D. BaleFIELDS iCDR – Science Requirements Solar Probe Plus FIELDS Instrument CDR Science and Instrument Overview Science Requirements Stuart D.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Blackbody Controller 9 March 2004 Scott Ellington
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
Sept. 2008EFW INST+SOC PDR RBSP EFW GSE and SOC-GSE GSE and SOC-GSE (Science Operations Center In Support of INT) John Bonnell Will Rachelson Matt.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 27 EFW Science Overview Professor John R. Wygant (PI) University.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
EFW Data Products/Processing Van Allen Probe SWG San Antonio September 2104 J.R. Wygant, J. Bonnell, Aaron Breneman, S. Thaller and the EFW Team.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
THEMIS Instrument CDR 1 UCB, April , 2004 EFI Axial Booms Thermal Christopher Smith Thermal Engineer
1 Barry Mauk, Nicola Fox, David Sibeck, Shrikanth Kanekal, Joseph Grebowsky, Ramona Kessel RBSP Project Science Team This document has been reviewed for.
Stuart D. BaleFIELDS iPDR – Science Requirements Solar Probe Plus FIELDS Instrument PDR Science and Instrument Overview Science Requirements Stuart D.
MPSREFI- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW “Our Gateway to the Cape…” The Electric Field Instrument (EFI) John Bonnell University of California.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
1 Dec SPP-Fields Antenna Electronics Board (AEB) Concept Status Report J.W.Bonnell, S. Harris, S. Heavner Space Sciences Laboratory UC Berkeley.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
THEMIS SRR 1 UCB, June 8-9, 2003 Solid State Telescope Davin Larson SSL.
THEMIS EOMP ReviewEFINov 19, 2009 THEMIS Electric Field Instrument (EFI) Dr. John Bonnell Space Sciences Laboratory UC Berkeley.
THEMIS IDPU FSW 11/29/ UCB THEMIS IDPU FSW V4 Mission Profile Tests Peter Harvey Michael Ludlam.
Magnetospheric MultiScale Mission (MMS) Overview
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Instrument PER 1/21/ EFW Instrument Calibration John W. Bonnell Space.
7 3-4 Sept EFW INST+SOC PDR EFW Science Overview Professor John R. Wygant (PI) University of Minnesota.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 213 Low Voltage Power Supply & Power Controller Board Peter.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes LVPS+PCB Peter BergRBSP/EFW CDR /30-10/1 IDPU LVPS AND PCB Critical Design Review.
SWGTemplate- 1 UCB, Nov 15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Search Coil Magnetometer (SCM) team Co-i: A. Roux, O. Le Contel Technical Manager(*):
Dec 1, FIELDS Top Level Requirements Review S. Harris (UCB)
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
NASA NAG Structure and Dynamics of the Near Earth Large-Scale Electric Field During Major Geomagnetic Storms P-I John R. Wygant Assoc. Professor.
EFW SOC DATA John Wygant SWG June Redondo Beach.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Operational Concept.
Stuart D. BaleFIELDS SOC CDR – Science Requirements Solar Probe Plus FIELDS SOC CDR Science and Instrument Overview Science Requirements Stuart D. Bale.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Instrument Testing to Date Michael Ludlam for EFW.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
Colorado State University Paul Scholz, Tyler Faucett, Abby Wilbourn, Michael Somers June
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Engineering Peer Review Overview Dr. John W. Bonnell and the.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Science Overview Professor John R. Wygant, PI University.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
Radiation Belt Storm Probes SRMDR1 Electric Fields and Waves (EFW) John Wygant EFW PI University of Minnesota.
Solar Probe Plus – FIELDS Main Electronics Package
Acronyms 3-4 Sept DRAFT EFW INST+SOC PDR 483
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
Electric Field and Waves Instrument (EFW)
SP+ DFB REE 12/01/12.
Science Requirements The FGM shall measure DC and low frequency perturbations of the magnetic field  see performance requirements The FGM shall measure.
Boom Electronics Board (BEB)
Solar Probe Plus FIELDS Instrument PSR - MEP Introduction
Preliminary Design Review
Radiation Belt Storm Probes Electric Field and Waves Instrument
Operational Description
Low Voltage Power Supply & Power Controller Board
THEMIS Electric Field Instrument
University of California, Berkeley
Presentation transcript:

RBSP MCR EFW- 1 JHUAPL, Jan 30, RBSP-EFW Radiation Belt Storm Probe Electric Field and Waves Instrument (EFW) PI: Prof. John Wygant, UMN (612) PM: Dave Curtis, UCB

RBSP MCR EFW- 2 JHUAPL, Jan 30, RBSP-EFW Org Chart

RBSP MCR EFW- 3 JHUAPL, Jan 30, RBSP-EFW UMN will subcontract to UCB and LASP to develop the EFW instrument No other significant subcontracts are required. All hardware built and tested in house. Major Subcontracts

RBSP MCR EFW- 4 JHUAPL, Jan 30, RBSP-EFW Instrument Science Requirements

RBSP MCR EFW- 5 JHUAPL, Jan 30, RBSP-EFW Science Objective: Measure electric fields associated with a variety of mechanisms causing particle energization, scattering and transport in the inner magnetosphere. These mechanisms include: Energization by the large-scale convection E-field. Energization by substorm injection fronts propagating in from the tail. Radial diffusion of energetic particles mediated by ULF MHD waves. Transport and energization by intense magnetosonic waves generated by interplanetary shock impacts upon the magnetosphere. Coherent and Stochastic acceleration and scattering of particles by small-scale, large-amplitude plasma structures, turbulence and waves (EM and ES ion cyclotron waves, kinetic Alfven waves, solitary waves, electron phase space holes, zero freq. turbulence) Science and Measurement Objectives (1)

RBSP MCR EFW- 6 JHUAPL, Jan 30, RBSP-EFW RBSP Electric Field Waves Four spin plane booms (2 x 40 m and 2x 50 m) Spherical sensors and preamplifiers near outboard tip of flexible cable boom (500 kHz response) Flexible boom cable ~7-8 thin wires carrying power/bias commanding out to sensor electronics and signals back to SC. Outer braid of cable is a conductor tied to SC chassis through large resistor (100 k ohms to 1 M ohms). Two spin axis stacer booms (2x6 m) with outboard sensors Sensors are current biased by instrument command to be within ~ 1 volt of ambient plasma potential. (except sensors at ends of E-field booms) Main electronic box (filtering, sampling, A-D conversion, commanding, tm formatting, burst memory, spectra, IDPU etc. Telemetered electric field quantities include: SC- sensor potential (V1s, V2s, V3s, V4s, V5s, V6s) Difference between opposing sensors (V12, V34, V56) Electrostatic cleanliness spec designed to keep variations of potential across spacecraft surfaces smaller than 1 Volt SC Rotation SUN

RBSP MCR EFW- 7 JHUAPL, Jan 30, RBSP-EFW Mechanisms associated with energetic particle acceleration and transport (Mauk/APL)

RBSP MCR EFW- 8 JHUAPL, Jan 30, RBSP-EFW The shock induced magnetosonic wave created a 5 order of magnitude increase in 13 MeV electron fluxes in <100 seconds resulting in a new radiation belt that lasted two years The large scale electric field produced a ~70 kV potential drop between L=2 & L-4 and injected ring current plasma. dDst/dt= - 40 nT/hr MHD waves: an important mechanism for radially diffusing and energizing particles. CRRES measurements of the E-field during a pass through the the inner magnetosphere March 1991 Major Geomagnetic Storm E-Fields in the Active Radiation Belt

RBSP MCR EFW- 9 JHUAPL, Jan 30, RBSP-EFW Injection Front: prompt energization of ~ 1 MeV electrons near R=4.28 Local midnight Top panels Ey gse, Bz gse Drift Echo signature in energetic particles Intense 100 mV/m (ptp) electric field turbulence in Ey and Ez gse (0.2 to 10 Hz)

RBSP MCR EFW- 10 JHUAPL, Jan 30, RBSP-EFW Science and Measurement Objectives (2)

RBSP MCR EFW- 11 JHUAPL, Jan 30, RBSP-EFW Key Measurement Quantities: Spin plane component of E at DC-12 Hz (0.05 mV/m accuracy). Spin axis component of E at DC-12 Hz (~3 mV/m accuracy). E- and B-field spectra for nearly-parallel and nearly- perpendicular to B components between 1 Hz and 12 kHz at 6-s cadence. Spacecraft potential estimate covering cold plasma densities of 0.1 to ~100 cm-3 at 1-s cadence. Burst recordings of high-frequency E- and B-field waveforms, as well as individual sensor potentials for interferometric analyses. Science and Measurement Objectives (3)

RBSP MCR EFW- 12 JHUAPL, Jan 30, RBSP-EFW Instrument Concept

RBSP MCR EFW- 13 JHUAPL, Jan 30, RBSP-EFW Boom Accommodation Schematic Diagram of EFW

RBSP MCR EFW- 14 JHUAPL, Jan 30, RBSP-EFW Spin Plane Boom (SPB) RBSP-EFW: SPB Packaging Concept (THEMIS) Example of SPB, Cable, Preamp, Fine Wire and Sphere (THEMIS Flight Model) Mass: 2.2 kg/unit (4 total). Envelope: 9.9”H x 4.6”W x 8.6”D. Deployed Length: 80/100 m tip-to-tip. 47 m cable + 3 m fine wire in each SPB. Deploy Rate: cm/s. Cable Mass Rate: ~3 g/m. Fine Wire Mass Rate: < 1 g/m. Preamp Mass: 48 g (up to 150 g w/up-shield and cable driver). Sphere/Keyreel Mass: 100 g. Deployed spin MOI: 600 or 360 kg-m2/boom (100-g preamp); 1920 kg-m2 total. Power: 2.6 W/unit (typ., deploy motor only). Actuators: Doors are spring-loaded, SMA or FrangiBolt- released; Cable deploy is motor-driven; no pyros required for actuation.

RBSP MCR EFW- 15 JHUAPL, Jan 30, RBSP-EFW Axial Boom (AXB) Examples of AXB, Tube, and Preamp/Whip (THEMIS Flight Models): Mass: 4 kg total (2 booms + tube). Footprint: 41H x 5 to 6 OD inches. Deployed Length: 12m tip-to-tip. 1-m whip sensor stacer. Power: 35 W max for 1-2 s, per boom (deploy only). Actuators: deploy is spring-driven, Frangibolt- released; no pyros required for deploy.

RBSP MCR EFW- 16 JHUAPL, Jan 30, RBSP-EFW Instrument Data Processing Unit (IDPU) Mass: 4.7 kg. Dimensions: 9.75H x 4.7W x 7.95D inches (add 2-inch keepout for connectors to depth). Power: 7.5 W (primary side, CBE). Elements and Function: Chassis – provides structural integrity and radiation shielding (7-mm Al equiv.). Backplane – signal and power distribution. Low-Voltage Power Supply (LVPS) and Power Controller Board (PCB) – power conversion, regulation, and switching. Data Processing Unit (DPU) and Memory (SSR) – instrument control; data storage, routing, and compression. Boom Electronics Board (BEB) – sensor and bias surface control. Digital Signal Processing Board (DSP) – analog signal conditioning, ADC, digital waveform filtering, on-board spectral product calculation. UIowa (EMFISIS) Interface Board (UII) – buffering of E- field signals to EMFISIS; buffering of B-field signals from EMFISIS; burst coordination signals; etc. (may be part of DSP or BEB).

RBSP MCR EFW- 17 JHUAPL, Jan 30, RBSP-EFW Digital Signal Processor (DSP) The DSP board provides analog conditioning of the signals from the E- and B-field sensors on RBSP, analog-to-digital conversion of those signals at 16-bit resolution, digital waveform filtering, and on-board FFT-based spectral product computations (auto- and cross-spectra). All analog signals (V1-V6, E12, E34, E56 (both DC- and AC-coupled) and SCM1-3) are sampled at a constant 32-ksamp/s rate through the analog mulitplexer and switch system, and the three 256-ksamp/s ADCs. The 3 ADCs can be reconfigured so as to maintain sampling at lower base rates if one or two fail during the mission. Independent Survey and Burst digital filter chains provide anti-aliased and down- sampled waveform data at power-of-two intervals from 32 ksamp/s to 1 samp/s. Broadband power-of-two Filter Bank channels are derived directly from the digital filter chain outputs for use in on-board triggering or Survey science output. DC B-field data (EMFISIS fluxgate) used to rotate AC E- and B-Field into field-aligned coordinate system for input to on-board FFT-based spectral processing. On-Board FFT-based spectral processing of AC E- and B-Field data used to produce auto- and cross-spectral data products.

RBSP MCR EFW- 18 JHUAPL, Jan 30, RBSP-EFW Boom Deployment Systems TRL 8, based on ISEE, CRRES, Polar, FAST, Cluster-II, and THEMIS heritage. Changes will include thinner cable, different accommodating SC. Sensor Electronics (Preamp and BEB) TRL 8, based on Polar, Cluster-II, and THEMIS heritage. Changes will include thinner cable, possible cable driver. IDPU Power, DSP, DPU, and Burst Memory TRL 7-8, based on Polar, FAST and THEMIS heritage. Changes will include interfaces to other instruments and SC, adjustments to filter frequencies and ADC rates, flight software changes. Technical Readiness

RBSP MCR EFW- 19 JHUAPL, Jan 30, RBSP-EFW New SPB cable design A new, smaller harness design was proposed for RBSP Electrical and Mechanical tests under way to verify the new design meets requirements and reliability Mass and volume implications if it can’t be used Parts Heritage electronics design from THEMIS uses Grade 3 parts Some parts may fail up-screening to Level 2, requiring a redesign Start parts screening early in Phase B Concept Risks

RBSP MCR EFW- 20 JHUAPL, Jan 30, RBSP-EFW Spin-Axis Pointing Impact of different illumination on DC and AC systematic errors (EFW and EMFISIS). Axial Boom Accommodation and SC Stability Dual Axial booms to be accommodated along central axis of RBSP SC. Potential for solar array shadowing issues AXB effects on RF Antenna pattern (in work) Well-known and understood issues of dynamic stability (spin/transverse MOI requirements). System-Level Issues

RBSP MCR EFW- 21 JHUAPL, Jan 30, RBSP-EFW Develop Management Plan (Organization, Cost, Schedule, etc.). Participate in Requirements definition and flow-down efforts. Participate in Spin Axis Pointing trade study. Participate in Spacecraft Accommodation Studies, including: Ongoing Axial boom trades: Telecom antenna issue, Offpointing SC charging and ESC specification. C&DH system interface Boom mounting and dynamics Thermal interface Perform EFW Design Trade Studies, including: Choose custom Gore cable for SPBs (mass vs. electrical response). Define EFW frequency response and noise level requirements (joint with EMFISIS). Choose processor for DPU (8085 or FPGA-based). Choose preamp floating supply range (100 vs. 200 volts). Define capabilities of on-board Burst and Spectral Product systems. Define EFW-EMFISIS interface. Phase A Activities

RBSP MCR EFW- 22 JHUAPL, Jan 30, RBSP-EFW Instrument Level I&T (occurs at UCB): Preamp Thermal Qualification and Acceptance Test: –Performed informally on previous missions (Polar, Cluster, FAST), and formally as part of parts qualification on THEMIS. –Preamps generate little internal heat, and are either isolated from SC heat sources (SPB), or attached to efficient radiators (AXB). –Thus, preamp enclosure and PWB exposed to relatively extreme temperature swings during eclipse: –THEMIS T min of -135 C for 3-hour eclipse. –1 C/min rate of cooling. –Batch of complete ETUs (8 on THEMIS) run through >=7 hot- cold cycles to verify design meets or exceeds performance requirements. –Each Flight Preamp run through >=7 hot-cold cycles to verify that the unit meets or exceeds performance requirements. Integration and Test Plan (1)

RBSP MCR EFW- 23 JHUAPL, Jan 30, RBSP-EFW Instrument Level I&T, con’t (occurs at UCB): Boom Unit (SPB, AXB) Vibe, Functional and TVAC Testing: –Vibe tests as per GEVS requirements: –Levels as per launch vehicle environment and SC modeling. –Tests performed in Bay Area (Quanta Labs, for example). –Performance Tests (Science and Engineering). –Performed at Ambient; Hot and Cold TVAC. –Limited DC and AC Functional Tests (gain, offset, phase at DC and selected frequencies). –Mechanical and actuator performance: »Motor, SMA, or frangiBolt current at min, max, and nominal supply voltages. »Deployed length measurement and length indicator calibration. »Run-out (straightness) and 1 st -mode estimation (AXB only). Integration and Test Plan (2)

RBSP MCR EFW- 24 JHUAPL, Jan 30, RBSP-EFW Instrument Level I&T, con’t. (occurs at UCB): Sensor and Boom Electronics Board (BEB) Calibration (Science Cal, or SciCal). –Detailed calibration of Sensor and BEB operation and verification of required performance. –Instrument transfer function vs. frequency (gain, phase, offset). –Bias current and voltage frequency response and offset control calibration. –Noise levels. IDPU Functional, Vibe and TVAC Testing: –Electrical Performance Tests. –Commanding and Instrument Modes Tests. –U.Iowa Interface Board (UII) Testing. –Boom Deploy Testing (Simulated and Actual). –Power control and consumption. –Software control of SPB boom deploy. Integration and Test Plan (3)

RBSP MCR EFW- 25 JHUAPL, Jan 30, RBSP-EFW Suite and SC level I&T: Fields Phasing and Timing Test: –Establishes relative phase and/or time delay between EFW and EMFISIS fields channels. Electrostatic Cleanliness verification: –All instruments and spacecraft subsystems. Functional Tests: –Commanding: –Instrument Modes (Survey, Burst, Common Burst, etc.). –Instrument Commissioning and Boom Deploy. –TM Playback. –Compatibility: –conducted and radiated EMI/EMC. –commanding and functionality (“playing well with other instruments and the spacecraft”). –Note that significant “self-test” capability exists in current design; ie. Minimal GSE required for performance testing at Suite and SC level. Integration and Test Plan (4)

RBSP MCR EFW- 26 JHUAPL, Jan 30, RBSP-EFW Boom deployment during commissioning requires real time commanding and close coordination with the spacecraft Once in nominal operations, only periodic internal calibrations and occasional mode changes as we pass into different environments are required No significant command bandwidth required Need the ability to send up time-tagged commands (like STEREO). Calibration mode will effect data provided to EMPFISIS and may also charge the spacecraft which would impact low energy particle measurements. Operations will be run from a UCB SOC same facility used for FAST, HESSI, CHIPS, STEREO, THEMIS Mission Operations Concept

RBSP MCR EFW- 27 JHUAPL, Jan 30, RBSP-EFW Mass and Power Requirements

RBSP MCR EFW- 28 JHUAPL, Jan 30, RBSP-EFW Data Products and TM Rates

RBSP MCR EFW- 29 JHUAPL, Jan 30, RBSP-EFW Data Products and TM Rates

RBSP MCR EFW- 30 JHUAPL, Jan 30, RBSP-EFW SC Charging and Electrostatic Cleanliness (ESC) SC potential symmetrization, in addition to charging control. All exposed surfaces sufficiently conducting and tied together electrically. See THEMIS ESC Specification for example of implementation and verification plan. Spin Axis Pointing RBSP spin axis shall be oriented to ensure illumination of the two EFW axial sensors. RBSP spin axis shall be oriented to ensure limited shadowing of the four EFW spin plane sensors. Velocity and B-Field Accuracy Determination of spacecraft vector velocity and local vector B-field must be such that the -VxB E-field estimate is accurate to 0.1 mV/m above 2 (TBR) Re altitude. Unique Requirements