NSQP MEETING 20-01-2011. Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure 3 4 1 5 2 Assembly Name: ISP Corrugated Panel ASM Parts.

Slides:



Advertisements
Similar presentations
Unit 8 Fastening Systems
Advertisements

The term gluing means to assemble parts with a glue or adhesive.
Adhesives Questions 1)What is the best kind of clamp to use when gluing wood edge to edge? A.Spring clamp B.Bar clamp C.C clamp D.Hand screw clamp.
Larger Diameter Hymax® 14 – 24 Inches in Diameter
…your final connection. Mine Cable Services Corporation. Cable Repairs: Vulcanized Splices.
Application Instructions Bonds to Polyethylene, PVC, Steel, Fiberglass, and Aluminum.
Assembly Instructions last updated October [NOTE: It is easier to assemble your Earthmaker on a non-skid surface. The Earthmaker can then be picked.
James Rasmussen.  Original dash was made from sheet metal, foam, and vinyl  Was too heavy for its purpose  Didn’t offer standard gauge sizes  Didn’t.
Multi-Sync Repair Training DPM Diversified Products Mfg Inc. Click the Mouse or use the Down Arrow to advance to the next point.
What is Membrane Pressing? Membrane pressing is a laminating process using heat, pressure, vacuum and adhesive to apply vinyl film or thermoplastic sheet.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
BONDED JOINTS. BONDED/MECHANICAL JOINT COMPARISON adhesion science - see Loctite, pgs 22 and 23 adhesion science - see Loctite, pgs 22 and
Plasfit - plastic push-in fittings For the drinks dispense and brewing industries.
Draper Valley Lemon Rosemary Chicken Click on green arrow to go forwards.
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
A Canadian Hot Tub Factory Tour. You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Arch 330 Fall 2008 FORMWORK AND REINFORCING FOR CONCRETE.
Making Pottery with a Mold:
Both the dome and slab design use a 5 gallon bucket in the middle to be used as a squat hole FINAL MOLD DESIGN.
Metal Working. The term “Metal Working” generally refers to process of; joining, bending, casting, and cutting metal.
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
1 Ladder assembly steps HFT PIXEL updated for ultimate chip ladders 2/12/2012 ladder fixture u.SLDASM.
Making Coverslips by Steve Smith, Cheng-Zhong Zhang and Amy Xu.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
Project Management Service
NOAA Humidifier – smaller (lower flow) version (yours will have larger tubing and fittings) Ribbon heater Thermal cutoff switch Swagelok reducing union,
Week 6 - Lecture Product Documentation
© Learning and Teaching Scotland 2006 Soldering Soldering makes a permanent joint between two pieces of metal. It can be used on most metals but not aluminium.
Photo Clip Assessed Piece of Work Level What I need to do to improve my strand level Design ideas (Strand 2) Production plan (Strand 3) Practical work.
FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY
Neuro-MEP-MICRO Delivery Set Electronic unit Small table holder Slider for Neuro-MEP-Micro Set of EMG electrodes Surface electrode.
Step TaskPart No. to use Time, Minute s Tools to UseLink to Spec. Quality ControlSafety Notes 1Mark out the first and second circle (Part 1 and 2) and.
M. Gilchriese Glued Fittings October 5, M. Gilchriese 2 Samples and Prep Three samples using Hysol 9396 Seven samples using Hysol 9394 Surface prep.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Gail Vanairsdale Global Clinical Education Manager Enlite Sensor Insertion.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
Co-Cure Stave Construction 11/10/2010. Co-Cure cables should have flashbreaker tape still covering the surface for this process. SO - don’t remove the.
Shown is the current construction Play between pin and holes in tube is causing the tictac sound. Current Part TicTac Noise (CF#64)
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
Forensic Science Adopted from T. Trimpe 2007
Building A Co-Cure Cable Thomas Johnson
Introduction to Manufacturing Processes Pt. 2 © 2012 Project Lead The Way, Inc.Principles Of Engineering.
Muoviteknologia Teppo Vienamo Joints / attachments Principles of joining plastics parts Mechanical joints / attachments Adhesives Welding.
Shear test with irradiated samples NA62 - DIPTEM Genova – UCL
TAKE NOTE ON THE ORDER OF PROCEDURE FOR CONSTRUCTION OF THE LAMINATE COUNTERTOP. Countertop Procedures.
New York June, 3, APPLICATIONS IN MODERN MANUFACTURING PRINTING PRINTING BONDING BONDING GLUING GLUING COATING COATING CLEANING CLEANING AcXys SOLUTIONS.
Bonding of Flex Cable to Stave 11/10/2010 Thomas Johnson.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Laminate the NTC-HV and PS harnesses Assembly Name: PP1 Penetration Tape Parts requires:
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
PLANER. Parts 1. Table 2. Table raising & lowering handwheel 3. Corrugated (sectional) infeed roll (top) 4. Smooth infeed roll (bottom) 5. Chipbreaker.
Joining methods, including PVA adhesive, spray adhesive, solvent cement, hot melt glue (glue gun), epoxy resin, glue sticks, single and double-sided adhesive.
HOW TO MAKE YOUR OWN SOAP STEP 1  Gather the ingredients. Cold process soap is made from oils, lye and water. When these ingredients are combined at.
Installing A Bathroom Shower Panel American Bath Enterprises, Inc. The Bath Tub & Shower Enclosure Innovators!
1. 2 TS 50/100 Tape Splicer SMD Parts Counters Tape Splicers Vision Verification Tape & Reel Supplies Manual SMD Taping Machines Automated Pick & Place.
Gluing procedure for BGO, fast and slow scintillator Mózsi Bank Kiss & Tomi Ylinen Nov. 23, 2005.
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Global Exotics Board Replacement
Canta Open Canal Manufacturing Procedure
Status of straw production straw module assembling
Activities Status and Plan for the week
Activities Status and Plan for the week
Gluing jigs for Demonstrator
Antirust Properties of Petroleum Products by NACE Corrosion
Board Replacements for Nail-Down hardwood
Textured Ceramic Platters
Using the Rilem Test Contents: Surface Preparation: Test Procedures:
Clay Canteen Project.
Presentation transcript:

NSQP MEETING

Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure Assembly Name: ISP Corrugated Panel ASM Parts requires: 1. ISP Corrugated Panel 2. PP0 bottom SLA Router Parts (2 types) 3. PP0 top SLA Router Parts (3 types) 4. Cable bottom SLA Router (1 type) 5. Top Ribbon Clip Mating end Piece (1 type)

Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure Tools/Consumables: Hysol 9396 Teflon Mold release (Supranite 12-8) Acetone Bonding tool 4mm h7 steel pins 6mm plastic tubing Procedure 1.Prepare bonding surfaces a)Grind with abrasive tape (grade 220) the bonding surface b) Spray silicone on the tool. c)Clean the bonding surface with Acetone b b

Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure 2. Set the ISP on bonding tool (bottom up) 3. Insert pins. 4. Dispense epoxy on the SLA parts. 5. Load and apply pressure the SLA parts. 6. Remove the adhesive in excess. 7. Use the plastic tube 6mm and clips for better contact. 8. Let cure for 24h to reach the adhesive handling strength. 9. Inspect all the bonds and apply adhesive fillets where needed

Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure 10. Flip over the ISP. 11. Clean the bonding surface with Acetone. 12. Follow task from 3 to 9. Quality Assurance 1.Inspect all bonds checking lack of adhesive. 2.Dry fit the PP0 boards. 3. Check the flatness of the SAL on a reference table.