Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 1 DHCAL and MICROMEGAS at LAPP Catherine Adloff Franck Cadoux Sébastien Cap Cyril Drancourt Ambroise.

Slides:



Advertisements
Similar presentations
Developments of micromegas detector at CERN/Saclay
Advertisements

Julie Prast, DHCAL Meeting, 24 janvier 2008 La carte DIF pour DHCAL (proto au m 2 et au m 3 ) Sebastien Cap, Julie Prast ( LAPP) Christophe Combaret (IPNL)
RD S. Aune CEA/IRFU Micromegas Bulk for CLAS12 vertex tracker.
Micro MEsh GASeous Detectors (MicroMegas)
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
GEM Detector Shoji Uno KEK. 2 Wire Chamber Detector for charged tracks Popular detector in the particle physics, like a Belle-CDC Simple structure using.
Digital Hadron Calorimetry using Gas Electron Multipliers Andy White University of Texas at Arlington.
July 2003American Linear Collider Workshop Cornell U. Development of GEM-based Digital Hadron Calorimetry Andy White U.Texas at Arlington (for J.Yu, J.Li,
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Micromegas for a DHCAL LAPP, Annecy Catherine Adloff Jan Blaha Sébastien Cap Maximilien Chefdeville Alexandre Dalmaz Cyril Drancourt Ambroise Espagilière.
CALICE meeting Prague 2007, Hervé MATHEZ 1 DHCAL PCB STUDY for RPC and MicroMegas (Electronics recent developments for the European DHCAL) William TROMEUR,
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
C. Combaret TILC april m2 GRPC Acquisition System C. Combaret, IPN Lyon For the EU DHCAL collaboration
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
Catherine Adloff16 June 2009 CALICE Technical Board 1 DHCAL-MICROMEGAS Yannis KARYOTAKIS For the LAPP group.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Activités R&D du groupe LC Détecteur au LAPP R. GAGLIONE pour C. ADLOFF 7 Décembre 2011.
News on GEM Readout with the SRS, DATE & AMORE
1 MICROMEGAS for Imaging Hadronic Calorimetry at Linear Colliders Catherine ADLOFF on behalf of the CALICE collaboration.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
Snowmass, August, 2005P. Colas - InGrid1 M. Chefdeville a, P. Colas b, Y. Giomataris b, H. van der Graaf a, E.H.M.Heijne c, S.van der Putten a, C. Salm.
S. AUNE 15/09/08 Micromegas Bulk for CLAS12 tracker.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
MicroMegas for DHCAL Status and activities at LAPP Catherine Adloff Jan Blaha Sébastien Cap Maximilien Chefdeville Alexandre Dalmaz Cyril Drancourt Ambroise.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
1 Status of the MICROMEGAS semi-digital HCAL M. Chefdeville, LAPP LC Detector group, Annecy CALICE meeting, CERN, 21/05/2011.
Status of the MICROMEGAS semi-DHCAL M. Chefdeville LAPP, Annecy, France LCWS, 27 th March 2010, Beijing 1.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
HaRDROC performance IN2P3/LAL+IPNL+LLR R. GAGLIONE, I. LAKTINEH, H. MATHEZ IN2P3/IPNL LYON M. BOUCHEL, J. FLEURY, C. de LA TAILLE, G. MARTIN-CHASSARD,
12/09/2007Julie Prast, LAPP, Annecy1 The DIF Task Force and a focus on the DHCAL DIF Remi Cornat, Bart Hommels, Mathias Reinecke, Julie Prast.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
1 Micromegas for sampling calorimetry Chronology & people  Initiated by LAPP LC-group in 2006 (C. Adloff, M. Chefdeville, Y. Karyotakis, I. Koletsou)
LAPP Introduction Catherine ADLOFF for Yannis KARYOTAKIS.
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
TPC R3 B R3B – TPC Philippe Legou Krakow, February nd
MICROMEGAS per l’upgrade delle Muon Chambers di ATLAS per SLHC Arizona, Athens (U, NTU, Demokritos), Brookhaven, CERN, Harvard, Istanbul (Bogaziçi, Doğuş),
Nouvelles Récentes. 2 WWS WorldWide Study on Physics and Detectors for Future Linear Colliders  Recognize and coordinate studies on whole detector concepts,
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Proto micromegas au LAPP 14 november 2008The DHCAL Board for the m2 and m3 prototype1 ASU DIF Inter DIF terminaison FPC USB Test Vendredi dernier….
Manqi Ruan Status & plans for gaseous semi-digital HCAL in European.
The European DHCAL status
M. Chefdeville LAPP, Annecy RD51/WG2, CERN, 29/04/2009
The 1m2 Micromegas prototype for hadronic calorimetry
CEPC 数字强子量能器读出电子学预研进展
A proposal to equip the high eta muon stations with High Rate GRPC
R&D advances on Micromegas for a semi-DHCAL
DHCAL and MICROMEGAS at LAPP
Status of the DHCAL DIF Detector InterFace Board
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
MicroMegas DHCAL : Résultat des tests en faisceau et simulation
Status of the MICROMEGAS semi-digital HCAL
The DHCAL DIF Board For the M2 Prototype
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
GEM-based Digital Hadron Calorimetry for SiD
STATUS OF SKIROC and ECAL FE PCB
HaRDROC status: (Hadronic RPC Detector Read Out Chip for DHCAL)
HARDROC STATUS 17 mar 2008.
HaRDROC status: (Hadronic RPC Detector Read Out Chip for DHCAL)
State of developments on Readout interface of European DHCAL
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
The DHCAL for the m2 and m3 prototype
A DLC μRWELL with 2-D Readout
Presentation transcript:

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 1 DHCAL and MICROMEGAS at LAPP Catherine Adloff Franck Cadoux Sébastien Cap Cyril Drancourt Ambroise Espagilière Raphael Gallet Claude Girard Nicolas Geffroy Richard Hermel Kostas Karakostas (guest) Yannis Karyotakis Inocencio Monteiro Fabrice Peltier Julie Prast

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 2 LAPP R&D axes MicroMegas studies with analogue readout Realisation of a mini-calorimeter Design and realisation of large surfaces MicroMegas with digital readout Design of the Digital InterFace (DIF) Within the European DHCAL project

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 3 Our choice : the bulk technology Micro Mesh gaseous structure or pads mesh + PCB = 1 block robustness large area uniformity industrial process…

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 4 MicroMegas Prototypes PCB and bulk from CERN ( Rui de Oliveira ) –325 LPI mesh –spacers : 120  m heigh 300  m diameter –pads : 0.98x0.98 cm 2, 200  m between pads The chamber –95% Argon, 5% Isobutane –conversion volume (3mm) –a top in Stainless Steel with a cupper drift cathode The pad readout : analogue –Gassiplex card : 6 gassiplex chips - 96 channels Electronics card built for CAST by DAPNIA (P. Colas, Philippe Abbon) –VME sequencer and ADC from CAEN –CENTAURE acquisition (SUBATECH, Nantes, D.Roy)

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 5 6x16cm 2 active pads MicroMegas Prototypes D. Fougeron PCB rooting with great care (4 layers) Stainless Steel top with holes for X-rays 5  m thick copper drift cathode Chamber assembly in clean environment short dust burning time ! very few sparks during functioning F. Peltier

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 6 MicroMegas Studies X-ray studies (5.9 keV) –Gain –Response versus V mesh –Response versus V drift –Gas flow dependencies –Time stability –HV supply dependencies Cosmics –MIP value measurement –First glance on X-talk

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 7 X-ray Results Entries ADC Counts all pads : 96 entries for each trigger escape peak A. Espargilière 20 ADC X-ray peak (5.9 keV) V mesh = 420 V V drift = 470 V E mesh = 35 kV/cm E drift = 167 V/cm T2K(same techno) : FWHM = 26% Gassiplex Readout : Peak = 680 ADC cnts = 996 mV  277 fC  Gain  7600 FWHM = 25.5% 55 Fe source (5.9 keV  228e - in drift volume) Trigger on mesh : preamp (T output) + fast ampli

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 8 X-ray Results K. Karakostas expected exponential behaviour V drift = V mesh + 70 V E drift = 233 V/cm Response versus V mesh

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 9 X-ray Results Saturates for Flow > 0.20 l/h  7 volume/h Gain  when Drift field  K. Karakostas Response versus V drift and Gas flow dependencies V mesh = 395 V E mesh = 33 kV/cm E drift = V/cm

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 10 X-ray Results Time Stability Gain  when Atmospheric Pressure  K. Karakostas

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 11 X-ray Results Gain  when Atmospheric Pressure  Time Stability Slope = ADC/mbar = 2 fC/mbar K. Karakostas

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 12 Cosmics Trigger on 3 scintillators coincidence Charge  210(mV)/25/0.312(mV/fC) = 27 fC Mesh Signal : Preamp (E output) + shaper (gain=25)

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 13 Cosmics Muon in 3mm drift volume = 29e - Gassiplex Readout : Charge  80(1500mV)/1024/3.6(mV/fC) = 32 fC reflects scintillators geometry ADC Counts Nb of Events Mean (Pedestal) = 21 Sigma(Pedestal) = 1.4 muon selection : ADC(Pad with highest signal) > 40 Gain  6900 Chamber mapping (geographic occupancy) V mesh = 410 V V drift = 470 V E mesh = 34 kV/cm E drift = 167 V/cm

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 14 Cosmics Dominant Crosstalk? 20% of the events with a muon have the second highest signal close to the muon pad After muon selection : distance between pad with highest signal (muon pad) and pad with 2 nd highest signal (second pad) Normalised Number of Events (%) PCB routing along X (same Y than muon pad)

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 15 Cosmics Signal(muon pad) / Signal(second pad) Signal(second pad) > 2.8  pedestal : 50% of the events Signal(second pad) > 10  pedestal : 20% of the events  crosswise muons

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 16 Future X-ray source, Cosmics, Test Beam –pad homogeneity –prototypes disparity –more detailed X-talk studies –different gas mixture –efficiency measurements

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 17 Test Beam Mini-calorimeter prototype (analogue readout) –3 MicroMegas 6cmx16cm –2 MicroMegas 12cmx32cm –5 Stainless steel slabs Mini-calorimeter prototype (digital readout) –4 GRPC –2 µMEGAS/GEM –6 Stainless steel slabs Exposure to PS/SPS at CERN or Tevatron in the first half of 2008 to validate the whole chain SiD community is welcomed to participate !

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 18 MicroMegas 12cmx32cm With Analogue Readout 12x32cm 2 active pads

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 19 MicroMegas 8cmx32cm With digital readout (4 HARDROC chips) IPNL-LLR PCB (500  m interpad) Will be the first bulk with chips on PCB active part 8x32cm 2 active pads

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 20 Top (2cm SS) + Drift Cathode + Frame + Gas Supply Bottom (Fibreglass + 2cm SS) 6 Bulks (PCB FE chips + MESH) with 4.5 mm gap Joint DIF Design of a 1m 2 MicroMegas Case with 3 DIF (Digital InterFace) 4,5 mm

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 21 Design of a 1m 2 MicroMegas 10 mm total thickness including –4 mm SS (absorber) –6 mm active volume 10 mm Gas tightness realised on the chamber edges (no need to have gastight PCB)

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 22 Different designs 2 DIF case : FE chip : Hirose connector : Terminaison board, : Flat Printed Circuit (kapton) 3 DIF case Thin pin connector

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 23 Design of the Digital InterFace (DIF) Separated from the slab for more flexibility. up to 100 FE chips (HARDROC or IPNL chip) with power cycling Interfaces with : –The final DAQ (via LDA, …) –The analog DAQ –Neighboring DIFs. –PC through USB for standalone tests and debugs. FPGA ASIC Config ASIC read DAQ interface Slow control Power Supplies next DIF LDA (HDMI) analog DAQ (SCSI) USB JTAG HARDROCs analog output next DIF Monitoring LDO ADC +/-5V 3.3V 2.5V ….. Mezzanine EP3C16F484 SLAB n bulks

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 24 Conclusion First results on small MicroMegas prototypes MicroMegas Techno looks promising and competitive with other gas detectors. Large area prototype under way : towards 1m 3 (project supported by ANR) Possibility to build a larger community

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 25 Backup slides

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 26 X-ray Results T1 Optimisation for Gassiplex readout Charge = 820(1500mV)/1024/3.6(mV/fC) = 334 fC T1 (ns) Mean (ADC Counts) Pad signal : Gassiplex readout K. Karakostas V mesh = 390 V V drift = 440 V E mesh = 32.5 kV/cm E drift = 167 V/cm

Catherine Adloff28 Jan 2008 SiD Collaboration Meeting 27 X-ray Results HV supply dependencies V mesh = 390 V V drift = 450 V E mesh = 32.5 kV/cm E drift = 200 V/cm old and not reliable HV supply No significant difference between HV supplies