Paolo Ciambrone INFN- LNF ODE ECS ODE ECS Off Detector Electronics for the muon system INFN - LNF Servizio Elettronica Laboratori Frascati A. Balla, M.

Slides:



Advertisements
Similar presentations
1 Calorimeter Trigger to L1-Board data transmission Umberto Marconi INFN Bologna.
Advertisements

Protocol Configuration in Horner OCS
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
Off Detector Electronics Upgrade. Outline Present schemes and features New schemes of nSYNC Technology 19/03/2014 S. Cadeddu - INFN Cagliari 2.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
- Software block schemes & diagrams - Communications protocols & data format - Conclusions EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE F. S.
Shell and Flashing Images Commands and upgrades. RS-232 Driver chip – ST3232C Driver chip is ST3232C Provides electrical interface between UART port and.
The 6713 DSP Starter Kit (DSK) is a low-cost platform which lets customers evaluate and develop applications for the Texas Instruments C67X DSP family.
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
A. Homs, BLISS Day Out – 15 Jan 2007 CCD detectors: spying with the Espia D. Fernandez A. Homs M. Perez C. Guilloud M. Papillon V. Rey V. A. Sole.
Using PVSS for the control of the LHCb TELL1 detector emulator (OPG) P. Petrova, M. Laverne, M. Muecke, G. Haefeli, J. Christiansen CERN European Organization.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
Off Detector Electronics System [LNF-INFN] 1 Off Detector Electronics System Fan Unit ODEODE 1 ODEODE 2 ODEODE 3 ODEODE 4 ODEODE 5 ODEODE 6 ODEODE 7 ODEODE.
ATLAS SCT/Pixel TIM FDR/PRR 28 July 2004 Firmware - Matt Warren1 Physics & Astronomy HEP Electronics Matthew Warren John Lane, Martin Postranecky TIM Firmware.
11/01/2006Wilco Vink / Martin van Beuzekom / L. Wiggers L0 ECS Workshop Pile-Up System.
Understanding Data Acquisition System for N- XYTER.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
IWORID P.Randaccio Medipix2 Parallel Readout System 4-th IWORID Amsterdam 8 – 12 September 2002 V. Fanti, R. Marzeddu, P. Randaccio Dipartamento.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
RCU Status 1.RCU design 2.RCU prototypes 3.RCU-SIU-RORC integration 4.RCU system for TPC test 2002 HiB, UiB, UiO.
A.A. Grillo SCIPP-UCSC ATLAS 10-Nov Thoughts on Data Transmission US-ATLAS Upgrade R&D Meeting UCSC 10-Nov-2005 A. A. Grillo SCIPP – UCSC.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
ATLAS DCS ATLAS DCS ELMB PRR, 4 Mar 2002, H.Boterenbrood 1 Software for the ELMB Henk Boterenbrood ATLAS DCS.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory28 March 2003 FED Project Plan 2003 FED Project aiming to satisfy 2 demands/timescales: Module.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Enrico Fois - LHCb Muon ECS Meeting - Roma Synchronization and alignment requirements.
LHCb front-end electronics and its interface to the DAQ.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
Source Controller software Ianos Schmidt The University of Iowa.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
26/11/02CROP meeting-Nicolas Dumont Dayot 1 CROP (Crate Read Out Processor)  Specifications.  Topology.  Error detection-correction.  Treatment (ECAL/HCAL.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Clara Gaspar, December 2012 Experiment Control System & Electronics Upgrade.
JRA-1 Meeting, Jan 25th 2007 A. Cotta Ramusino, INFN Ferrara 1 EUDRB: A VME-64x based DAQ card for MAPS sensors. STATUS REPORT.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
S. Durkin, CMS EMU Meeting U.C. Davis Feb. 25, DMB Production 8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board 550 Production Boards.
TELL1 command line tools Guido Haefeli EPFL, Lausanne Tutorial for TELL1 users : 25.February
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Clara Gaspar on behalf of the ECS team: CERN, Marseille, etc. October 2015 Experiment Control System & Electronics Upgrade.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
Calorimeter CROC PRR CERN Calorimeter ReadOut Card PRR Tests of the CROC Calo CROC PRR – Tuesday 19 December 06.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
PC-based L0TP Status Report “on behalf of the Ferrara L0TP Group” Ilaria Neri University of Ferrara and INFN - Italy Ferrara, September 02, 2014.
DeLiDAQ-2D ─ a new data acquisition system for position-sensitive neutron detectors with delay-line readout F.V. Levchanovskiy, S.M. Murashkevich Frank.
Enrico Gamberini, Giovanna Lehmann Miotto, Roland Sipos
Sheng-Li Liu, James Pinfold. University of Alberta
AT91RM9200 Boot strategies This training module describes the boot strategies on the AT91RM9200 including the internal Boot ROM and the U-Boot program.
PID meeting Mechanical implementation Electronics architecture
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
TELL1 A common data acquisition board for LHCb
Presentation transcript:

Paolo Ciambrone INFN- LNF ODE ECS ODE ECS Off Detector Electronics for the muon system INFN - LNF Servizio Elettronica Laboratori Frascati A. Balla, M. Carletti, P. Ciambrone, G. Felici, M. Gatta

Paolo Ciambrone INFN- LNF ODE ECS 6 Apr ECS interface ECS interface via ELMB cardECS interface via ELMB card –ATmega128 μprocessor with CAN controller –CANbus lines on the backplane 1 branch with up to 16 ODE1 branch with up to 16 ODE –RS232 serial interface for local access ELMB on-board connectionELMB on-board connection –Global reset Startup (programmable)Startup (programmable) ECS ( only way to reset TTCrx and GOL after startup)ECS ( only way to reset TTCrx and GOL after startup) –2 I 2 C bus 24 SYNC24 SYNC 13 GOL, TTCrx, L0 controller13 GOL, TTCrx, L0 controller Configuration, monitor, SYNC histogram read-outConfiguration, monitor, SYNC histogram read-out –1 bus JTAG Boundary scanBoundary scan CAN transceiver powered by ODE power supplyCAN transceiver powered by ODE power supply –Optocoupler must be foresee on PC- CAN interface for galvanic isolation 24 SYNC13 GOL TTCrx Board Controller JTAG Controller JTAG BUS ELMB CAN TRANSCEIVER I 2 C EMULATION JTAG TEST FACILITIES CAN BUS RS232

Paolo Ciambrone INFN- LNF ODE ECS 6 Apr ODE chips and registers 24 SYNC chips24 SYNC chips –24 registers each (17 configuration, 7 monitor) 13 GOL chips13 GOL chips –6 registers each (4 configuration, 2 monitor) 1 TTCrx chips1 TTCrx chips –20 registers (11 configuration, 9 monitor) L0 controllerL0 controller –16 registers (12 configuration, 4 monitor) 690 registers of 8 bits690 registers of 8 bits –Single bit access needed –~ 430 objects in the CAN dictionary –Board configuration required several (many) registers accesses

Paolo Ciambrone INFN- LNF ODE ECS 6 Apr Board configurations DAQ modeDAQ mode –SYNCs, GOLs, TTCrx, L0 controller configuration registers loaded via ECS –Standard acquisition mode DAQ-SYNC Test ModeDAQ-SYNC Test Mode –SYNCs, GOLs, TTCrx, L0 controller configuration registers loaded via ECS –Test DAQ data path Known patterns loaded in SYNC L0 derandomizer via ECSKnown patterns loaded in SYNC L0 derandomizer via ECS “Normal” data readout by board controller“Normal” data readout by board controller DAQ-Internal Test ModeDAQ-Internal Test Mode –GOLs, TTCrx, L0 controller configuration registers loaded via ECS –Test data link integrity and performances Known patterns loaded in L0 board controller via ECSKnown patterns loaded in L0 board controller via ECS 8 bits Pseudo-random sequence8 bits Pseudo-random sequence Trigger test modeTrigger test mode –SYNCs, GOLs, TTCrx configuration registers loaded via ECS –Test trigger link integrity and performances Fixed pattern defined via ECSFixed pattern defined via ECS 8 bits Pseudo-random sequence8 bits Pseudo-random sequence Histogram modeHistogram mode –SYNCs configuration registers loaded via ECS –Histogram readable via ECS DAQ data dumpDAQ data dump –DAQ GOL frame dumped in a internal FIFO –DUMP mode programmable and readable via ECS All TTCrx signals emulated via ECS (L0_YES, BC_res, EV_res, L0_res)All TTCrx signals emulated via ECS (L0_YES, BC_res, EV_res, L0_res) –NO L0_YES needed in test mode

Paolo Ciambrone INFN- LNF ODE ECS 6 Apr ELMB firmware Final ELMB firmware releasedFinal ELMB firmware released –Bridge between CAN (RS232) interface and internal bus (I 2 C, JTag) –CANopen CiA DS-301 standard, limited to the so called Predefinited-Connection-Set but including the SDO Block Download/Upload protocols, and a semi-standard mechanism for Multiple PDO transmission protocol –implementation of an Object-Dictionary with more than 430 objects fully accessible “Standard” ELMB Firmware partially re-written (SEU compliance) for“Standard” ELMB Firmware partially re-written (SEU compliance) for –Optimization of data transfer speed Multiple PDO implemented (data transfer without protocol overhead)Multiple PDO implemented (data transfer without protocol overhead) –Local configuration procedures Single CAN command for board configurationSingle CAN command for board configuration Default settingDefault setting Histogram and dump FIFO downloadHistogram and dump FIFO download –Parallel internal access to minimize dead time –Use of internal EEPROM for data storage; –Implementation of the In-System-Programming, via Bootloader firmware, for the program-code renewing of the ELMB processor

Paolo Ciambrone INFN- LNF ODE ECS 6 Apr Test program Serial interface for local accessSerial interface for local access –RS232 –Program on ELMB flash ram Shell for command decodingShell for command decoding

Paolo Ciambrone INFN- LNF ODE ECS 6 Apr Test program ODE tester programODE tester program –Win32 application (visual basic + DLL in C language) –Management and work-benching of a ODE crate via CAN bus Bus traffic monitor (detailed information for each intercepted message)Bus traffic monitor (detailed information for each intercepted message) Node status monitor and control via Network-Management (NMT) facilityNode status monitor and control via Network-Management (NMT) facility Scripting language console for high level commandScripting language console for high level command CAN-JTag command translator (to be implemented)CAN-JTag command translator (to be implemented) Tool panels forTool panels for –Object-Dictionary access in reading and writing; –CANopen Error-Control-Protocols management: Node-guarding/Heartbeat, Life-guarding; –In-System-Programming; –SYNC chips histogram downloading and graphing; –ODE test procedures; –configuration and default parameters storing/retrieving; –etc... (?)

Paolo Ciambrone INFN- LNF ODE ECS 6 Apr ODE framework Working in progress …Working in progress … –Translate some ODE tester functionalities in PVSS script but: ODE is an “optical” board, therefore its output required an “optical” receiver (TELL1 and Trigger board) to be controlled at he same timeODE is an “optical” board, therefore its output required an “optical” receiver (TELL1 and Trigger board) to be controlled at he same time –Some procedures (alignment, pulsing, …) required a contemporary control of other boards (Service Board, Dialog, …) –What the global experiment ECS want from us … –What can be useful for the Muon detector for monitoring and debug … –Manpower required and time schedule … Only 1 person involved in LNF (perhaps not enough)Only 1 person involved in LNF (perhaps not enough)