Beam Test Plans at the KEK Fuji Beam line (as of Nov-4 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Slides:



Advertisements
Similar presentations
Comparison of 3 types of scintillator strips and 2 types of reflector films Miho NISHIYAMA Shinshu-U Light yield of 3 scintillator strips have been measured.
Advertisements

Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
Beam Test Plans at the KEK Fuji Beam line (as of Nov ) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.
Setup of Gain Monitoring System with Mr. Uozumi Kobe Univ. Hiroko Ikeda 18,May 2007.
GLD Calorimeter Status Oct 学術創成会議 S. Uozumi Shinshu University FJPPL meeting held at the end of September. Preparation underway toward the ECAL.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
Beam test of scintillator strips Miho NISHIYAMA Shinshu University ・ scintillator strip calorimeter ・ Kuraray scintillator strips and KNU extruded ・ the.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Report from CALICE Beam Test 2 nd DAQ taking period and Plan for 3 rd DAQ period S. Uozumi Jul ScECAL meeting.
Study of the MPPC performance - R&D status for the GLD calorimeter readout – Nov 6-10.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK)
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Scintillator-based ILC detector R & D Status and Milestone DongHee Kim Kyungpook National University Joint Korea-Japan Collaboration KPS meeting, Spring.
Asian Test Beam Facilities Satoru Uozumi Kyungpook National University Mar-29 th 2010 Beijing China IHEP Beijing TBF Russia.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
KEK BT Summary &Plan Shinshu University Miho Nishiyama.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
GLD-CAL and MPPC Based on talks by T. Takeshita and H. K. Kawagoe / Kobe-U 2005-Sep-16 MPPC
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group (KNU, Kobe, Niigata, Shinshu, ICEPP.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Scintillator Strips DongHee Kim Kyungpook National University Daegu, South Korea.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
1 Japan-US Research Budget 2007 & SciBooNE Upgrade T. Nakaya (Kyoto) SciBooNE 16, 2007.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Comparison of 3 types of scintillator strips Miho NISHIYAMA Shinshu-U Light yield of 3 scintillator strips have been measured using b-ray source. 1. fiber.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Jet Energy Measurement at ILC Separation of jet particles in the calorimeter is required for the PFA  Fine granular calorimeter is necessary. Particle.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan Japan-Korea Joint Shinshu Univ.
Report on the Beam Test Analysis Satoru Uozumi Apr GLDCAL meeting Topics of this talk are: Comparison of various MIP calibration methods Some problems.
Short Summary of the Japan- Korea KNU Oct GLDCAL meeting S. Uozumi (Shinshu) 3 rd Japan-Korea joint meeting is held on Oct at Kyunpook.
The Scintillator-ECAL 2 nd Prototype S. Uozumi (Kobe) Jun
Tokubetsu-shishin kickoff meeting, Sep-13 th 2011 Satoru Uozumi Korean Activities on Calorimetry in ILC History of Japan-Korea collaboration.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
Plan for the KEK beam test in November 2007 and Beyond Satoru Uozumi (Shinshu) Oct-1 Japan-Korea KNU.
S-2S meeting Toshiyuki Gogami 15 Oct Contents TOF detector Kyoto University.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
Scintillator-ECAL Beam Test Scintillator-strip ECAL Beam DESY My task and achievement at DESY Contents Satoru Uozumi Shinshu University, Japan Nov-23.
IFR Detector R&D status
RD51-WG X June test beam experience: useful information for October
Preparation for CERN test beam
Prototype activities update
ScECAL+AHCAL+TCMT Combined Beam FNAL
Installation and Run Plan
R&D of MPPC in kyoto M.taguchi.
Presentation transcript:

Beam Test Plans at the KEK Fuji Beam line (as of Nov ) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss and finalize the plan !

People D. H. Kim (KNU) Nov14~22? J. S. Suh (KNU) ?~? D. Kong (KNU) ?~? K. Kawagoe (Kobe) Nov 17~19, 23~25 D. Jeans (kobe) Nov15~end T. Kaneko (Kobe) Nov15~end H. Ikeda (Kobe) Nov15~end K. Ueyama (Kobe) Nov15~end T. Takeshita (shinshu) Nov19~? S. Uozumi (shinshu) start~end M. Nishiyama (Shinshu) start~end Y. Sudo (Tsukuba) start~end T. Ikuno (Tsukuba) start~end H. Yamazaki (Tsukuba) ? ~ end Y. Takahashi (Tsukuba) start~end “start” means Nov-12 on Monday. “end” means the date where everything is done (includes possible delays). Let me know if there are modifications needed on the participating period.

Overall schedule ~Nov-12 th : Gather equipments at KEK Nov 12 th ~24 th : Start preparation of DAQ, SCT and SciFi system at Fuji B4 by people who can participate. Nov 16 th : Almost participants are at KEK, take radiation training and have kick-off meeting. Nov 17 th,18 th (weekend) : Prepare everything as much as possible Nov 19 th ~20 th : Beamtime starts, setup on beamline Nov 21 th ~ 24 th : As soon as the setup finished, start comissioning run followed by strip scan and run as long as possible Nov 25 th (could be extended) : Withdraw from beamline

Experimental setup

Strips to be tested - Let’s start with newer stuff, since beam time and rate are limited - 1.Extruded 3 mm thick direct readout without TiO 2 2.Extruded 3 mm thick fiber EMBEDDED readout with TiO 2 3.Extruded 3 mm thick fiber EMBEDDED readout without TiO 2 4. Extruded 3 mm thick fiber readout with TiO2 5. Extruded 3 mm thick direct readout with TiO2 6. Extruded 3 mm thick fiber readout without TiO2 7.Kuraray strip 3 mm thick fiber readout 8.Kuraray strip 3 mm thick direct readout 9.Kuraray strip 2 mm thick direct readout Old ones Newly produced Kuraray as Reference Will start with (1~3)+7 with ~3 different strips, and if time permits test 9, 8 and 4, and if time permits we will test 9, 8 and 4~5. Use the same MPPCs if possible, for direct comparison. Detailed plan will be finalized at kick-off and on-shift meeting.

Run Plan and DAQ Time Estimation (assuming only SciFi is available.) Assume ~1000 events / mm 2 (is it enough?) 10 x 45 x 1000 = events per a strip 450k events / 10 Hz = 750 min per a strip Random trigger run ~ 5 min, taken once per an hour 12~13 hours to scan one strip. Configuration change ~ 2 hours (?) If the SCT is available for trigger and tracking, DAQ time will be improved and multiple layers can be scanned at once. Need to take data with MIP position scan and Random trigger (pedestal and MPPC gain by dark noise) With each type of scintillator.

Startup jobs DAQ system and Electronics (1 staff+1 student) –CAMAC+NIM+VME(for SCT) + temperature monitoring system Beamline devices (1+3) –Manage trigger, veto, SciFi, SCT hardware –Installation, cabling, alignment, HV, threshold, making trigger logic. Detector (1+1~2) –Assemble scintillator-strip module, alignment, connection, cabling. –Install temprature monitoring sensors at the same time. Analysis codes (1+0~1) –Discuss data format with DAQ team –Prepare macro for “on-the-fly” analysis

Shift plan 3 shifts per a day (0~8, 8~16, 16~24), 2~3 persons (at least 1 staff + students) in one shift. Official language is English during the beam test ! To share all the information, DO NOT use Japanese as possible as you can ! Contact me anytime (Satoru : ) if you have any trouble during your shift.

Data Monitoring & Analysis We will perform “on-the-fly” analysis during data taking. Need always to watch gain (by pedestal run), light yield, and position dependence for all the strips on beamline. Better to plot the temperature, too. The analysis will run on DAQ machine (since the beam rate is not high, we don’t need to care about dead time from analysis jobs).

Scintillator-strip assembly spacer As done at the DESY BT, strips will be mounted in acrylic frame, and the scintillator layers will be installed in the detector frame and light shielded. Flat cables will be connected to CAMAC ADC after signal amplification by ATLAS ASD. Frame

Scintillator-strip assembly

Equipments needed CAMAC crate & module (ADC, coinc. reg.) NIM crate & module VME crate & module DAQ PC with CAMAC & VME interfaces Bias voltage source Movable stage and controller SciFi tracker, cables Trigger counter ATLAS SCT ATLAS ASD and Cables Temperature monitoring system Drivers, testers, cutters, black-sheets, tapes, etc…

Stuffs to borrow from Kobe

Stuffs to borrow from Shinshu

Stuffs to borrow from Tsukuba

Shipping of the equipments (from Shinshu and Kobe to KEK) Please ship equipments to Miyamoto-san at KEK with sign of “GLDCAL beamtest equipments”. Make sure stuffs will arrive on time (by Nov-12 Monday). Bringing with you will be another option. 〒 茨城県つくば市大穂 1-1 高エネルギー加速器研究機構 素粒子原子核研究所 宮本 彰也 教授

Radiation training / accommodation Bring certificate of rad-worker from your institute! In addition to the rad training, beamline lecture will be needed. It will be held for us on Oct-16 (Fri). For accommodation, I will negotiate to KEK users office on Nov-6. For more information, I will keep you updating via . Contact me if you have any questions.

Is there anything still missing?

Backup info.

The KEK new test beam line North Gate Fuji experiment hall Bus-stop to arrive from Tsukuba station Bus-stop to depart to station Mt. Tsukuba See for travel info to KEK. (buses are available from Narita Airport to Tsukuba station, and station to KEK.)

KEK new test beam line ( but in Japanese.) Experimental Stage (7 x 4 m) Electron beam line in Fuji experiment hall, 3 rd floor in basement. Make use of bremss photons from KEKB ring p = 0.5 – 3.4 GeV/c,  p /p = 0.4 % Rate ~ GeV Beam spot size = +- 1cm KEKB tunnel

Beam area catwalk Stair Fuji exp-hall 3 rd floor in basement EV Counting room

Memo (just not to forget) Beamline alignment Log book ? Noise rejection Need to find place and tools in KEK for soldering, machining, drilling and so on. Daily-meeting schedule ? Light shielding frame