Helen Heath, Magnus Loutit.  Useful meetings at CERN before Easter ◦ ML and HH met with John Fullerton from BE for practical advice on the CEDAR motor.

Slides:



Advertisements
Similar presentations
RJ Mann Catalytic Monitoring Systems. RJMCMS 100 Low Cost Single Engine Monitoring System Monitors Pre and Post Catalyst Temperatures, Differential Pressure.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Copyright, 2006: Invisible Service Technicians, LLC Invisible Service Technicians, LLC Invisible Service Technician Monitor Activation Process: IST MaintSelectionV3.php.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
André Augustinus 16 June 2003 DCS Workshop Safety.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
27/10/ PHOS Cooling status (1-27 Oct) Brief History: 28 Sep start cool down. Steps (by liquid) was: +17, +5, -3, -10, -15,
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton.
UNICOS Objects (CPC) 11/02/14 UNICOS, CERN1 CERN, EN/ICE, UNICOS Team.
CheckSystem 2.1 Portable Test Systems Page 1 April 2011.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
CEDAR Cooling (CEDAR Meeting 23 rd May 2011) Tim Jones.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS Vacuum Objects Specifications Review Sebastien Blanchard TE/VSC Interlocks,
DSS Advisory Board Christoph Schäfer Rack Safety System.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
NetVuze Precision Network Meter standalone, easy to use, networked with data logging.
Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
BioWin ®. Bio Gas – The alternative energy source of the future! BioWin ® - Bio Gas Analysis of the future!
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
Performance Tests and Control for the TRD-HV A. Markouizos, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE DCS Workshop CERN.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
New items for final exam. An indication of your current comfort level to the final exam is your responses to the following 8 practice question set. Pre-presentation.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Overview What is Arduino? What is it used for? How to get started Demonstration Questions are welcome at any time.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
Muon System Safety Issues Burkhard Schmidt.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Adapting Muon Endcap UF/PNPI HV system for GEM V. Barashko, A. Korytov, A. Madorsky, G. Mitselmakher University of Florida/Physics N. Bondar, V. Golovtsov,
André Augustinus 16 September 2002 PVSS & Framework How to get started.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
NA62 CEDAR PMT Cooling Update Tim. Chiller Investigations Web search identified Huber as one possible supplier – Europe-wide – Popular at CERN UK sales.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
OD HV Upgrade Hans Berns Jeff Wilkes U. of Washington 10/14/01.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
André Augustinus 9 October 2006 Interlocks update.
Invensys Controls Europe An Invensys Company EWCM 41x0 family New 32x74.
DCS and Motors Helen Heath, David Cussans, Magnus Loutit University of Bristol.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
CheckMeter 2.1 Portable Working Standard Page 1 March 2009.
World Leaders in Combustion Management Solutions Remote Monitoring & Data Logging C.E.M.S I/O Modules DTI Autoflame Training,
DCS Instructions K. Grogg, M. Weinberg, M. Grothe 1/24/20161.
60kW Thermosiphon control system
19/10/11FV 1 Behavior of generic HV channel. Mail’s survey: appeal for general policy VF2 19/10/11 Patrizia: “Based on the running experience of NA48,
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
ACT20X Ex isolator/ amplifier. Page 2 ACT20X (Ex isolators family) Overview - Connects to process equipment in Class/Div, or Zone 0 - Zone 2 areas - ACT20X.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
CERN Summerschool 2007 Monitor and Control of the CANbus power supplies of ATLAS’ MDTs Wilco Koppert (UU)
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
How SCADA Systems Work?.
Robert Gomez-Reino Garrido
Presentation transcript:

Helen Heath, Magnus Loutit

 Useful meetings at CERN before Easter ◦ ML and HH met with John Fullerton from BE for practical advice on the CEDAR motor controls ◦ Also met with the NA62 DCS group to discuss Motor controls and DCS in general  Detailed minutes of the DCS meeting at

 Information from JF ◦ Once set up the CEDARs are very stable.  CEDAR adjustment is not anticipated to be performed regularly during runs – expert operation ◦ X and Y motors currently take ~30s from one end to the other. ◦ Approach to ~2mm and then pulse.

 EN/ICE group will develop the PLC system and integrate into a UNICOS application ◦ There involvement is now approved ◦ Magnus has produced a Motor Control Specification (attached) ◦ EN/ICE will translate into their standard project specification.  Equipment will be ordered through EN/ICE

Requirement/Description document with details of the control logic to be prepared and sent to EN/ICE: as soon as possible (the week after Easter) Approval of the project by EN/ICE: no later than week of 23 April,  Delivery/Commisioning deadline: mid-June

 Considered Document prepared by Tim  Detailed discussion ◦ Queries circulated in an updated document. ◦ These need to be clarified

Assign to channel a symbolic name Set output voltage (VSET) Set max. output current (ISET) Set output voltage software limit (SVMAX) Set voltage ramp-up speed (RAMP-UP) Set voltage ramp-down speed (RAMP-DOWN) Set TRIP parameter Enable/disable POWER ON option Switch channel ON/OFF Monitor output voltage (VMON) Monitor output current (IMON) Monitor channel status

 Draft Document has TTRP Time at current>ITRP ◦ Not a standard parameter. Is this necessary? Or is setting a trip current sufficient? If not why not? Trip would normally produce a fatal alarm. ◦ Note there is expected to be over and undervoltage warning as well as fatal alarms  Expect Operating voltage (VSET) to be set every run but other parameters would be static from run to run. ◦ Are there any issues with this?

 Board Temperature ◦ Does this need a fatal alarm? It would seem likely but should there be a warning before? Warning might cut off board.  Connection Error ◦ Is this a cable disconnected from the card (seems unlikely) or a loss of control (Note it wasn’t clear that the hardware can detect a disconnected cable).

 We need to add physical layout of the channels – which channel is which PMT ◦ Any logical arrangement is fine someone just needs to do this. Who?

 Nino – control not included in the “012 Technical Run  TEL62  PMT pulser

 Old Gas controls are standalone and will be used in ◦ Will not be integrated in the DCS  Need to discuss whether data will be displayed.  Provision for 8 temperatures to be read out ◦ DCS group would like to know where the sensors are. Are there warnings or are these just for display?

 Status of cooling could be read by the CEDAR Motor control PLC if cooler is near CEDAR ◦ If so then this needs to be added to the motor- control project.  What sort of flow meters are envisaged and how are they connected.  Enclosure monitoring. ◦ Require mapping of temperatures to ELMB channels ◦ Where are the probes?

 Procurement of motor system  Update of DCS document