New Fast Wire Scanner for Booster Mechanical Design review 2016_01_19 2016/01/19 1 On behalf of: - EN/MME: Alain Demougeot, Nicolas Chritin - BE/BI: Dmitry.

Slides:



Advertisements
Similar presentations
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
Advertisements

Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
SPS New Wire Scanner Mechanics Review
S.Burger, R.Sautier, N.Sharmazanashvili
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
Beam Wire Scanner for PS/SPS/PSB Update on Motor Supplier Investigations Dmitry Gudkov BE-BI-ML.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.
BWSRE, B.Dehning 1 Bernd Dehning CERN BE-BI
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Pixel Upgrade Phase I CMS Upgrade Week 27. April 2010 R. Horisberger, PSI.
NEW FAST WIRE SCANNER Manufacturing review Emilien Rigutto
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
Beam Wire Scanner for PS/SPS/PSB Update on Motor Supplier Investigations - 2 Dmitry Gudkov BE-BI-ML 24-July-2015.
Vacuum pipe deflection Mariusz Juchno, Paolo Ferracin, Paolo Fessia 28 January, 2014.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
Beam Wire Scanner for PSB -Update Dmitry Gudkov BE-BI-ML 06-November-2015.
Beam Wire Scanner for PSB -Update Dmitry Gudkov BE-BI-ML 26-November-2015.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Lukasz Krzempek TE-VSC-DLM 28th WP8 Bi-weekly meeting Tuesday, 24 November 2015 Vacuum layout (Experimental side)
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
Beam Wire Scanner for PS/SPS/PSB Mechanical 3D Model Review (for BE/RF-ABP Impedance meeting 02.Nov.2015) Dmitry Gudkov Mechanical Engineer BE/BI-ML.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Beam Wire Scanner for PS/SPS/PSB Current status and Schedule Dmitry Gudkov BE-BI-ML.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
THE NEW FAST WIRE SCANNER DESIGN FOR THE PSB
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Beam Wire Scanner for PS/SPS/PSB Motor Selection Dmitry Gudkov BE-BI-ML.
Straw Individual assembling device and the straw linearity preliminary measurements L.N.Glonti
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
BWS Design meeting Jose Luis Sirvent PhD. Student XX/03/2014
LIU Wire Scanner Project
Gaspard-Hyde-Trace workshop 2015
Brief Status SPS Prototype PSB Prototype Installed in LS1
Awake Electrons Gun Introduction. - How works an electrons gun
new straw end plug: D=10.6 mm straws support frame Levan option
Wire Scanner / A.Demougeot
Status of the CLIC DR wiggler design and production at BINP
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
Booster ring ICL /06/14 Nicolas Chritin EN/MME Cedric Delory EN/MME
Fast Wire Scanner Prototype Mechanical Design
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Vacuum chamber for experiment HIHEX at FAIR
Wire Scanner Mechanics
Status of the BI Work Package in the LIU-PSB frame
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
Beam Wire Scanner for PSB
New Design for Beam Test Structure
Injection direction This area is OK , because the pin into the tube have a supporting point in this area . The injection force push the pin to the other.
LIU Wire Scanner Series Costs
Beam Wire Scanners (PS prototype and LIU series)
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Magnetic gap calculation
Beam Finder Wire Assembly Undulator System
On the accuracy of port assembly at Wendelstein 7-X
Gas cell apertures with dimensions (original)
BGC Collaboration Meeting –
Simplified Procedure Draft
Presentation transcript:

New Fast Wire Scanner for Booster Mechanical Design review 2016_01_ /01/19 1 On behalf of: - EN/MME: Alain Demougeot, Nicolas Chritin - BE/BI: Dmitry Gudkov, Paolo Magagnin, William Andreazza

Overall view 2 Drawing in CDD/EDMS: PSBBWSRA /01/19

Overall view 3 17 Kg BEAM ? ? 23 Kg 2016/01/19

Overall view 4 Inner Ø120mm (Beam tube) 480 mm Ø354 mm 475 mm R153mm 2016/01/19

Kinematic Principle 5 Drawing in CDD/EDMS: PSBBWSRA /01/19

Stepped vacuum chamber 6 3 thin walls: 0.3mm 0.4mm Drawing in CDD/EDMS: PSBBWSRA /01/19

Sub-assemblies /01/19

Shaft /01/19

Adjustments: /01/19

Stator/rotor Assembly /01/19

Final assembly /01/19

/01/ mm Installation or dismantling

/01/19 Minimum gap 12mm

14 Ready: - WS + vacuum vessel 3D design  36 drawings ready for control #1 To be finalized: - Forks - Optical disc - Adjustment table + frame - Handling device ?? Conclusion 2016/01/19