INTERCONNECT WORKING GROUP 28 JANUARY 2005 BT’s Thinking about Next Generation Interconnect in 21CN DARYL DUNBAR HEAD OF 21CN CUSTOMER SOLUTIONS The information.

Slides:



Advertisements
Similar presentations
Migration to All-IP Networks: Directions and Deployment
Advertisements

BTs Plans for its NGN EU Open Workshop on NGN Policy and Regulatory Issues 22 June 2005 Ittai Hershman Director, 21CN Commercial Development BT Wholesale.
Figure 7-1 Softswitch Components Signaling Gateway Feature Server Softswitch Universal Media Gateway SGCP SIP MGCP MGCP (Media Gateway Control Protocol)
0 0 0 BBWF Madrid October 2005 Access-independent Core Networks: Converging towards all-IP Andy Jones Head of Transmission & Interconnectivity Vodafone.
SIP & SS7 (SIP-02) Monday - 09/10/07, 10:00-10:45am.
Voxiplus.
Upgrade of UK Interconnect Signalling Doug Turner : BT AWG Chairman.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect & Portfolio Working Group NGN Interconnect - PSTN Emulation Blended Rate.
An evolutionary approach to G-MPLS ensuring a smooth migration of legacy networks Ben Martens Alcatel USA.
This update is a BT perspective of Working Group status including input from the Co-Chair call of 7 th September Nigel Scott 13 th Sept 05 Consult21 -
Enabling Architectures
Thank you.
Voice over Internet Protocol (VoIP) Training and Development.
VoIP lets you make toll bypass voice and fax calls over existing IP data networks instead of the public switched telephone network (PSTN). Today businesses.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
6. Next Generation Networks A. Transition to NGN B
©Ofcom NGN-based competition: An Ofcom perspective Dr Stephen Unger Director of Telecoms Technology 24 March 2005.
NICC Review ~ 2003 Bill Hawkins NICC Operational Plan Continued “austerity” regime, focus on –Commercial imperatives –Regulatory critical issues.
Is VoIP Dead? Where Does it Stand? James Rafferty Product Line Director, Dialogic September 3, 2009.
Rkantola/ /s IP Telephony and Network Convergence
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
Going faster and staying in control - Building the world’s biggest NGN Tim Hubbard Head of Technology Futures.
Caspian Opportunities & Challenges Eugene Pradas VP, Global Voice Sales Europe April 2010.
Can VoIP Replace “Legacy Voice” in Asia? Steven Rago Principal Analyst, iSuppli Corporation.
NGNs – Network Nirvana? David Goldie, Chairman. This document is uncontrolled if printed or saved to a non-authorised site. Slide 2 Opal, the B2B division.
1 © 2002, Cisco Systems, Inc. All rights reserved. H.323 Voice Market H.323-Forum, November 2002, New York, USA H.323 Voice Market Haluk Keskiner Cisco.
NGN Multi-Service Interconnect Link (NGN-MSIL) Robin Charles.
NGN INTERCONNECT WORKING GROUP 4 April 2005 Update on the TSG Project Plan and Technical Work Paul Griffin – Network Architect, Energis Nick Ireland –
© Copyright 2007 Arbinet-thexchange, Inc. All Rights Reserved. Voice Peering Steve Heap Chief Technology Officer.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 11 – 24 September 2007 Information.
Anthony Stephens 21CN Customer Engagement 1 21CN High Level Consultation Plan The following plan provides a four month view of key consultation themes.
© Copyright 2007 Arbinet-thexchange, Inc. All Rights Reserved. VoIP Peering Pilot Using the Internet2 Backbone.
SIP & SS7 James Rafferty, Cantata Technology September 10-12, 2007 Los Angeles Convention Center Los Angeles, California 3 Agenda Overview.
NGN Interconnect Update JOINING THE THREADS 25 May 2005 FOR WG DISCUSSION ON 3 JUNE.
Gary E. Barnett President and Chief Executive Officer Aspect Communications VoIP and the Future of Customer Care.
Narrowband & IP Strategy Steve Wickenden & Dave Hughes 12 November 1999.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Director Industry Development Jo Upward FORWARD LOOKING STATEMENTS – CAUTION ADVISED Certain statements in this presentation are forward-looking and.
Introduction to 21CN Resilience Tim Hubbard Head of 21CN Solutions Strategy.
ENUM Presentation to Large Business User Panel 26 September 2001 Justin Moore.
21CN Legacy Interconnection Working Group 17 th December 2004 Auditorium City Place, Gatwick.
DELIVERING BT’S 21 ST CENTURY NETWORK INDUSTRY WORKING GROUP ON MSAN ACCESS & INTERCONNECTION 22 October 2004.
Multi-Service IP Interconnect 6 th May Multi-Service IP Interconnect A Multi-Service Interconnect Link to support PPCs PSTN/ISDN DataStream Multi-Media.
PTCL Training & Development
1 Presentation_ID Mobile Wireless Internet Forum (MWIF)
Adoption of IP in the Next Generation Contact Center Rupesh ChokshiGautham NatarajanDirector, AT&T.
BT announce their 21 st CN Plans Alastair Adamson ETUG Telecommunications Coordinator – 15/07/04 Does the Electricity Industry have any reason to be concerned?
Intelligent Interconnects in the VoIP Peering Environment
Jackie Voss Manager, Global Standards Development ATIS All-IP Transition Initiatives September 30, 2015.
Softswitch SIP Proxy Server Call Manager IP Telephony Router Tablet PC IP PBX Class 5 Switch Class 4 Switch PBX Access Gateway Broadband Router Voice Gateway.
International Telecommunication Union Workshop on Next Generation Networks: What, When & How? Geneva, 9-10 July 2003 NGN Research in China Jiang lin-tao.
Implementation & Migration Working Group 18 th January 2006 Kevin Young Interconnect & Numbering Services The information in this presentation relates.
Consult 21 Interconnect Working Group 7 Nov 2005 Ian Self Virtual Interconnect Capacity Product Outline The information in this presentation relates to.
Partial Private Circuits Kalpesh Brahmbhatt 31 October 02.
Colombo, Sri Lanka, 7-10 April 2009 FORUM ON NEXT GENERATION STANDARDIZATION (Colombo, Sri Lanka, 7-10 April 2009) Session Moderator Ghassem Koleyni An.
An SAIC Company Rich Fialkoff Executive Director Customer Care and Billing Solutions (732) March 15, 2001 Operations Support.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 14 – 03 November 2008 Information.
MSIL TECHNICAL CONSULTATION 28 February 2006 Steve Wright The information in this presentation relates to plans currently under development and subject.
1 DLE to NGS Migration: Contracts Clinic 24 th February 2006 The information in this presentation relates to plans currently under development and subject.
Next Generation Networks Australian Communications Industry Forum (ACIF) ITU-T NGN Workshop, July 2003 Peter Darling Manager, ACIF NGN Project.
PTCL Training & Development1 NGSDH Dr Muhammad Khalil Shahid NGSDH Dr Muhammad Khalil Shahid.
Defining the Next-Generation Access Network Slideware Versus Reality Robert A. Bivin.
1 Session Controllers Micaela Giuhat AVP Product Management Netrake
Consult21 PC/PPC WG update John Lee, Energis Industry Co-chair 16 May 2005.
For discussion purposes. No implementation assurances Interconnect Links and Congruent Call pricing Robin Charles, Clive Feather and Ian Self The information.
Tim Wright BT’s 21st century network TRIS - TISPAN WG4 workshop on NGN Interconnection and Numbering Copenhagen 18 January CN Principal Consultant.
Objectives and Introduction to NGN Issues John Horrocks
ETSI/TRIS Workshop on NGN Interconnection Effects of incumbent migration to NGN on competing networks Paul Rosbotham 18 th January 2006.
Synchronous Optical Network (SONET)
Presentation transcript:

INTERCONNECT WORKING GROUP 28 JANUARY 2005 BT’s Thinking about Next Generation Interconnect in 21CN DARYL DUNBAR HEAD OF 21CN CUSTOMER SOLUTIONS The information in this presentation relates to plans currently under development and subject to consultation, and may be subject to change. Detailed implementation depends upon a number of factors including the capabilities of suppliers and the final 21CN network design.

Interconnection Today Distance and Element Based Voice Stovepiped NNIs for Frame and ATM, not IP Partial Private Circuits using PDH/SDH

Vision of Interconnection in 201x Converged Fat-Pipe SDH Interconnects (e.g. STM-16) Voice as Data Application (e.g. SIP over IP NNI) “Death of Distance” (e.g. Handful of Interconnect Pipes at Key Nodes)

Interconnect Transition Planning Parameters Demand Drivers for New-Wave Services Access Mode and Protocols Cost Management Commercial Interconnection Products and Regulation

Demand Drivers for Wholesale New-Wave Services OLO Product Planning for Next-Gen Voice and Data Services Service Providers Expected to Enter Voice Market Brand New Entrants Expected (e.g. Vonage for Global VoIP)

Access Mode and Products Sustain PSTN C7-based TDM to NGS Tandems (E1, IUP or ISUP) C7-based TDM to 21CN Media GWs (STM-1, UK ISUP) Replicate PSTN C7 Encapsulated in SIP over IP Transport (SIP-I aka ITU-T Q1912.5) Transform PSTN SIP over IP NNI (pure-play, no C7 constraint) Transform Data NNI Would support both SIP and a multi-operator “MPLS-like” data standard

Cost Management Line Cost Optimisation BT recognises the need of our customers to predictably optimise line cost But, flattening the network is beneficial to all in the long term And converged interconnection will reduce all our costs Re-Arrangement Cost Minimisation BT recognises that re-arrangement of interconnect circuits is costly So, we are working on a plan that minimises forced TDM migration While we mutually plan for next-generation interconnects Legacy Interconnect Proposal Details Follow Later Today

Interconnect Product Prioritisation How should we prioritise? Classic problem: Together we can do 2 well, but doing 3 is very hard We must Sustain; but, should second be Replicate or Transform? Transform (Pure-Play SIP over IP NNI) Sustain (C7 over TDM) Replicate (C7 encapsulated in SIP over IP Transport)