ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.

Slides:



Advertisements
Similar presentations
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
Advertisements

DSWG Update to WMS May 17, DSWG Goals Update.
1 New Resource Qualification Testing Sandip Sharma Supervisor, Operations Analysis New Generation Information Forum ERCOT Public November 4, 2014.
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
CCO Quality Pool Methodology February 7, 2014 Lori Coyner, Accountability and Quality Director 1.
Presented By: Mark Patterson ERCOT Manager, Demand Integration November 29, Minute ERS Pilot update to TAC 1.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
NPRR425 - Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR Art Deller, P.E. RARF Workshop 8/29/13.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Weather Sensitive ERS Training Presenter: Carl Raish Weather Sensitive ERS Training Workshop April 5, 2013.
1 1 Beacon Power Corporation Energy Storage – Regulation Issues Prepared for: Emerging Technologies Working Group January 5, 2011.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Final Report on Fast Responding Regulation Service (FRRS) Pilot Project TAC March 27th, 2014.
NPRR 571 ERS Weather Sensitive Loads Requirements Carl Raish, ERCOT QSE Managers Working Group November 5, 2013.
Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
ERS Update – DSWG Presentation September 21, 2012.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Final Report on ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) PDCWG March 26th, 2014.
1 Nodal Credit Update at WMS June 16, 2010.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
14 Minute Ramp Period Testing Workshop June 30, 2009.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
QSE Managers Working Group November 7 th 2011 NPRR 334 – Additional Analysis.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
Responsive Reserve Service Deliverability Review September 15,
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
1 Cutover Daily Call 10:30 AM November 23, :30.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
Analysis for the Determination of X, Y, and Z for Compliance Monitoring NATF.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
1 Frequency Control Task Force Report to WMS July 19 th, 2006.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
Preliminary Report on ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 12th, 2013.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) PDCWG April 26, 2013.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
ERCOT Public 1 Future Ancillary Services Team (FAST) and Technical Advisory Committee (TAC) Workshop ERCOT Staff July 25, 2014.
Market Trials Update NATF March 2,
CONTRACT ADMINISTRATION
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Presentation transcript:

ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS

2 Agenda 1.Declining Grid Inertia of ERCOT Interconnection 2.ERCOT Frequency Profile Jan 2011 through Feb-2012 ERCOT Frequency Profile – 4 second data ERCOT CPS1 Score 3.Qualifications and Performance Criteria 4.Purpose of FRRS Pilot Program What is FRRS? Why do we need it? 5.Fast Regulation Deployment Logic Fast regulation to complement the traditional regulation 6.Expected benefits of Fast Responding Regulation 7.How will FRRS be procured (priced and paid for) in the Pilot? 8.Implementation Schedule for the Pilot 9.Questions ERCOT Public

3 Declining Inertial Frequency Response in ERCOT ERCOT Public _and_Impact_of_.pdf

4 ERCOT Public ERCOT Frequency Profile Jan 2011 through Feb-2012

5 ERCOT Public

6 Pilot FRRS Qualification Criteria 1.Resources providing FRRS must be able to follow FRRS signal 2.Resources requesting FRRS-up qualification a)Must be able to respond to large frequency decay triggered by loss of generation. b)Resources providing FRRS must provide full MW response within 60 cycles after frequency hits Hz trigger. c)This capability must be demonstrated by the Resource Entity using high speed Frequency and MW data with resolution no less than 32 samples per second. d)For the purpose of demonstration, the Resource Entity may use off-set of -0.2 Hz to demonstrate the MW response. ERCOT Public

7 Pilot FRRS Qualification Criteria (continued) 3.Resources requesting FRRS-down qualification a)Must be able to respond to high frequency. b)Resources providing FRRS must provide full MW response within 60 cycles after frequency hits Hz trigger. c)This capability must be demonstrated by the Resource Entity using high speed Frequency and MW data with resolution no less than 32 samples per second. d)For the purpose of demonstration, the Resource Entity may use off-set of +0.2 Hz to demonstrate the MW response. 4.Resources providing FRRS (Up and Down) must be able to continuously remain deployed for up to 8 minutes with 95% or more of the requested MW for successful qualification. 5.Resources that successfully demonstrate the requirement above will be qualified as FRRS capable Resources for the capacity that was requested for qualification. ERCOT Public

8 FRRS Performance Criteria Resources providing Fast Responding Regulation Service shall meet the following performance criteria 1.MW response provided by Resources carrying FRRS in response to ERCOT FRRS signal shall be at least 95% and less than 110 % of the ERCOT deployment instruction for that Resource. 2.Resources must meet the requirement stated in (1) for 95% of all deployments within a month. 3.When FRRS-up is not fully deployed, for sudden frequency decay where frequency declines lower than Hz, Resources providing FRRS-up shall immediately and appropriately respond to the declining frequency. 4.When FRRS-down is not fully deployed, for sudden frequency deviation that may cause frequency to exceed Hz, Resources providing FRRS-down shall immediately and appropriately respond to frequency. 5.Failure to meet the requirement (2) will lead to reduction in capacity payment. ERCOT Public

9 Purpose of the FRRS pilot program 1.Gather and analyze data to assist in determining the potential improvements in ERCOTs ability to arrest frequency decay during unit trips due to the presence of FRRS 2.Gather and analyze data to assist in determining the potential reductions of current regulation that would be appropriate due to the presence of FRRS 3.Assess the operational benefit and challenges of procuring and deploying FRRS 4.Gather and analyze data to assist ERCOT in developing settlement methodologies for FRRS and current regulation that use a pay for performance approach similar to what is specified in FERC Order 755; ERCOT Public

10 FRRS-Up and FRRS-Down Deployment Logic Deadband for FRRS trigger (±0.03 Hz) Deployment period Deployment period when frequency degrades further Recalling Maximum continuous deployment duration Apply similar logic for Down-Regulation for high frequency ERCOT may make additional parameter changes during pilot as needed FRRS deployment signal logic will be shared with the pilot Resources ERCOT Public

11 ERCOT Public

12 Frequency Decay Slope ERCOT Public

13 Potential benefits of FRRS 1.Promptly arrest frequency decay during unit trips 2.Diminishing use of traditional regulation 3.Reduction in Regulation capacity procurement 4.Better frequency control at a lower overall cost ERCOT Public

14 How is FRRS Procured during the Pilot? 1.FRRS-up and FRRS-down amounts are specified in advance for each hour. For the pilot, ERCOT will procure up to 65 MW per hour for FRRS-up and will procure up to 35 MW per hour for FRRS-down. No changes are made to the existing REGUP and REGDN requirements. 2.ERCOT has a list of “Qualified” FRRS Pilot Resources. Each Wednesday QSEs inform ERCOT of the amounts available for Saturday through Friday. 3.ERCOT prorates amounts to Pilot Resources as necessary. Final quantities sent to QSEs (for the upcoming week). 4.COPs for Pilot Resources shall reflect the final schedule as REGUP and REGDN. ERCOT Public

15 How is FRRS is Priced and Paid for during the Pilot? 1.ERCOT Settlements performs settlement by creating appropriate SASM data cuts. Current REGUP and REGDN bill determinants are used. A SASM is NOT executed by the operators. 2.DAM clearing prices shall be used to price the FRRS awards. 3.The cost for pilot MWs procured are paid for similar to other AS. 4.Adjustments can be made depending on actual availability and performance. ERCOT Public

16 Pilot Schedule 1.Power point presentations at WMS, ROS and ETWG in June and July. 2.Suggestions and comments due to ERCOT ERCOT plans to present updates at July WMS and ROS meetings (7/11 and 7/12). 4.Draft Governing Document to be posted by (7 days before TAC) 5.ERCOT plans to present at 8/2/12 TAC meeting. 6.Request approval for Pilot at the 9/18/12 BOD meeting. 7.Qualify Pilot Resources 9/18/12 through 4/30/13 (end of pilot). [6 month Pilot] 8.Begin procurements with Operating Day Continue for 6 months unless stopped early by ERCOT. Extensions of pilot may be considered during first 6 months. ERCOT Public

17 Other Info 1.Regular updates to be provided to TAC during Pilot Project. 2.It is expected that ERCOT will need to engage a contractor equivalent to.5 to 1 FTE for the duration of the Pilot Project. 3. The average cost for REGUP over the last 6 months has been about $9/MW and for REGDN has been about $6/MW. The estimated cost for 6 months of FRRS procurement from pilot resources is estimated to be about $3.4 Million. ERCOT Public

18 Questions? Please send suggestions and comments to WMS or ROS exploder or before COB ERCOT Public