1 ERTMS Applications in India UIC ERTMS Conference 2006 Towards a Masterplan for Deployment Budapest 4 th to 6 th April 2006 Presenters: Howard Revell.

Slides:



Advertisements
Similar presentations
“CONTROL SYSTEM” CONTROL MOVEMENT OF TRAIN AND SIGNALLING
Advertisements

TCAS – Indian Railway Train Control System
Thales Axle Counter The Challenges for a modern Train Detection System
UIC The Worldwide Association Representing the Railway Sector Nathalie Amirault Head of Unit Expertise Development, UIC RAILWAY OPERATION IN ECVET A LLP-DoI.
ERTMS Bridging the gap between technology and adoption: a Human Factors case study Elaine Thompson, Mott MacDonald.
Stakeholder meeting on the SHIFT²RAIL Strategic Master Plan Manuel Pereira, IST Lisbon ERRAC Vice Chairman 20 th June 2014, Brussels 1.
© Invensys 00/00/00Invensys proprietary & confidentialSlide 1.
Russia – EU seminar on rail transport research, October
Implementing ERTMS in the UK: Human Factors Implications for Train Drivers Derek Porter Human Factors Skill Leader AEA Technology Rail.
Express Rail Link The First Operational TETRA System for Rail in the World Dr. Aminuddin Adnan CEO Express Rail Link Sdn Bhd 18 May st Malaysian.
SATLOC – state of the art George Barbu – Union Internationale des Chemins de Fer Satellite based operation and management of local low traffic lines.
Russian Railway Transport Research Institute (VNIIZhT) Energy strategy for rail transport: an efficient tool for managing energy savings Alexander KOSAREV.
TPWS Deployment – Indian Railways
How innovation can contribute to achieve interoperable, high performance, cost effective Advance Traffic Management and Control Systems Philippe Citroën,
New Satellite-based Solutions for Train Control Systems
CHAPTERS 1 and 2 o Advantages of Railroad Concept o Problems Early On o Economics Common Goal o Development of the Country o Common Goal CE 433.
Overview System modelling and holistic simulation :
HIGH SPEED RAIL TRANSPORT G. P. Kosta CBE/S. W. Rly./Hubli.
1 Developing the MBSE Approach Tony Ramanathan Principal Engineer Network Rail.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
GUIDING LIGHTS TECHNOLOGY INTRODUCTION TO THEIR GLOBAL LOCOMOTIVE DRIVER TRAINING SIMULATOR PROGRAMM PROVIDING THE WORLDS MOST ADVANCED RAIL SIMULATION.
Traffic Management System And Passenger Information System Western Railway Experience.
ARRC Collision Avoidance System
ERTMS state of the art and evolution of the applications considering customer’s orientations.
ETCS Level 2 Operational Concept in Austria
N KASHINATH CSTE/P/S.RLY. TPWS PROJECT Provided on Chennai Central/Chennai Beach - Gummudipundi section of Chennai division Section length- 50 RKMs Date.
Positive Train Control Labor Briefing Washington, DC December 10, 2008.
Bruxelles Ansaldo STS – Company Profile nShield ARTEMIS Call
11 Satellite-based solutions for Train Control Systems European Parliament, Brussels Tuesday, 11 February 2014 Francesco Rispoli, Manager Satellite Technology.
Future Road Map – Modern Control, Command Signalling Systems BY Anshul Gupta DRM, Adra, South Eastern Railway Secretary, Institution of Railway Signal.
USDOT, RITA RITA: Oversight of USDOT’s R&D programs  University Transportation Centers $100M  UTC Consortia $80M  UTC Multimodal R&D $40M  Intelligent.
Alstom Transport presentation Mokra Gora April 2013 Djurica Misin.
Peter Gurník, Oldřich Trégl Satellite based train location.
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
CE 533 Introduction to Rail Transportation (4) Chapters 1 & 2 “Armstrong” Text.
1 PTC 101 A primer for PTC PTC 101 A primer for PTC.
Signalling: Convergence of needs
Right on Track towards a safe and interoperable Europe? 2 April 2014 Luc Lallemand Vice President EIM CEO Infrabel Belgium Rail Infrastructure Manager.
Company for Urban Innovative Transport (CUIT) 19/12/2007 Request for proposal.
SAFENET The OSU SAFENET Project The Ohio State University Center for Automotive Research & Center for Intelligent Transportation Research.
UIC ERTMS World Conference ERTMS Baselines Pio GUIDO, Head of ERTMS Unit Istanbul, 2 April 2014.
Railway Demonstration. 2 Low-Density Traffic Lines * n Single track, few trains/day –High safety requirements –High installation and maintenance costs.
1 ENERGY SECURITY CHALLENGES AHEAD A Railway’s Perspective By R.S Grover, Advisor Electrical Rail Vikas Nigam Ltd.,New Delhi.
1 PTC Update ACACSO May 2011 PTC Update ACACSO May 2011.
Davinder Pal Singh Bawa B.Tech [ECE] 6 th sem CTIT,Shahpur.
The overarching goal of Swedish transport policy is to ensure a socio-economically efficient transport provision, sustainable over the long.
INTERFACING ETCS WITH LEGACY CC-SYSTEMS TRACK - SIDE.
Transportation Systems IREE Conference, Delhi, India 26 July 2014 “ Using Communication-Based Train Control to Improve the Efficiency of Metro Railway.
UIC ERTMS Conference - Budapest 4 th -6 th April 2006 STRATEGY AND EXPERIENCES OF THE ERTMS DEPLOYMENT IN SPAIN Antonio Domínguez Chala ADIF.
1 Overview on Railway Applications of GSM-R Robert SARFATI SYSTRA GSM-R Operators Group Chairman UIC ERTMS conference 2006.
CERTIFER 1 J.P PRONOSTP.OZELLO UCI ERTMS CONFERENCE BUDAPEST.
To Create a Better Life through Green Network ERTMS Application in Korean Railroad
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
INDIAN RAILWAYS  I. Rly. Vision for Next 10 Years  Opportunities for International Partners A Presentation by – Mr. Arbind Kumar Director (Projects)
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Data Enabled Railway July 2015 Railway Suppliers Summer Conference 2015 Steve Warner, EMEAR Head of Data & Analytics.
Programme Update since April 2015 Martin Arter | Digital Railway Development Director Suppliers’ Summer Conference 15/07/2015.
ETCS Level 1 Deployment in Luxembourg UIC ERTMS CONFERENCE 2006 BUDAPEST François JAEGER Director CFL Member of the CFL board of.
ERTMS/ETCS BENEFITS FOR RAILWAYS WORLD WIDE Norwin Vögeli
Title: Road vs. Rail… A shift towards rail Date: 16 Nov 2015.
// Eating the Elephant ETCS Requirements for GB railway.
Paul Plummer, Chief Executive, RDG and ATOC. UK rail is a success story but there are challenges. “Safest & fastest growing railway in Europe”
Public Conference December
ERTMS Application on Tests and Maintenance
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
National Implementation Plans (NIP)-European Deployment Plan (EDP)
ATO over ETCS Benoît BIENFAIT 10/2/2016.
CE 533 Introduction to Rail Transportation (4)
Current Transportation Advancements in Transdev
INDIA ENERGY CONGRESS - EFFICIENT ENERGY ON 31ST JAN., 2007
Presentation transcript:

1 ERTMS Applications in India UIC ERTMS Conference 2006 Towards a Masterplan for Deployment Budapest 4 th to 6 th April 2006 Presenters: Howard Revell US&S Pty Ltd Gopalakrishnan US&S Pvt

2 Contents India’s Rail NetworkIndia’s Rail Network Challenges FacedChallenges Faced Why Specify ERTMS/ETCS?Why Specify ERTMS/ETCS? TPWS What does it mean?TPWS What does it mean? Introduction to TPWS (ETCS)Introduction to TPWS (ETCS) IR’s RequirementsIR’s Requirements System ArchitectureSystem Architecture System DevelopmentSystem Development The Two Pilot ProjectsThe Two Pilot Projects The FutureThe Future

3 India’s Rail Network Second largest railway in the world under a single managementSecond largest railway in the world under a single management OwnsOwns –63,100 km of track –6,900 stations –7,800 locomotives –4,700 EMU/DMU cars EmploysEmploys –1.5 million permanent employees –Almost as many part-time employees OperatesOperates –14,400 trains daily (8,900 are passenger) CarriesCarries –14 million passengers daily –1.5 million tonnes of freight daily

4 Safety Challenges Faced IR’s Corporate Safety Plan goals are to:IR’s Corporate Safety Plan goals are to: –“Make railways more reliable and a safer mode for transportation of men and material” –“Stimulate the implementation of modern, proactive and systematic safety measures” –“Bring about both qualitative and quantitative improvements in safety performance” –“Encourage safety research and development” –“Reduce consequential train accidents”

5 Modernisation Challenges Faced IR’s Integrated Railway Modernisation Plan goals are to:IR’s Integrated Railway Modernisation Plan goals are to: –“Ensure the railways not only sustain the current level of performance but are also able to cater to the growing demands of passenger and freight traffic” –“Provide modern and efficient services to millions of its customers” –“Become a World Class railway system in the foreseeable future”

6 Why Specifiy ERTMS/ETCS? Assists Indian Railways to meet their safety and modernisation goals byAssists Indian Railways to meet their safety and modernisation goals by –Providing a widely accepted standard –Accommodating multiple vendors –Providing a robust platform for technology transfer and local manufacture –Permitting customisation to meet Indian Railway’s needs –Eliminating human error leading to : Signals passed at dangerSignals passed at danger OverspeedingOverspeeding –Accommodating interoperability

7 TPWS TPWS = Train Protection and Warning SystemTPWS = Train Protection and Warning System Colloquialism used by Indian RailwaysColloquialism used by Indian Railways It applies to the ETCS Level 1 concepts and the UIC/UNISIG specificationsIt applies to the ETCS Level 1 concepts and the UIC/UNISIG specifications It does not, in Indian terms, apply to the UK implementation that is based on different technologyIt does not, in Indian terms, apply to the UK implementation that is based on different technology

8 Introduction of TPWS In early 2004 Indian Railways called tenders for two Train Protection and Warning System pilot projectsIn early 2004 Indian Railways called tenders for two Train Protection and Warning System pilot projects These projects were specified to conform to ETCS Level 1 and be upwardly scalable to meet the full supervision mode of ETCS Level 2These projects were specified to conform to ETCS Level 1 and be upwardly scalable to meet the full supervision mode of ETCS Level 2 Late in 2004 Ansaldo Signal was awarded both projectsLate in 2004 Ansaldo Signal was awarded both projects Ansaldo Signal subsidiary, Union Switch & Signal India will deliver both projectsAnsaldo Signal subsidiary, Union Switch & Signal India will deliver both projects The two projects include manufacture, supply, design, test and commission of the on-board and trackside equipmentThe two projects include manufacture, supply, design, test and commission of the on-board and trackside equipment

9 General Requirements Trackside EquipmentTrackside Equipment –Balises –LEUs On-board EquipmentOn-board Equipment –On board processor –Drivers control and indication panel –Balise antenna and BTM –Impulse generator – tacho –Brake interface –Service and emergency brake valves –Isolation unit

10 Functional Requirements Balise identification and data acquisitionBalise identification and data acquisition Calculation ofCalculation of –Speed profile –Permitted speed –Release speed Speed monitoringSpeed monitoring Unplanned passing of signal at stop - train tripUnplanned passing of signal at stop - train trip Planned passing of signal at stop – bypass controlPlanned passing of signal at stop – bypass control Audio Visual WarningsAudio Visual Warnings System health indicationSystem health indication Data loggingData logging System isolationSystem isolation

11 System Architecture DMI EVC SPEEDSENSORS EB, SB LEU EUROBALISE ANTENNA BTM

12 On-Board System Modification

13 Location of DMI Proposed Location of DMI for IR WAP-5 Locomotive

14 Trackside System Modification 1023 bit telegram being modified for applications in India1023 bit telegram being modified for applications in India Standard 3-section static speed and gradient profiles cannot currently be supported by Indian RailwaysStandard 3-section static speed and gradient profiles cannot currently be supported by Indian Railways Alternative packet numbers to be allocated for balises from the 305 reserve bits to support 2-section profilesAlternative packet numbers to be allocated for balises from the 305 reserve bits to support 2-section profiles

15 The Two Pilot Projects Two routes have been selected for evaluating the TPWS trialTwo routes have been selected for evaluating the TPWS trial In the north New Delhi to AgraIn the north New Delhi to Agra –one of the busiest trunk routes in India In the south Chennai Beach to GummidipundiIn the south Chennai Beach to Gummidipundi –one of the busiest suburban routes in India

16 Pilot Project - Delhi Project Summary Project Summary

17 Pilot Project - Delhi Project Summary cont. Project Summary cont.

18 Pilot Project - Delhi Project Summary cont. Project Summary cont.

19 Pilot Project - Chennai Project Summary Project Summary

20 Pilot Project - Chennai Project Summary cont.

21 Pilot Project - Chennai Project Summary cont.

22 Long Term System Benefits

23 The Future On completion of prototype testing on the Delhi and Chennai projects the remainder of the sections and trains will be fitted with the TPWS system during 2006On completion of prototype testing on the Delhi and Chennai projects the remainder of the sections and trains will be fitted with the TPWS system during 2006 On experiencing the benefits delivered by the pilot projects, implementation of TPWS over high density routes is expectedOn experiencing the benefits delivered by the pilot projects, implementation of TPWS over high density routes is expected

24 Thank You