MANAGING PROJECT SCHEDULING
Advertisements

Work Breakdown Structures
Advanced Project Management - CPH
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
PMP/CAPM Prep Workshop Time
Module 02 : Knowing What the Project Is, Part 1. 2.
Management & Development of Complex Projects Course Code - 706
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Project Scope Management
Degree and Graduation Seminar Scope Management
Copyright 2008 Introduction to Project Management, Second Edition 1  Project time management involves the processes required to ensure timely completion.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Project Time Management
Importance of Project Schedules
Project Time Management
Project Management Session 7
Chapter 5: Project Scope Management
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management.
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
HIT241 - TIME MANAGEMENT Introduction
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
P ROJECT M ANAGEMENT, PMI A PPROACH (PMP) P ROJECT T IME AND S CHEDULE M ANAGEMENT Sayed Ahmed BSc. Eng. in CSc. & Eng. (BUET, Bangladesh) MSc. in CSc.
Project Management (x470)
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Week 6 Project Time Processes – Part 2 C ertificate IV in Project Management.
TIME MANAGEMENT Definition: Time management is a set of principles, practices, skills, tools, and systems that work together to help you get more value.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Lecture 5 Title: Project Time Management By: Mr Hashem Alaidaros MIS 434.
Conducted By: Dr. Madhu Fernando, PMP, DBA, MEng. MGT PROJECT MANAGEMENT LESSON 5 AND 6: PROJECT PLANNING – TIME AND COST PLANNING AND MANAGEMENT.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Quick Recap. Work Breakdown Structure (WBS): Set of activities to do (“use cases”) Formats of WBS Risk associated WBS Approaches for WBS Dependency Graph:
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
BSBPMG403A Apply Cost Management Techniques Apply Project Cost Management Techniques Project Cost Processes C ertificate IV in Project Management
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Chapter 6: Project Time Management Information Technology Project Management,
PMP, CAPM, PgMP, PMI-SP, PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 2 C ertificate IV in Project Management
Advanced Project Management Project Time Management Ghazala Amin.
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 1 C ertificate IV in Project Management
BSBPMG504A Manage Project Costs 7.2 Determine Budget Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of aggregating.
BSBPMG504A Manage Project Costs Manage Project Costs Project Cost Processes Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG504A.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Project Time Management
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
Information Technology Project Management, Seventh Edition.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Project TIME Management
Time Management.
Project Management MGT 30725
Manage Project Time Project Time Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Plan Schedule Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
CIS12-3 IT Project Management
Project Time Management
Project Time Management
Project Time Management
Importance of Project Schedules
Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

SOFTWARE PROJECT MANAGEMENT Project Time Management Dr. Ahmet TÜMAY, PMP

Project Time Management Project Time Management includes the processes required to manage timely completion of the project. The planning effort for time management is part of the Develop Project Management Plan process (Section 4.3), which produces a schedule management plan that sets the format and establishes criteria for developing and controlling the project schedule.

Plan Schedule Management Establishes policies and procedures for planning, developing, managing, executing and controlling the Project schedule

Define Activities The Activity Definition process will identify the deliverables at the lowest level in the work breakdown structure (WBS), which is called the work package. Project work packages are planned (decomposed) into smaller components called schedule activities to provide a basis for estimating, scheduling, executing, and monitoring and controlling the project work.

Define Activities Process of identifying and documenting the specific actions to be performed to produce the Project deliverables

Activity Definition Tools Decomposition; Subdividing the work packages into smaller, more manageable components, activities. This activity definition is often performed by the project team members responsible for the work package. Rolling Wave Planning; Rolling wave planning is a form of progressive elaboration planning where the work to be accomplished in the near term is planned in detail at a low level of the WBS, while work far in the future is planned for WBS components that are at a relatively high level of the WBS.

Activity Definition Outputs Activity List; The activity list includes the activity identifier and a scope of work description for each schedule activity in sufficient detail to ensure that project team members understand what work is required to be completed. Activity Attributes; These attributes are used for project schedule development and for selecting, ordering, and sorting the planned schedule activities in various ways within reports. Milestone List; Significant point or event in the project. May be mandatory or optional.

Sequence Activities Activity sequencing involves identifying and documenting the logical relationships among project activities. Schedule activities can be logically sequenced with proper precedence relationships, as well as leads and lags to support later development of a realistic and achievable project schedule.

Activity Sequencing Techniques .1 Precedence Diagramming Method (AON) 4 Type Dependencies FS,FF,SS,SF .2 Dependency Determination Mandatory Dependencies; hard logic, inherent in the nature of the work being done (a built prototype before test) or contractually required. Discretionary Dependencies; preferred logic, or soft logic, usually established based on knowledge of best practices within a particular application area where a specific sequence is desired, even though there are other acceptable sequences. External Dependencies; those that involve a relationship between project activities and non-project activities. .3 Leads and Lags

Estimate Activity Resources Estimating schedule activity resources involves determining what resources (persons, equipment, or materiel) and what quantities of each resource will be used, and when each resource will be available to perform project activities.

Resource Estimating Techniques Alternatives Analysis Bottom-up Estimating The resource needs of each lower, more detailed piece of work are estimated, and these estimates are then aggregated into a total quantity for each of the schedule activity’s resources. Published Estimating Data

Estimate Activity Durations The process of approximating the number of work periods needed to complete individual activities with estimated resources

Estimate Activity Duration Inputs Activity Resource Requirements, Resource Calendars, Project Scope Statement, constraints and assumptions Available skilled resources, Contract terms and requirements, Existing conditions, Availability of information, Length of the reporting periods. Project Risks

Duration Estimating Techniques Analogous Estimating; Analogous estimating uses parameters such as duration, budget, size, weight, and complexity, from a previous, similar project, as the basis for estimating the same parameter or measure for a future project. Frequently used for the early phases of project. Less costly, fast but less accurate. Parametric Estimating; Uses statistical relationships between historical data and other variables to calculate an estimate for activity parameters, like cost, duration Three Point Estimates (PERT); Reserve Analysis; Project teams can choose to incorporate additional time referred to as contingency reserves, time reserves or buffers, into the overall project schedule as recognition of schedule risk.

Develop Schedule An iterative process of analysing activity sequences, durations, resource requirements and schedule contraints to create the Project schedule model. Model defines activities start and finish dates.

Schedule Development Techniques Schedule Network Analysis Critical Path Method Schedule Compression Crashing Fast Tracking What-If-Scenario Analysis Resource Leveling

Control Schedule Schedule control is the process of monitoring the status of the project and manage changes to the schedule baseline and concerned with: Determining the current status of the project schedule, Influencing the factors that create schedule changes, Determining that the project schedule has changed, Managing the actual changes as they occur.

Control Schedule Techniques Performance Reviews; measure compare and analyse schedule performance – EV (Earned Value Analysis, Kazanılmış Değer Analizi) Variance Analysis Project Management Software