Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.

Slides:



Advertisements
Similar presentations
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Advertisements

Building and Grounds Committee Mike Clarey, chairman Ken Plueger Tom Reuter Tim Pick Bill Anthony Fr. Matt Hewitt.
Dehradun DEHRADOON PHASE – I *All inclusive cost *Including Car parking *Club Membership Extra Registration amount i.e. Rs 100,000/- +10% of cost price.
MARKETED BY. STRUCTURE: RCC framed structure, with brick work in cement motar INTERNAL/EXTERNAL PLASTER: Mixture of fine river sand.
WELCOME. Eco Pine Homes-I (Dharampur Project)
EventFlat Earnest Money Deposit10 Completion of Plinth10 Completion of slab 13 Completion of slab 23 Completion of slab 33 Completion.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
Building for Learning Project Photo Progress Report Month of June 2010 Project commencement 21 st September 2009.
THE SUMMER OF CHANGE Things are happening ….. WEEK ONE.
SHEPHERD ELEMENTARY SCHOOL PHASE I SHEPHERD ELEMENTARY SCHOOL PHASE I SITE PLAN.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
© 2011 wheresjenny.com Renovating your House. © 2011 wheresjenny.com Renovating your House Vocabulary. Have an extension: Build on to the existing house.
Operation Build Progress What once was a dream, is now becoming reality. With the Grace of God, work on the Renovations and Educational wing of Second.
Organics Waste Processing Facility Construction Progress Update January 17, 2011.
LOGO General Trias Cavite. Along cross roads of Daang Hari and Arnaldo Hi-way.
Technical boclair academy Building Drawings.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Building for Learning Project Photo Progress Report 6 February 2010– March 2010 Project commencement 21 st September 2009.
MARIAN BROTHERS- YUMBE(UGANDA) Construction of toilets, kitchen and renovation of library for Immaculate Heart Secondary School Yumbe- Uganda.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
On-the-Workforce Training Status  Plan for Jobs to be created: 300  Jobs Created to Date: 233  Tentative Selection for Hire to date: 201  Re-Advertised.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Project: Location Map Laa Capitol is the new residential project offering from Laa Builders & Developers. Located in the fast developing residential.
First installation of SOLARSPOT D900 CTT MAYA – PORTUGAL mq for the main distribution of the Portuguese mail service 206 system installed, in a.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Final Assignment part 1: revise stairs Some minor markups.
Building for Learning Project Photo Progress Report Month of May 2010 Project commencement 21 st September 2009.
Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high”
Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.
Work Progress Photos From 1 ST To 15 TH NOV 2015.
HUGS 4 Africa Nov, 2014 Bedroom built in 4 days Gatuto Kenya.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Work Progress Photos From 15 TH To 30 TH NOV 2015.
Objectives STOP HUMIDITY DAMAGING THE CASTLE. BRING CONFORT FOR INHABITANT COST SAVING ON HEATING SYSTEM.
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Falling while dismantling scaffold and footing (Serious Accidents in Construction) Construction The copyright to this material belongs to the Korea.
Stone Avenue Train Station Renovation Project Board Workshop June 7, 2010.
How can I find the area and perimeter of a rectangle? MCC.4.MD.3.
by: Maryam Musab Amine We use bricks and tiles to build a house. We use bricks to build the walls. We use tiles to build the floors. The bricks and tiles.
Transforming the School Keeper’s House at Hague into learning and community space at Hague.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
St Martin’s Projects “Welcomes you to know Christ and to make Him known” Renovation, Refurbishment & Maintenance Rectory Bathroom and study.
A HOUSE.
Renovating a House.
Major Steps In Building a SFR
EDENSVILLE ESTATE SIMAWA.
Assembly And Installation Of Ikea Kitchen Cabinets
AWAKE e-spectro update
Building Structural Systems
Ramar-Hall Addition: 2017.
Field House, Car Colston
WESLEYAN P-4-8 MAJOR MAINTENANCE FY WASHINGTON STREET
Building Drawings.
Location Plans & Site Plans
Value of contract: Length of contract: Contract start date:
KOMPLEX Investors Report – Q
14 Crow Hill Rise, Mansfield
Interior/Exterior Renovation SECTION EXISTING CONDITION PHOTOS
Value of contract: Length of contract: Contract start date:
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
Organics Waste Processing Facility Construction Progress Update July 8, 2011
Field House, Car Colston
Thing / Person:____________________ Dates:_________________
1. What animal 2. Male or Female ? 4. Male or Female? Why? Why?
Presentation transcript:

Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02 Date :

VIEW Descriptions -Paint to wall was completed

VIEW 2 Descriptions -Paint to wall was completed

VIEW 3 Descriptions -Paint to wall was completed

VIEW 4 Descriptions -Paint to wall was completed

VIEW 5 Descriptions -Site condition

VIEW 6 Descriptions -All the existing finish will be demolish

Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Ground Floor VIEW 1 VIEW 2 VIEW 5 VIEW 3 VIEW 6 VIEW 4 VIEW 7 VIEW 8 PROGRESS PHOTO REPORT - 02 Date :

VIEW 1 Descriptions -Paint to wall was completed

VIEW 2 Descriptions -Paint to wall was completed

VIEW 3 Descriptions -Paint to wall was completed

VIEW 4 Descriptions -Plastering works in progress

VIEW 5 Descriptions -All the existing finish will be demolish

VIEW 6 Descriptions -Paint to wall was completed

VIEW 7 Descriptions -Site condition

VIEW 8 Descriptions -All the existing finish will be demolish

Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C First Floor B Ground Floor A Ground Floor VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 9 VIEW 10 VIEW 13 VIEW 14 VIEW 12 VIEW 11 VIEW 5 VIEW 6 VIEW 7 VIEW 8 VIEW 4 VIEW 2 VIEW 1 VIEW 3 VIEW 5 VIEW 6 VIEW 7 VIEW 8 VIEW 9 VIEW 10 VIEW 1 VIEW 2 VIEW 5 VIEW 6 VIEW 3 VIEW 4 VIEW 7 VIEW 8 PROGRESS PHOTO REPORT - 02 Date :

VIEW 1 Descriptions -Paint to wall was completed -Brick wall work was finished A Ground Floor

VIEW 2 Descriptions -Paint to wall was completed -Brick wall work was finished A Ground Floor

VIEW 3 Descriptions -Plastering works in progress A Ground Floor

VIEW 4 Descriptions -Paint to wall was completed A Ground Floor

VIEW 5 Descriptions -Plastering works in progress A Ground Floor

VIEW 6 Descriptions -Site condition A Ground Floor

VIEW 7 Descriptions -Plastering works in progress -Sand arrived on site A Ground Floor

VIEW 8 Descriptions -Plastering works in progress A Ground Floor

VIEW 9 Descriptions -Plastering works in progress A Ground Floor

VIEW 10 Descriptions -Site condition A Ground Floor

VIEW 1 Descriptions -Plastering works in progress B Ground Floor

VIEW 2 Descriptions -Site condition B Ground Floor

VIEW 3 Descriptions -Plastering works in progress B Ground Floor

VIEW 4 Descriptions -Paint to wall was completed B Ground Floor

VIEW 5 Descriptions -Plastering works in progress B Ground Floor

VIEW 6 Descriptions -Paint to wall was completed B Ground Floor

VIEW 7 Descriptions -Plastering works in progress B Ground Floor

VIEW 8 Descriptions -Site condition B Ground Floor

VIEW 9 Descriptions -Paint to wall was completed -Brick wall work was finished B Ground Floor

VIEW 10 Descriptions -Paint to wall was completed -Brick wall work was finished B Ground Floor

VIEW 11 Descriptions -All the existing finish will be demolish -Site material arrived on site B Ground Floor

VIEW 12 Descriptions -All the existing finish will be demolish -Site material arrived on site B Ground Floor

VIEW 13 Descriptions -Paint to wall was completed B Ground Floor

VIEW 14 Descriptions -All the existing finish will be demolish B Ground Floor

VIEW 1 Descriptions -Plastering works in progress C Ground Floor

VIEW 2 Descriptions -Plastering works in progress C Ground Floor

VIEW 3 Descriptions -Plastering works in progress -The door frame has installed C Ground Floor

VIEW 4 Descriptions -Plastering works in progress C Ground Floor

VIEW 5 Descriptions -Paint to wall was completed C Ground Floor

VIEW 6 Descriptions -Plastering works in progress C Ground Floor

VIEW 7 Descriptions -Paint to wall was completed C Ground Floor

VIEW 8 Descriptions -Paint to wall was completed C Ground Floor

Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road B First Floor E First Floor E First Floor VIEW 2 VIEW 3 VIEW 1 VIEW 2 VIEW 1 VIEW 2 PROGRESS PHOTO REPORT - 02 Date :

VIEW 1 Descriptions -Plastering works in progress B First Floor

VIEW 2 Descriptions -Plastering works in progress B First Floor

VIEW 4 Descriptions -Plastering works in progress B First Floor

VIEW 1 Descriptions -Plastering works in progress E First Floor Female Toilet & Disable toilet

VIEW 2 Descriptions -Plastering works in progress E First Floor Female Toilet & Disable toilet

VIEW 1 Descriptions -Plastering works in progress E First Floor Male Toilet

VIEW 2 Descriptions -Plastering works in progress E First Floor Male Toilet