HV Connections for SP HV RETURN Dummy Pad Backplane Connection Do we need to connect the HV and HV return to the “left hand” hybrid? The HV trace serves.

Slides:



Advertisements
Similar presentations
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
Advertisements

UKDC2 Stavelet with Tandem Converters Peter W Phillips.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Electricity 4th grade Science.
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
1 Module and stave interconnect Rev. sept. 29/08.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Chain of Modules using 1cm wide Cu Tape between hybrids SP- SP+ M0 M1 M2 M3 Initial test used External shunt control (subsequently reverted) Photo shows.
How To Solder By: Stephen Eibling.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Mechatronics Servo System Trouble Shooting. Mechatronics General Problem Management Problem Can I handle it, now? Can I identify the bad device? Call.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
Modelling of TPM noise problems Greg, following discussions and measurements with David and Senerath.
Status of TRD Chamber and Readout Electronics Integration Ken Oyama and Christian Lippmann for the TRD Collaboration Sep. 26, 2005 TRD status meeting in.
John Matheson Rutherford Appleton Laboratory On behalf of the SP Community Thanks to Martin Gibson (RAL), Richard Holt (RAL), Dave Lynn (BNL), Peter Phillips.
Laura Gonella ATLAS-CMS Power Working Group, 08/02/2011
1 Module and stave interconnect Rev. sept. 29/08.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Mitch Newcomer Representing work at RAL, Liverpool, BNL and Penn.
Section 3 – Electric Current Models. Experiment 3.1 A) Set up a simple circuit with a single battery and bulb. We will call this the “indicator bulb.”
Stavelet Update Peter W Phillips 29/07/2011. Serial Powering with a Stavelet Module: Recent Results Whilst single SP modules in the “chain of hybrid”
3 rd Work Meeting of CBS-MPD STS, Karelia, 2009 Towards CBM STS Volker Kleipa, GSI Darmstadt.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
PCB Traces CK Cheng CSE Dept. UCSD 1. PCB Traces 2.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
And now for something completely different First results from the DC-DC Stavelet Peter & Ashley with Giulio & John.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
Strip Module Working Group Meeting 16 th May 2012 Hybrids A Greenall.
Grounding Studies Metal box sensor SVX4/hybrid Analog cable GND(20W)
Forward Calorimeter Baseplane and FC1 Layer Sum Board D. Tompkins 30 June 2015.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
We really need to check all the results showed. We change the GEM from the fully-well-shielded to the less shielded one (top- bottom-fan out with aluminum)
DCDC for 250nm Stave and ABC130 Hybrid - Revisited.
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
Circuits Series or Parallel.
ABC130 Hybrid/module and HCC Bond Detail ABC130 Left & Right Handed Hybrid and Module Topology Original proposal – same flavour hybrids Hybrid-module.
SP & DC-DC Considering the benefits of combining serial powering and DC-DC conversion technologies in powering ATLAS SCT upgrade modules & staves Richard.
BALANCING EQUATIONS NO2 - Balancing equations made easy.
Sergio Díez Cornell, Berkeley Lab (USA),
Single Board Controller Comments Roger Smith Caltech
ATLAS Strip Tracker Stavelets or A Tale of Two Stavelets “It was the best of times, it was the worst of times, it was the age of wisdom, it was the age.
US stavelet update 12th April PPB2s on serial power side 12 Apr SAMTEC connector (floating) Bond pad (connected to EoS through WB + bus tape.
Report on dummy detector Equipped with Heater & sensors NA62 GigaTracker Working Group Meeting May 24 th 2011.
30 September 2005, Frascati Anatoli Kachtchouk) 1 From CARDIAC version 2 to CARDIAC version 3 N.Bondar, A.Kachtchouk, P.Neustroev (PNPI)
SPP-COB meets a module Ashley and Peter 17 th June 2011.
SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool.
Tapes and Integration of Powering (endcap) Pepe Bernabeu (IFIC) Valencia/UK - Experience and future collaboration on staves/petals, June 17 th 2010.
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
Serial Power Distribution for the ATLAS SCT Upgrade John Matheson Rutherford Appleton Laboratory On behalf of the SP Community Thanks to Richard Holt (RAL),
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
Berkeley status Aug 10th, 2012.
Update of MVD services and requests
VFAT hybrid and beam board noise studies
Test Slab Status CALICE ECAL test slab: what is it all about?
Equipment for Assembly – UK Experiences
HCAL HV splice box.
FPC panel 8in x 12in 28/09/2017.
Presentation transcript:

HV Connections for SP HV RETURN Dummy Pad Backplane Connection Do we need to connect the HV and HV return to the “left hand” hybrid? The HV trace serves no obvious function, and the return trace is one of many parallel paths. What happens if these bonds are removed? First test – makes very little difference (over) – seems these bonds do nothing DCAC

Stavelet 5A , 150V bias, bias bonds to H4 removed 2 DEAD CHIP  SWAPPED DCDC ACAC ACAC DCDC ACAC DCDC ACAC DCDC LIN F 150V

“0V” Referencing Paths 1.The Strip Bias line on the detector 2.The HV bias return line on the bus tape (if connected) 3.The Shield Of these three paths, the shield has the lowest impedance (certainly resistance). It’s not really a shield, it’s the dominant return path! If we provide an alternate low impedance path, we may be able to connect the shield at one point only. Module performance may improve.  Try a wire between the PPB board connectors First test – very slight improvement? Inconclusive…

Stavelet 5A , 150V bias, bias bonds to H4 removed 4 DEAD CHIP  SWAPPED DCDC ACAC ACAC DCDC ACAC DCDC ACAC DCDC LIN F 150V

Thoughts and Open Questions Investigating possibility to add bondable strip between hybrids of each module to give a better referencing tie Addition of R in return side of HV filter Change AC/DC order of first module on the stavelet Do we need to revise the HV routing on future bus tapes? Do we need to provide a low resistance referencing tie independent of the shield?