Proxy $G and other Loads in SCED 2 Litmus Tests Loads in SCEDv2 Subgroup Dec. 2, 2014.

Slides:



Advertisements
Similar presentations
T&D Losses Reflecting Losses in DR within ERCOT August 22, 2012.
Advertisements

Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Results from the 2013 Survey of LSEs to Obtain Retail DR and Dynamic Pricing information Public Summary Frontier Associates LLC June
Loads in SCED v2 Subgroup
Retail DR and Price Response 2014 Product Headcounts Paul Wattles, ERCOT Market Design & Development DSWG Feb. 3, 2015.
Price Responsive Load / Retail DR Workshop Paul Wattles Karen Farley DSWG/REP Workshop April 9, 2014.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Discuss infrastructure to support bilateral contracting between CSPs and REPs in the Retail Market Loads in SCED Sub-group May 22,
Loads in SCED v2 Subgroup The LMP-G Journey 1. TAC Endorsement of LMP-G TAC voted to endorse “LMP-G” rather than “Full LMP” as the mechanism to enable.
Loads in SCED v2 Subgroup Update to DSWG 3/9/
Loads Acting as a Resource Relationships with QSEs and LSEs
Loads in SCED Version 2 Proxy G Proposal. This is a proposal from Carl Raish as an individual … it has not been vetted internally at ERCOT and should.
Price Responsive Load / Retail DR Data Collection Project and Lessons Learned Paul Wattles Karen Farley DSWG March 2014.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
LMP-G Policy Issues Discussion Demand Side Working Group July 9 th,
Price Responsive Load Next Steps – Data Collection Paul Wattles Karen Farley DSWG and RMS sub team October 16, 2012.
Retail Smart Grid Trends Paul Wattles Senior Analyst, Market Design & Development UT Energy Week: “How Smart Grids Enable Consumers” Feb. 18, 2015.
Price Responsive Load / Retail DR Workshop Paul Wattles Karen Farley DSWG/REP Workshop April 2014.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Price Responsive Load Survey Draft Results Paul Wattles Karen Farley DSWG and RMS Aug. 22, 2012.
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
ERCOT MARKET EDUCATION
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
0 The Basics –There are 4 POLR customer classes: Residential, Small Non-Res. (
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
ERCOT Demand Response Spring 2015 ERCOT Operator Seminar.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Weather Sensitive ERS Training Presenter: Carl Raish Weather Sensitive ERS Training Workshop April 5, 2013.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Load Participation in Real-Time Market: LMP Minus G.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
NPRR 571 ERS Weather Sensitive Loads Requirements Carl Raish, ERCOT QSE Managers Working Group November 5, 2013.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
LMP-G Policy Issues Matrix LRISv2 Subgroup July 23 rd,
Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013.
This slide deck contains animations. Please open this deck in slide show mode (“View” menu, then click on “Slide Show”). To move through the animations,
Price Responsive Load / Retail DR RMS Update Paul Wattles Carl Raish October 6, 2015.
Sept. 28, 2007 Interim Update Load Response Survey.
ERCOT MARKET EDUCATION Retail 101. Smart Meter Technology.
Price Responsive Load / Retail DR Workshop Paul Wattles Carl Raish Karen Farley REP Roundtable August 5, 2015 – Updates in RED.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
ERS Update – DSWG Presentation September 21, 2012.
LMP-G Policy Issues Matrix LRISv2 Subgroup July 23 rd,
Retail DR and Price Responsive Load Next Steps – Data Collection Paul Wattles Karen Farley Updates to DSWG & RMS January 2013.
An Overview of Demand Response in California July 2011.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Price Responsive Load / Retail DR DSWG Update Paul Wattles Carl Raish September 17, 2015.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Price Responsive Load / Retail Demand Response 2013 Analysis Report Overview ERCOT Staff & Frontier Associates RMS Meeting August 5, 2014.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
LMP-G Update to DSWG LRISv2 Subgroup Aug. 20,
Building Blocks for Premise Level Load Reduction Estimates ERCOT Loads in SCED v2 Subgroup July 21, 2014.
LRISv2 Subgroup Proxy $G Discussion 10/27/
Third Party DR Self-Deployment Loads in SCEDv2 Subgroup Sept. 18, 2015.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
Price Responsive Load / Retail DR RMS Update Paul Wattles Carl Raish September 1, 2015.
Thoughts on DER Aggregations ERCOT Staff DREAM TF Sept. 28, DER Aggregations.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
Draft NPRR Weather Sensitive ERS Loads December 2012.
Principal Load Profiling and Modeling
Alternative Approach for Loads in SCED v.2
Load Participation in Real-Time Market: Loads in SCED version 2
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Reflecting Losses in DR within ERCOT August 22, 2012
The New Texas Wholesale/Retail Market
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Presentation transcript:

Proxy $G and other Loads in SCED 2 Litmus Tests Loads in SCEDv2 Subgroup Dec. 2, 2014

2 Background Loads in SCED Subgroup is contemplating a v2 that would allow three settlement options, all consistent with the concept of LMP minus G: 1.Existing Bid-to-Buy – for LRs represented by their LSE 2.Volumetric G – for LRs represented by 3 rd party QSEs with DR measurable at ESI ID level 3.Proxy $G – for LRs represented by 3 rd party QSEs and… With hedged retail energy pricing With DR measurable at the LSE portfolio level Loads in SCEDv2Dec. 2, 2014

3 Loads in SCED Resource/ALR Request Can we accurately estimate customer- level curtailment? Yes No DR QSE LSE/ REP Offer to sell in SCED Bid to buy in SCED Does aggregation meet minimum customer count for baseline accuracy? Represented by LSE/REP or DR QSE? No ALR fails qualification (Bilateral only) Yes Offer to sell in SCED Settled as LMP-VG Settled as LRISv1 Settled as LMP-$G Is Resource a residential aggregation with customer rate composition compatible with LMP-$G? Yes No LMP-G Road Map (Hybrid approach) Dec. 2, 2014Loads in SCEDv2

4 Who’s eligible for Proxy $G? Under this settlement option, the LR’s LSE(s) would be reimbursed by the DR QSE for the demand response value at the Proxy $G rate –IE, the DR QSE will ‘sell back’ the (unused) energy to the market at LMP minus G This only works if the LR is buying its energy on a hedged price contract –If the LR is avoiding a real-time price, this would amount to ‘double payment’ Proxy $G eligibility should be a simple binary designation – ‘Hedged’ or ‘Unhedged’ – assigned by the LSE The question is, who’s hedged and who isn’t? Loads in SCEDv2Dec. 2, 2014

5 Retail product types (from the DR data project) RTP – Real Time Pricing – retail prices for all hours or intervals based on ERCOT Real-Time Settlement Point Prices for the premise Load Zone, calculated every 15 minutes, or other real-time wholesale price indicator(s). BI – Block & Index – fixed pricing for a defined volume of usage, coupled with pricing indexed to the wholesale market for usage exceeding the block. Block prices and volumes may vary by time of day/week. Option could include if usage dips below the block. CPP – Critical Peak Pricing –prices that rise during critical peaks: limited duration periods of time identified by the LSE that usually correlate to high prices in the real-time wholesale market. Critical peak events may occur a limited number of times per year and typically are communicated a day in advance. PR – Peak Rebates – rebates paid to customers for load reductions taken during periods of time identified by the LSE. Loads in SCEDv2Dec. 2, 2014

6 Retail product types (from the DR data project) 4CP – Four Coincident Peak – predictor signals or direct load control provided to customers in advance of potential Four Coincident Peak (4CP) intervals during summer months (June through September). Reducing load during such intervals lowers transmission charges. 4CP charges apply to large customers (peak demand ≥700 kW) in competitive choice areas, and also to NOIEs at the boundary meter level. TOU – Time of Use — prices that vary across defined blocks of hours, with predefined prices and schedules. (As used here, does not apply to seasonal adjustments). OLC – Other Direct Load Control – contracts that allow the LSE or a third party to control the customer’s load remotely for economic or grid reliability purposes. This category applies to Direct Load Control (DLC) with different deployment criteria than described elsewhere. (Avoid double counting if DLC data was reported in other categories.) OTH – Other Voluntary Demand Response Product – any retail product not covered in the other categories that includes a demand response incentive or signal. FO – Financial Option – product where LSE purchases an option from the customer that is backed by a specified level of DR and uses it for portfolio trades in the wholesale market. Loads in SCEDv2Dec. 2, 2014

7 Time of Use trends (from ‘14 data collection project) TOU as of 6/15/13:117,570 TOU as of 9/30/14*:290,400 * Preliminary and unofficial Most of the other categories also showing strong increases ERCOT still working with REPs to clarify some anomalies We need good discussion on which of these product types qualify as ‘unhedged’ Especially TOU -- almost entirely residential Loads in SCEDv2Dec. 2, 2014

8 Things to think about Absent a TX SET change, LSEs will need to submit lists of Unhedged ESI IDs to ERCOT on a regular (monthly?) basis ERCOT will need a mechanism to inform DR QSEs when a member of an ALR is designated as Unhedged –DR QSE must then remove it from the ALR Does the current list of product types cover all the bases? Should the litmus test requirement also extend to NOIEs that permit 3 rd party DR QSEs in their territories? –If so, how to coordinate unique meter IDs? Loads in SCEDv2Dec. 2, 2014

9 Other litmus tests… An Aggregate Load Resource (ALR) must meet a minimum size threshold in order for performance to be measured accurately –For Weather-Sensitive ERS, ERCOT set the minimum at 500 kW of DR capability –Is this the right threshold for ALRs in SCED? –Are there incentives for QSEs to create many small ALRs vs. a few large ALRs, and if so, are those incentives perverse? Members of an ALR may be served by multiple LSEs – should a minimum size be established for LSE portfolios within ALRs? –ERCOT Settlements will need to allocate DR values (x Proxy $G) back to each LSE –DR QSEs may not know REPs for all their clients, and customers switch – minimum thresholds could be unworkable –Is a threshold really necessary? Loads in SCEDv2Dec. 2, 2014

10 Loads in SCEDv2Dec. 2, 2014 ON OFF Questions?