SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, 2014 6/12/2014sPHENIX Mechanical Design.

Slides:



Advertisements
Similar presentations
4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Advertisements

Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
1 2/12/2009 PHENIX WEEKLY PLANNING 2/12/2009 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
6/27/ PHENIX WEEKLY PLANNING 6/27/2013 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/7/ PHENIX WEEKLY PLANNING Nov. 7, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
3/14/20131 PHENIX WEEKLY PLANNING 3/14/2013 Don Lynch.
4/5/20121 PHENIX WEEKLY PLANNING 4/5/2012 Don Lynch.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
6/12/2014 PHENIX WEEKLY PLANNING June 12, 2014 Don Lynch 1.
7/31/2014 PHENIX WEEKLY PLANNING July 31, 2014 Don Lynch 1.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
5/22/ PHENIX WEEKLY PLANNING May 22, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
3/22/20121 PHENIX WEEKLY PLANNING 3/22/2012 Don Lynch.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
6/5/ PHENIX WEEKLY PLANNING June 5, 2014 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Columbia University IN THE CITY OF NEW YORK FVTX Electronics Oversight and Integration Eric J. Mannel Columbia University.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
DON LYNCH DECEMBER 4, AGENDA December 4, BABAR Magnet Update Outer HCal Structural Analysis (Assembly and Support) sPHENIX Project Management.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Magnetic Fields in s/f/ePHENIX John Haggerty Brookhaven National Laboratory.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
December 18, Topics & Presenters: Magnet Overview J. Haggerty Magnet Testing in bldg 912 M. Anerella Modification to ChimneyP. Kovach Cryogenics.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
PHENIX WEEKLY PLANNING 2/16/06 Don Lynch. Prep for Run 6 Completed.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
Magnet, Support and Infrastructure
Presentation transcript:

SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design

6/12/2014sPHENIX Mechanical Design AGENDA: sPHENIX subsystem envelope (planned updates to rev J) Current Mechanical design and new illustrations sPHENIX Infrastructure update PHENIX Decommissioning Plan update sPHENIX Tasks & Schedule AOB

sPHENIX Mechanical Design sPHENIX “Innie”/”Bothie” Envelope 6/12/2014

sPHENIX Mechanical Design 6/12/2014 sPHENIX “Innie”/”Bothie” Envelope, closer

sPHENIX Mechanical Design 6/12/2014 sPHENIX EMCal Envelope

sPHENIX Mechanical Design New sPHENIX Illustrations Basic sPHENIX model closed 6/12/2014

sPHENIX Mechanical Design Basic sPHENIX model open 6/12/2014

sPHENIX Mechanical Design Basic sPHENIX model cutaway 6/12/2014

sPHENIX Mechanical Design Basic sPHENIX model beams eye view 6/12/2014

sPHENIX Mechanical Design Major active components with support structure omitted Outer HCAL Cryostat Inner HCAL EMCAL VTX 6/12/2014

sPHENIX Mechanical Design Initial concept for external support, racks and upper bridge platform 6/12/2014

sPHENIX Mechanical Design sPHENIX open, with racks 6/12/2014

sPHENIX Mechanical Design Infrastructure: NICK TULLY, SULI Student: Working with Paul Giannotti to gather existing PHENIX infrastructure documentation, update and revise as appropriate, modify and augment for sPHENIX PHENIX Decommissioning: MATT CHIULLI, SULI Student: Working with Dave Phillips to gather existing PHENIX installation documentation including work permits and Procedures (active and inactive), list and categorize tools and fixtures, begin creating updated documentation to plan PHENIX decommissioning. 6/12/2014

sPHENIX Mechanical Design PHENIX COOLING WATER SCHEMATIC

6/12/2014sPHENIX Mechanical Design

Magnet (BABAR) (Magnet Div) Acquire rightsDone Evaluate TransportDone Design Transport fixtures Done Fabricate Transport Fixtures 6/15/14 Evaluate BNL test facility requirements 8/1/14 Prepare test facility9/1/14 Install Transport fixtures9/1/14 Transport to BNL 9/15/14 Install in test facility10/1/14 Design tests/test equipment10/1/14 Fabricate/procure test equipment1/1/15 Run tests6/1/15 Design Magnet modifications12/1/14 Fabricate magnet modifications6/1/15 Install magnet modifications8/1/15 Evaluate final installation9/1/15 Design installation support equipment12/31/2015 Fabricate/procure support equipment7/1/2018 Transport to IR6/10/2019 Install8/30/2019 Test 10/25/2019 Commission11/22/2019 6/12/2014

sPHENIX Mechanical Design Mag Div. plans to finalize magnet transportation: -Magnet move -Thermal shield stabilizers are in the shops, -Completion expected by July quotes for shipping by truck of the solenoid and the valve box ~ $40k. -Other equipment to ship, conventional widths, air-ride is desirable -Send someone form Mag div to oversee/help with stabilizer install -Transport should take ~ 2 weeks, want it completed this fiscal year -1008B suggested for storage of power supply & dump resistor; floor plans to be consulted -Magnet testing -Reasonable location in 912 suggested, but CAD (Dave Phillips) to model magnet with floor plan and propose appropriately; -Probably need to be there for testing for at least one year. -Could be tested with the existing stack. Only very low power testing of the magnet in 912 is being considered. a spare RHIC quadrupole supply would be adequate for testing. -Roberto and Jerry will determine whether the proposed landing spot will be amenable to cryo. -Stack Modification -Envelope drawing (rev J, “Innie”) showed which shows the detector envelope. -Want to know the relative cost (money, difficulty, risk) of using the chimney as-is vs. modifying it to stay out of the acceptance. -Paul will begin looking into what would be needed; -Roberto and Jerry have thought about it and will work with Paul. -Next Biweekly Magnet planning meeting next Wednesda7, 6/18 6/12/2014

sPHENIX Mechanical Design sPHENIX Engineering: Major Subsystems/Subtopics: Magnet (BABAR) (Magnet Div) 2/1/ /31/2018 Hadronic Calorimeter (HCAL) (PHENIX) 2/1/ /31/2020 EM Calorimeter EMCal (PHENIX) 2/1/ /31/2020 VTX (RIKEN)2/1/ /31/202 DIRC (?)? - 12/31/2020 VTX additional layers (RIKEN)? - 12/31/2020 Carriage Support structure (PHENIX)2/1/ /31/2020 Readout Electronics (PHENIX)2/1/ /31/2020 Infrastructure (PHENIX ++) Electrical Power Services (PHENIX)? - 12/31/2017 Instrumentation Support ? - 12/31/2020 (Signal trays & Racks) (PHENIX) Cryo Services (CAD)2/1/14 – 8/1/2018 Cooling water (CAD)? - 12/31/2017 Safety Systems (PHENIX ) ? - 12/31/2020 Work Platforms and Access/Egress ? - 12/31/2017 Structures (CAD) HVAC (CAD)? - 12/31/2017 PHENIX Decommissioning ? - 6/30/2017 (CAD, PHENIX) System Integration (PHENIX)2/1/ /31/2020 Testing (PHENIX)2/1/ /31/2020 Installation (PHENIX, CAD)2/1/ /31/2020 Commissioning (PHENIX)2/1/ /31/202 6/12/2014

sPHENIX Mechanical Design Electrical Power Services Schedule: Paul Giannotti

6/12/2014sPHENIX Mechanical Design Babar Magnet Schedule: Mike Anarella

6/12/2014sPHENIX Mechanical Design VTX Additional Layers Schedule: Ed O’Brien

6/12/2014sPHENIX Mechanical Design Major SubProjects and Managers Hadronic Calorimeter - Don Lynch EM Calorimeter - TBD (CAD? VTX - Ed O’Brien DIRC - TBD VTX additional layers Carriage Support structure – Don Lynch Readout Electronics - Eric Mannel Infrastructure - Paul Giannotti Electrical Power Services - Paul Giannotti Instrumentation Support (Signal trays & Racks) Paul Giannotti Cryo Services - Roberto Than (CAD) Cooling water - Joe Scadudo (CAD) Safety Systems - Paul Giannotti Work Platforms and Access/Egress Structures - Dave Phillips (CAd) HVAC - TBD (Plant Engineering) PHENIX Decommissioning - Dave Phillips (CAD) System Integration - Don Lynch Testing - TBD Installation - Don Lynch Commissioning - TBD