advanced Coll. Meeting – Cascina, Sept 11th, 2007 G.Losurdo – INFN Firenze/Urbino 1 SUPERATTENUATOR - IP BASELINE: VIRGO DESIGN with STIFFER IP LEGS TILTMETER AND IP 6 DOF CONTROL ALTERNATIVE OPTION: VIRGO CONFIGURATION: if major problems arise in the realization of the tiltmeter or of the tilt actuation
advanced Coll. Meeting – Cascina, Sept 11th, 2007 G.Losurdo – INFN Firenze/Urbino 2 SUPERATTENUATOR - PAYLOAD BASELINE: MECHANICS: NEW MARIONETTE REFERENCE MASS (R&D RM/PI): it would simplify greatly the design, allowing F7 legs removal and installation of clean air flow. MIRROR ACTUATION: COIL-MAGNET PAIRS ALTERNATIVE OPTIONS: STANDARD F7-MARIONETTE ELECTROSTATIC ACTUATORS (R&D NA): noise specs to be demonstrated
advanced Coll. Meeting – Cascina, Sept 11th, 2007 G.Losurdo – INFN Firenze/Urbino 3 SUPERATTENUATOR - WARNINGS Having already an advanced vibration isolator should allow us to recover some time with respect to ADV LIGO, but… Some important upgrades of the SA are foreseen (IP, tiltmeters, MRM, RM, monolithic payload, probably electrostatic actuators) During CITF commissioning a large amount of time was needed for the SA pre-commissioning. This must not happen again in AdV It is important to test the solutions proposed well in advance
advanced Coll. Meeting – Cascina, Sept 11th, 2007 G.Losurdo – INFN Firenze/Urbino 4 SUSPENSIONS BASELINE: FUSED SILICA CYLINDRICAL FIBERS ALTERNATIVE OPTION: FUSED SILICA RIBBONS (R&D Glasgow)
advanced Coll. Meeting – Cascina, Sept 11th, 2007 G.Losurdo – INFN Firenze/Urbino 5 IMPORTANT DELIVERABLES SR SA Short SA upgrade IP design Tiltmeter MRM design New RM design Monolithic suspension Actuators