Presented by: Jane Bachynski March 1, 2016 Avoidance and Management of Construction Claims – Fact or Fiction?

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

A GIA is a contract between a surety company and a contractor (or subcontractor)/principal. A GIA is a standard, typical document in the construction.
Construction Contracting
Managing Construction Risks
Effectively Structuring and Managing Design- Build Projects Timothy John Murphy and Jason J. Annibale Wednesday November 25, 2009.
ABC Change Orders College of Environmental Design
Training & Development Contract Management. Contents Introduction to Contract Management Definition Contract Management Issues Activities Overview Contract.
1. Among the most important advisors to a construction firm are: –Professional surety bond producer –Knowledgeable construction/surety attorney –Construction-oriented.
Module 2: Legal Aspects of Associations & Non-Profits Presented by the Southern Early Childhood Association.
4/28/20151 PRESENTED BY NAKABAGO JOHN CONTRACT MANAGEMENT AND ADMINISTRATION IPPU PRESENTATION JOHN NAKABAGO.
Last Topic - National Security Measures taken to ensure national security include Pakistan National Security Council (PNSC) Elements of National Security.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
Litigation and Alternatives for Settling Civil Disputes CHAPTER FIVE.
EVALUATION OF DISPUTE RESOLUTION METHODS. Strengths of Mediation  Strengths 1) Mediation is often less expensive. Mediation avoids the costs of a trial,
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
ICC Amicable Dispute Resolution Services Mediating Corporate Governance Disputes By Mélanie Meilhac.
Q UINCY COLLEGE Paralegal Studies Program Paralegal Studies Program Interviewing & Investigation LAW-123 Preparing for an Initial Client Interview.
Presentation for Thesis of Master Degree Done by Ali Abdullah Al Salman CEM – 520 Term Project (Paper Presentation) Assessments of Risk Management Perception&
Contractor Safety Management
Learn. Perform. Succeed. Protest, Claims, Disputes and Appeals Chapter 7.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
RISK AND RISK MANAGEMENT. OVERVIEW DEFINITIONS RISK MANAGEMENT PROCESS ROLES AND RESPONSIBILITIES OF PROJECT PARTICIPANTS RISK MANAGEMENT TOOLS LIABILITY.
Evaluating And Negotiating An IT Contract — The Buyer’s View Allan P. Weeks Attorney-At-Law Law Office of Allan Page Weeks Insert your logo in this area.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Purpose of the Standards
INTRODUCTION TO PUBLIC PROCUREMENT
Workers Compensation Commission Sian Leathem Registrar 29 September 2008.
Internal Auditing and Outsourcing
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Module 4: Association Personnel – The Executive Director Presented by the Southern Early Childhood Association.
Best Practices for Graduate Supervision December 10, 2014 Your Role in Graduate Studies.
James Aiello PricewaterhouseCoopers Africa Utility Week 06 International Good Practice in Procurement.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Compensation events and claims Presented by Prof. Khem Dallakoti.
Third Party Alternative Dispute Resolution. Alternative Dispute Resolution (ADR)?  It involves the application of theories, procedures, and skills designed.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Practical Aspects of Litigation Management Elizabeth Ganiere Simon Keshishian © CLM Litigation Management Institute All rights reserved. The course.
Copyright 2008 The Prinz Law Office. Getting Started with Drafting a Services Agreement: A Brief Guide to the Elements and Key Considerations By Kristie.
CONSTRUCTION ADMINISTRATION Claims and Disputes Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.
Pre-Project Components
Agency Construction Management :CM NOT AT-RISK
Change Orders. CO Proposals Initiated by owner or GC –Owner requests estimate for work proposed –GC CO results from changed site condition or response.
Advanced Civil Litigation Class 12Slide 1 Settlements - In General A settlement is an agreement by both parties to resolve the dispute through compromise.
Construction Eng 221 Project Management and Administration.
Utah Labor Commission’s Workers’ Compensation Mediation Program Why is the workers’ compensation mediation program successful? What elements contribute.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
CLOSE PROJECT OR PHASE CLOSING PROCESS GROUP PROJECT INTEGRATION MANAGEMENT.
Understanding Business and Personal Law The Court System Chapter 4 The Court System What You’ll Learn How disputes can be settled without the courts.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
CCA Adjudication Cashflow, or fair dispute resolution, or both? Opportunities for Improvement in the Act and adjudication procedure Peter Degerholm AMINZ.
Charles University – Law Faculty October 2012 © Peter Kolker 2012 Class III
Preparation/Pre-Mediation Learn about the case and the parties
The Value of a Knowledgeable Construction/Surety Attorney
University of Calgary Continuing Education
Administration of a FIDIC Contract - Project Control
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Administration of a FIDIC Contract - Pre-Contract Phase -
EPA SUBCONTRACT TEMPLATE Overview September 2017
What Small and Emerging Contractors Need to Know Understanding General Agreements of Indemnity © Copyright 2017 NASBP.
Resolving Issues ADR, Due Process and CDE Complaints
For more information call the EEO Office at
Civil Pretrial Practice
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Presented by: Jane Bachynski March 1, 2016 Avoidance and Management of Construction Claims – Fact or Fiction?

Why does it matter? Success of a construction project in large measure is attributable to the efficacy of risk allocation in order to avoid: Additional costs Schedule delays Defaults Many disputes on a construction project can be avoided if the risks and responsibilities of the parties are clearly defined in unambiguous contracts which assign risk to the party best able to evaluate, control, manage and assume the risk

Avoidance and Management of Construction Claims - Overview Avoiding Construction Claims What causes claims to arise? What can you do at the design phase? What can you do at the tender phase? What can you do at the contract phase? Managing Construction Claims How can you avoid construction claims on site? How can you manage construction claims on site? If you can’t manage them on site, what are your options?

Avoiding Construction Claims

What causes claims to arise? Causes: Incomplete design or insufficient plans and specifications Inadequate risk assessment Unfair risk allocation Constrained owner’s budget Late start-ups – permit issues Differing site conditions Inexperienced contractor, owner or consultant Unrealistic schedule Changes (owner and non-owner requested) Delays in construction due to weather, late delivery of supplies/materials, etc.

What causes claims to arise? Causes (continued): Poor management and administration of construction site Failure of a party to disclose material information Termination of contract by owner or contractor Failure to adequately schedule or coordinate the work Failure of the parties to cooperate with each other in the performance of the work An understanding of the causes and types of construction claims at the outset will assist the parties in avoiding disputes/claims by allowing them to ensure that risks are properly allocated in the contract and that attention is paid early on to avoidance, dispute resolution and management of claims

What can you do at the design phase? Claims avoidance can be accomplished most effectively during the design phase of construction Plans and specifications – the more comprehensive, the less likely that claims will arise Design defects can be caused by errors and omissions or lack of coordination among the various aspects of the design Main result of deficient plans and specifications – delay

What can you do at the design phase? Consultant/Architect/Engineer: Prepare drawings and specifications with care and skill of such persons of ordinary competence If plans and specifications are insufficient – consultant will be first party to determine the issue If additional design is needed – act promptly Owner: Hire reputable design consultants

What can you do at the tender phase? Make the tender documents simple and understandable Include limitation and exclusion of liability clauses Include claims resolution process that is simple with short time duration Tender process: Submittal requirements must be clear Bid forms are clearly defined and unambiguous Review period is identified and appropriate

What can you do at the tender phase? As a contractor: Examine designs prior to bidding Inquire about patent design errors prior to submitting bid Perform a thorough site review Thorough site investigations include considering: General site conditions: soil conditions, utilities, etc. Surface conditions Subsurface conditions Permits, fees and tax requirements Weather data Equipment and materials to be used on site

What can you do at the contract phase? Careful preparation of well considered contracts offers the next greatest opportunity for claims avoidance Contract documents must reflect the intent of the project Be as clear as possible – contra preferentum rule may apply against you Be clear as to each party’s roles and responsibilities Review the contract documents for conflicts between different sections Ensure limitation clauses are worded appropriately and that you are comfortable with their content Allocate the risk to the party best able to control it

What can you do at the contract phase? Key elements: Scope of work Responsibilities of the parties Clear performance criteria Quality assurance system Reasonable schedule Change order procedures Payment provisions Disputes resolution procedure Notice requirements Applicable laws

Managing Construction Claims

How can you avoid construction claims on site? Once contracts are signed and construction begins, the avoidance of claims becomes more difficult, although the impact of claims can still be mitigated through timely management actions and effective contract administration Identification of potential claims: The earlier you identify potential claims – the easier they are to deal with Observation is key Know your contract and reference project documentation Keep track of the evolution of the project

How can you avoid construction claims on site? In order to identify claims early on: Implement cost, schedule and quality control procedures Keep track of the person-hours and cost of changed work in the field Keep track of progress Hold periodic progress reviews and inspections to ensure compliance

How can you avoid construction claims on site? Project documentation The party with the best paperwork wins!!

How can you avoid construction claims on site? Project documentation: Project records and documentation are the most critical element in a successful claim Facts have to be recorded and preserved A well-prepared package of facts and figures will support a negotiated settlement But remember: if a law suit is started against you, you will have to disclose all relevant documents to the other side

How can you avoid construction claims on site? Daily reports: Great tool to identify problems as they arise Records work progress Should include: Project name and number, date, weather and site conditions, contractor’s own forces (including supervisory personnel), hours worked (activity and description), equipment used, subcontractor hours and information, overtime hours, production and material installed, accidents, change orders Communication device between the field and the office If complete, detailed and factual, will become useful evidence in future litigation

How can you avoid construction claims on site? Deficient daily report: A deficient daily report can hurt you Most common mistakes: Leaving space blank Missing report Report not completed daily Misleading and vague information Imprecise wording

How can you manage construction claims on site? Notice: What are the contractual notice requirements? Do you have insurance notice requirements? Limitation periods?

How can you manage construction claims on site? Be reasonable Put reasonable people in charge of claims and give them authority to settle them Undertake weekly meetings to try and chip away at claims as the project proceeds Use the project consultant to mediate disputes to find early resolution

How can you manage construction claims on site? Communications: Be careful of “without prejudice” Think carefully before sending an – Would you want that to be read in Court? Have a pro-active and creative attitude Compromise: “Discourage litigation. Persuade your neighbours to compromise whenever you can. Point out to them how the nominal winner is often a real loser - in fees, expenses, and waste of time.” Abraham Lincoln

If you can’t manage them on site, what are your options? Access to counsel: Involve them early Collaborate with counsel in investigating and strategizing This will help minimize losses and limit the impact

If you can’t manage them on site, what are your options? In the event a dispute cannot be resolved quickly, the parties should carefully consider the dispute resolution provisions contained in the construction contract governing the project in question and the stipulated time requirements to make and advance the claim Possible dispute resolution mechanisms include: Graduated negotiations On site personnel Use of independent experts Without prejudice agreements Mediation Informal process Third-party professional assists you in reaching an agreement Mediation/Arbitration Two step process Mediator assists parties in reaching a negotiated settlement, failing which that person will have the right to make a final and binding decision

If you can’t manage them on site, what are your options? Possible dispute resolution mechanisms include (continued): Arbitration More formal process Arbitrator will make a final and binding decision Other: Dispute Review Board Rent-a-Judge-like mechanisms

Thank you!