40 / USAR LOGISTICS DISCUSSION Developing the role of logistics for 40.

Slides:



Advertisements
Similar presentations
Working at Height - Ladders. Legislation The Work at Height Regulations 2005 Ladders can be used for short duration work when: the risk assessment shows.
Advertisements

WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
ROAD SAFETY. Aim To familiarize the participants with: General road safety rules The United Nations Vehicle Regulations and how they apply to the peacekeeping.
STAGING BOONE COUNTY FIRE PROTECTION DISTRICT. What does staging mean to you?
Road Traffic Accident Procedures (3) Service Delivery 2.
Staging Area Set Up and Operation Workshop Refer to Field Operations Guide, Chapter 5 NERT College Disaster Operations.
NERT College Disaster Operations Disaster Operations - ICS Command Staff Workshop Refer to Field Operations Guide, Chapter 5.
Emergency Preparedness Program Nursing Services Orientation April 2010.
PIA Format The PIA is a review of Operations. It is used to analyze: What was done? What was done? What was done right? What was done right? What could.
Service Delivery 5 Resolve Other Incidents Aim To provide students with information about uncontrolled events.
Blackwood Fire Company
Air Rescue Operations  Overview of Program  This program is designed to familiarize all personnel with basic operations, layout and safety concerns.
TRANSPORTATION & EMERGENCY PREPAREDNESS CHECKLIST National Resource Center for Human Service Transportation Coordination (NRC)
Providing Safety Cover for Rowing Races What We Need to Know Tony Marshall British Sub Aqua Club.
1 Community Worksheet. 2 Task Force/Strike Team Commander Procedures 1.Determine/Advise Control Center of Task Force/Strike Team Assembly Staging Area.
Receipt, Storage & Staging (RSS) Partner Warehouse Operations How Businesses Can Partner with Public Health to Warehouse Supplies in a Public Health Emergency.
Incident Command System Basic Course
IS-100 Intro. to Incident Command System
Command Support Refresher & Update. Identification of Roles Everyone on the incident ground must be identified:- –Incident Commander - White surcoat –Operational.
Slide Team Leader Training 1. Slide Lesson One 2 Introduction.
Rapid Response Network External Agencies Workshop 26 th January 2011 Middleton Railway Paul Armitage Tony Firth.
Organisational Management and Development 2 Incident Command.
Rapid Intervention Team & MAYDAY Procedures
 SOPs are often called the ‘bible’ for your daily operation and as such should bring consistency to the actions of your team.  SOPs tend to fall into.
Unit Introduction and Overview
Continuity of Operations Planning COOP Overview for Leadership (Date)
Visual 7.1 Common Responsibilities Version 2.0 Unit 7: Common Responsibilities.
POD PLANNING GUIDE. INTRODUCTION This guide is intended to be a simplified step-by- step guide through the process of planning a Point of Dispensing (POD)
Course # Unit 3 - IEMP and PEMS. Unit 3 IEMP and PEMS Goals: Understand phases of emergency  Before the emergency (Mitigation, Prevention,
National Rural Transit Assistance Program. Learning Objectives Safety Safety Security Security Emergency Preparedness Emergency Preparedness.
1 Incident Command System For Schools Bob King Director of Security Wenatchee School District.
 Local Command Facility (Group role) to support Preparedness, Response & Recovery Operations within the Bellarine Group.  Incident Control Point for.
1 Mutual Aid District Dispatch Procedures 1.Contact the Task Force/Strike Team Commanders 2.Determine Assembly Staging Area 3.Advise Statewide Control.
Nursing Home Incident Command System
Wisconsin Department of Transportation Emergency Transportation Operations (ETO) Plan Development Status August, 2008.
WHAT HAPPENS NEXT? Part 1 Tim Thomas Raf Rescue MSA Trainer.
LIVE FIRE PREPARATIONS
Department of Consumer and Employment Protection Resources Safety 1 Please read this before using presentation This presentation is based on content presented.
Subjects covered in this module include: I200-SL Module 6 Responsibilities Associated with ICS Assignments Module 6 Responsibilities Associated with.
State of Florida Emergency Support Function 6 1 EMERGENCY SUPPORT FUNCTION 6 - MASS CARE & EMERGENCY ASSISTANCE “Training for incoming EMAC personnel”
 Ensure the scene is setup for a safe successful outcome  Request the necessary resources  Access and extricate the injured  Transport all patients.
Loading and Unloading of Drilling Rigs & Compressors Safe Transportation of Drilling Rigs and Compressors Drilling and Blasting Toolbox Talk : 02 This.
Northeast Colorado All Hazards Region 1 Mass Casualty Incident Plan Training Section 8 – Roles & Responsibilities.
Washington State Patrol Office of the State Fire Marshal Unit 5: Command and Support Structure of a State Mobilization.
Disaster Planning Workshop Hosted By: Pleasantview Fire Protection District.
Security Induction Version 4.0 March 2013 Security & Logistics Department Departure Training Session.
Finance and Administration Developed Using The CAP-USAF Pamphlet 12 and CAP ES materials 6/7/2016NESA 2012 phm1.
DSHS Deployable Teams. Deployable Teams 2011 Medical Incident Support Team - M-IST Ambulance Staging Manager - ASM Ambulance Strike Team Leader - ASTL.
ACS ACTIVATION. The first section of this presentation describes the initial activities of the ACS Staff. The second section describes the initial activities.
Local Distribution Site (LDS) Regional Distribution Site (RDS) County Drop Site (CDS) Staff Roles.
Module 3 Organization Overview Module 3 Organization Overview Subjects to be covered in this module include: Terminology Terminology Organizational structure.
Work Place Transport. Members of the BPF Health & Safety Committee.
MULTI- CASUALTY INCIDENTS GLENDALE FIRE DEPARTMENT ANNUAL TRAINING MARIANNE NEWBY.
Strategic National Stockpile Points of Dispensing (PODs)
Maintaining Safety Standards
Emergency Operations Plan
Maintaining Safety Standards
Dinwiddie County Fire & EMS Personnel Accountability System
Module 3 Organization Overview
Practice-related feedback
Air & Ground Ambulance Coordinator
Collection and Preservation of Physical Evidence
Orange ASP Training Module
Practice-related feedback
Practice-related feedback
Confidential - Not to be shared outside of PDO/PDO contractors
Drilling and Blasting Toolbox Talk : 02 Updated Aug 2014
Presentation transcript:

40 / USAR LOGISTICS DISCUSSION Developing the role of logistics for 40

40 / USAR LOGISTICS DISCUSSION Slide 2: The 6 stages of the incident When considering logistics we defined six stages of an incident:  Muster  Dispatch  Arrival  First Four Hours  Long Term  Incident End

40 / USAR LOGISTICS DISCUSSION Slide 3: Muster Part One MUSTER  Alerter  Station Folder (held in locked cupboard to protect data) Preformatted with everyone’s details  Initial Crew (Time stamped)  Back up crew logistics to be kept in BW  Back up crew may collect initial crews essentials  Comprehensive contact details (Standard check details confirmed) of both operational personnel and partners.  Initial crew to feed back actual requirements as soon as possible  Initial crew to be allowed home for five minutes to collect essentials

40 / USAR LOGISTICS DISCUSSION Slide 4: Muster Part Two MUSTER  As many first crew to attend as possible  40 to be advised destination and likely duration  We do not think that 40WL should be mobilised as there will already be plenty of pumps at an incident, (Security of pump and equipment at incident), Our role is logistics not operational so pump would be operational. If a pump was really necessary an HQ based pump would be better as it has just water and pump  If 40WL is to be mobilised then a replacement pump should be placed in BW.

40 / USAR LOGISTICS DISCUSSION Slide 5: Dispatch DISPATCH  40SV should be used, better still a crew cab transit would be optimum as it would provide an extremely useful resource on site moving equipment and people.  Where are we to be dispatched to? There is no point in USAR technicians driving prime movers as this exhausts them before they work. 40 crew should undertake all prime mover movements.  40 SV goes to Eastleigh to dispatch drivers, collects a grab bag and then goes straight to the incident to prepare for Prime Mover arrival.

40 / USAR LOGISTICS DISCUSSION Slide 6: Arrival Part One ARRIVAL 40 SV arrives and creates the right environment for equipment management throughout the incident: Logistics to be sited as close to the incident as possible, where this is not possible a forward logistics can be employed although suitable transportation is necessary to move equipment. Excellent communication between back and forward logistics is required with 40 to be at both logistic points.

40 / USAR LOGISTICS DISCUSSION Slide 7: Arrival Part Two ARRIVAL Our Functions  Cordon off area  Traffic paint pod placement  Establish incident layout for logistics  Marshall arrivals  Pinch point  Prepare Initial Response kit  Establish ‘most likely required’ kit  Prepare paperwork/system of recording

40 / USAR LOGISTICS DISCUSSION Slide 8: First Four Hours FIRST FOUR HOURS As this is the busiest time for logistics a full crew is essential, logistic roles may be combined:  Equipment recorder  Radio contact/Liaison with ICS  Create and work off early equipment requirement kit  Report back to BW  Record fuel  40 to maintain Prime Mover vehicles and security  Consider lighting

40 / USAR LOGISTICS DISCUSSION Slide 9: Long Term Long Term  Create a service environment for tools  Every 3 hours do incident collections for equipment repatriation  Fuel logistics (this could easily be managed by 40 with enough resources).  40 will manage our own resources through BW liaison with incident commander  Consistantly be aware of the incident and its requirements and ‘be one step ahead’

40 / USAR LOGISTICS DISCUSSION Slide 10: Incident End Incident End  Maybe all 40 to return to help in kit repatriation and vehicle movement?

40 / USAR LOGISTICS DISCUSSION Toolbox Slide 11: Toolbox  40 to create a checklist of consumeables  40 to creat a correct return record of broken kit  Grab bag  Create a document that contains information on all the kit in different orders: Technical Name | Household name | Alternative | Pod | Bay | Level  40 to create a laminated checklist covering all points required

40 / USAR LOGISTICS DISCUSSION Input Slide 12: Input