Position Statement on Sealed Truss Placement Diagrams for the State of California (including Los Angeles) Overview.

Slides:



Advertisements
Similar presentations
AIRWORTHINESS ASPECTS OF AIRCRAFT LEASING
Advertisements

Special Inspections
Radiopharmaceutical Production
Ensuring that building products meet code requirements ICC Evaluation Service, Inc. The ICC-ES Evaluation Committee conducts open public hearings on proposed.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
MODEL IMPLEMENTING IDERA REGULATION SUMMARY POWERPOINT FIRST EDITION NOVEMBER 2014.
Financial and Programmatic Monitoring ESEA/Act 807 ACSIP Arkansas Department of Education Division of Academic Accountability.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
U.S. DEPARTMENT OF LABOR EMPLOYMENT AND TRAINING ADMINISTRATION ARRA GREEN JOB AND HEALTH CARE / EMERGING INDUSTRIES NEW GRANTEE POST AWARD FORUM JUNE.
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
Introduction to Software Quality Assurance (SQA)
To teach specification preparation  the importance of well-prepared specifications in procurement  the different types of specifications  basic writing.
Typical Software Documents with an emphasis on writing proposals.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 1 The Spearing Doctrine and Definitions of “Complete” Construction Documents Presented by.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Ways for Improvement of Validity of Qualifications PHARE TVET RO2006/ Training and Advice for Further Development of the TVET.
Updates to Title 8. Anticipated Timeline… July - December 2013 Ideas Compiled Research and Drafting January 2014 Planning Commission Worksession Review.
Understanding Fire Sprinkler Systems (c) Nothing in this Act shall be construed to prevent a fire sprinkler contractor licensed under the Fire Sprinkler.
(SRS) SOFTWARE REQUIREMENT SPECIFICATION(SRS) 1. Topics to be discussed.. What is an SRS? Purpose of an SRS Who reads the SRS? Who writes the SRS? Characteristics.
Introduction to Codes, Standards, and Regulations.
Sprinkler Loads on Trusses
MWFRS Method v/s Components and Cladding Method for Truss Uplift Connection Design for Wind Overview.
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Building Code Overview.
Fire Resistance Rated Truss Assemblies Educational Overview.
A collaborative approach by practitioners, customers, and stakeholders October 27, 2010 Sacramento.
North Carolina General Statute May 2009 Gary Thompson, PLS work
Sprinkler Loads on Trusses Educational Presentation.
Assistant Instructor Nian K. Ghafoor Feb Definition of Proposal Proposal is a plan for master’s thesis or doctoral dissertation which provides the.
Overdriven Nails in Structural Sheathings Overview.
Wood Truss Council of America Wood Truss Council of America Presents In Conjunction With...
Inspection and Quality Assurance Requirements for Metal Plate Connected Wood Trusses Educational Overview.
Good Laboratory Practice
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview.
Project Report Format for Final Year Engineering Students.
What Constitutes a Truss Submittal Package? Overview.
Overview of Standards on Cost Auditing By: CMA Pradip H.Desai.
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
Truss Heel Heights and Energy Code Requirements
Software Quality Control and Quality Assurance: Introduction
Bottom Chord Live Load Concurrency and Truss Design
Use of Resilient Channel or Hat Channel to Meet the Lateral Restraint/Bracing Requirements of the Bottom Chords of MPCWT Floor Systems Overview Revised.
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
Use of Cantilevered Sill Plates with MPCWT to Align with Varying Thicknesses of Exterior Sheathing Overview Revised 3/22/2017.
Product Evaluation and Indemnification
Long Span Truss Installation
Impact of C&C loads due to ASCE/SEI 7-16
Particular Conditions of Contract & Appendix to Tender
Acceptance Process for Manufactured Products by Certification:
Particular Conditions of Contract & Appendix to Tender
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
ISO 9001 Awareness Training.
Claiming Children with Special Needs
Alignment of Part 4B with ISAE 3000
Use of the Professional Engineer’s Seal A PEO Practice Guideline
Overdriven Nails in Structural Sheathings
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
Department of Environmental Quality
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Floor Truss Ribbon Board Load Path
Truss Submittal Packages and Jobsite Packages
AS 9100 Awareness Training.
Working Drawings Legal Documents that Provide All the Visual, Numerical and Textural Information Required to Manufacture a Component, Mechanism or Structure.
What is OAL? The Office of Administrative Law (OAL) ensures that agency regulations are clear, necessary, legally valid, and available to the public. OAL.
Radiopharmaceutical Production
Presentation transcript:

Position Statement on Sealed Truss Placement Diagrams for the State of California (including Los Angeles) Overview

Introduction Do Truss Designers have the responsibility to seal a Truss Placement Diagram (TPD)? Short answer: NO

Why not seal TPDs? All necessary engineering design information is found on the Truss Design Drawings (TDD) If Truss Design Engineers were to seal a TPD, they could inappropriately be held responsible for ensuring the proper flow of loads through the structure to the foundation.

Why not seal TPDs? Compare a truss to a window: both are manufactured and in turn installed within a building. A window may be a highly engineered component of a house with specific installation specifications and instructions. However, there is no requirement to provide an engineer’s seal on the installation instructions for windows.

Purpose of TPDs To assist the builder in positioning or locating the trusses and components supplied by the manufacturer. To serve as detailed installation instructions To indicate the manufacturer’s assumed location for each truss and component

Background The code language regarding TPDs in the 2013 CBC is taken from the 2012 and 2015 IBC This definition was originally introduced in the 2006 IBC (S165-04/05) The proposal was intended to improve clarity in terminology and included only a definition of a TPD : – Truss placement diagrams. Diagrams supplied by the truss manufacturer that identify the individually designated truss design drawings do not require the seal of a truss design engineer.

Background The proposal was modified during the 2006 IBC hearing process as follows: – Truss Placement Diagram. The truss manufacturer shall provide a truss placement diagram that identifies the proposed location for each individually designated truss and references the corresponding truss design drawing. The truss placement diagram shall be provided as part of the truss submittal package, and with the shipment of trusses delivered to the job site. Truss placement diagrams shall not be required to bear the seal or signature of the truss designer. – Exception: When the Truss Placement Diagram is prepared under the direct supervision of a registered design professional, it is required to be signed and sealed.

Background In the 2009 IBC the definition of a TPD was revised again (S217-07/08) as proposed by the National Council of Structural Engineers Associations (NCSEA): – Truss placement diagram. The truss manufacturer shall provide a truss placement diagram that identifies the proposed location for each individually designated truss and references the corresponding truss design drawing. The truss placement diagram shall be provided as part of the truss submittal package, and with the shipment of trusses delivered to the job site. Truss placement diagrams that serve only as a guide for installation and do not deviate from the permit submittal drawings shall not be required to bear the seal or signature of the truss designer.

Background The rationale for the change proposed by S217-07/08 is as follows: – The truss placement diagram is an erection diagram that replicates the information on the approved construction documents per Section As it requires no engineering input, direct supervision and the signature and seal of a registered design professional is not required.

Background The Commentary to the 2012 IBC Section confirms the original intent of the code change.2012 IBC Section – This section describes and defines the term "truss placement diagram." It is intended to minimize the confusion that exists in the construction industry between a variety of terms that are often used interchangeably, such as "installation documents," "construction documents," "shop drawings," etc. The term "truss placement diagram" is preferred by the truss industry and is very specific. The section requires a truss placement diagram to identify the location of each truss and references the corresponding truss design drawing to facilitate inspection and proper installation.

Analysis The 2013 California Building Code is modeled after the 2012 IBC, and therefore many sections are identical between the two documents, including sections relevant to TPDs Truss design drawings Truss design drawings Truss placement diagram Truss placement diagram Truss submittal package Truss submittal package

Analysis The 2013 California Building Code provides that the plans and specifications for a project shall be prepared by an RDP where required by the project’s jurisdiction. The plans and specifications should in turn clearly define the scope of the work proposed by the Building Designer. CBC General (Submittal Documents) CBC General (Submittal Documents) CBC Information on construction documents. CBC Information on construction documents.

Analysis California Statutes for Professional Engineering – The California professional engineering law and the California Building Code provide the basis upon which to evaluate the need to provide an engineer’s seal on a TPD. – Based on this evaluation, a TPD does not require a professional engineer’s seal for any building projects, including DSA-SS, DSA-SS/CC and OSHPD.

Analysis Requiring the TPD to be sealed, where it is not prepared by an engineer or under his/her immediate personal supervision, is contrary to California law. Rules of the Board for Professional Engineers and Land Surveyors 411. Seal and Signature. (g) Rules of the Board for Professional Engineers and Land Surveyors 411. Seal and Signature. (g) Professional Engineers Act 6735 Preparation, signing, and sealing of civil engineering documents (a) Professional Engineers Act 6735 Preparation, signing, and sealing of civil engineering documents (a)

Analysis ANSI/TPI , referenced by the 2013 CBC, clearly states that TPDs do not require an engineer’s seal when they serve only as a guide for Truss installation The commentary further explains the intent of the standardcommentary Truss Placement Diagram. …When the Truss Placement Diagram serves only as a guide for Truss installation and requires no engineering input, it does not require the seal of any Truss Design Engineer or Registered Design Professional.

Analysis The Truss Designer’s sole responsibility is to design the individual trusses according to information provided by the RDP or Building Designer The Truss Designer is therefore specifically responsible for the single truss design depicted on each TDD.

Analysis TPDs are typically prepared by component manufacturer personnel other than Truss Designers. The TPDs may not be reviewed or even seen by the Truss Designer. It is therefore understood that TPDs are not prepared under the Truss Designer’s direct supervision.

Findings The 2013 California Building Code specifies in Section that a Truss Placement Plan does not require the seal of the truss designer when the TDD serves as a guide for installers. It is the responsibility of the Building Designer to review the TPD, if provided, and verify that it does not deviate from the permit submittal documents.

Conclusion Truss Design Engineers should NOT be asked by RDPs, Building Designers or Building Code Officials to seal TPDs.

References ANSI/ TPI, National Design Standard for Metal Plate Connected Wood Truss Construction, Truss Plate Institute, 2007 International Building Code, International Code Council, 2006, 2009, 2012, 2015 California Code of Regulations, Title 24 (California Building Standards Code), International Code Council, California Professional Engineers Act, Rules of the Board for Professional Engineers and Land Surveyors