Lisbon, 29.-30.01.2004 1 Report on OBT installations -50 OBTs and sensors to be installed on wagons: - 35 CP (sggmrss – flat wagon with 102 ton cargo capacity)

Slides:



Advertisements
Similar presentations
KEVIN B. PAGE VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION VIRGINIAS RAILROADS A STAKEHOLDER IN TRANSPORTATION DEVELOPMENT.
Advertisements

Wildland Fire Management Information (WFMI) Weather Lesson 6: How to Order Sensors April 2014.
F-MAN OBT comms Status report Challenges, Issues …
D11.2 – The Story Each test operator will test the system in different corridors in Europe. CP use one corridor, PI use another corridor, SIGMA has got.
Copyright © 2008 Waiting Room Solutions Waiting Room Solutions Training: Support Portal.
Paris, June Wagon management information flow on Slovenian Railways wagon ordering wagon maintenance.
WP3- Development: Milestone M3 Lisbon 30 January 2004 National Technical University of Athens.
F-MAN Meeting 10/11 April 2003 EDC Presentation EDC  The TSM ground application OBT Centralised SMS hub  Communications Interface Issues & possibilities.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH
Figure 6-1: Transport Request Data Entities: CS: Customer OM: Order manager OPM: Operational manager FM: Fleet Manager MM: Maintenance manager OBT: On.
Kranjska Gora, Installation – plan, delivery -PI installation on Slovenian Railways’ wagons: -3 Uacs -2 Himrrs -Delivery of OBTs and loading.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
1 Project Close-out SPS Round Table January 17, 2006.
1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH
UGDIE PROJECT MEETING Athens – September WP8 - Project Management 2 nd Cost Statement –Bank transfers processed on September 6 th –TECNO “virtual”
Parts Disposition on Service Orders - a custom solution Pieter de Bruyn Session: 4005.
Crete Meeting April 10 th – 11 st, 2003 WP3 Sciro Presentation.
ΑΝΝΕΧ 3 by SCIRO. Task 2.1 – Functional requirements definition Task 2.1 aims at drawing the functional analysis of F-MAN, starting from the users’ needs.
Kranjska Gora, Test plan - PI will test F-MAN tools on: - 2 types of wagons (Uacs, Himrrs) - 2 types of operation (timetable supervision.
UGDIE PROJECT MEETING Athens – September On-site Final Review Venue and dates –Genoa, UGDIE + SCIRO premises –December 2 nd (afternoon) –
Octopus F-MAN FM OPM OM Standards and Norms Environment MM Wagons F2 F1 F3 Contractual data Wagons owner F4 F5 F6 F9 F7 F8 F10 F11 F12.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Elliott eStore.Net Edward M. Kwang President. Elliott eStore & eStore.Net eStore –Elliott Real Time Shopping Cart Solution –Real Time Order & Invoice.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
The School Board of Broward County, Florida Non-Instructional Personnel Online Course Orientation 9/5/2015.
Aitons’ Equipment. Type in your user name and password And click sign in Hit enter for next page.
1 On Board Terminal  Technical characteristics  Functions  Messages  SIM requirements  Sensors for OBT  Installation.
Elliott eOrders.Net Edward M. Kwang, President Rachel R. Locklair, Project Lead.
Presentation by SNCF in 19/20 April 2004 Meeting in Kranjska.
Company Logo Making the Switch from Oil to LPG Presented by Brian Murphy - Technical Services Engineer 20 th April 2015.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
OFFICE DEPOT ONLINE ORDER AND TEAMS PROJECT REQUISITION.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Future Perspectives of Ocean Observatories in Germany [Name of the infrastructure / site / time series…] Contact person: [name, ] [Institution(s)
Waste Isolation Pilot Plant Program Status National Governors’ Association Meeting May 17, 2002 Alton D. Harris, III.
Rename ‘How to Order’ to Order Support. Order Support How to Order You may place an order with GeneCopoeia by doing one of the following: 1) Fax to
Emery USD 2013/2014 Compute Purchase Plan. CURRENT EUSD STUDENT COMPUTERS Student Computers: Currently students have computers that approximately 5+ years.
Proposal for a DFCS Learning Object Repository For Use by Training Center Coordinators.
OFFICE MANAGER’S MEETING APRIL 12, 2011 BOARDROOM.
What is J2EE Platform The Java 2 Platform Enterprise Edition (J2EE) defines the standard for developing multitier enterprise applications.
IP Accountability in Outpatient Clinical Trials
Suppliers without a Contract Purchase Order for Services.
F-MAN Kranjska Gora, 19th - 20th April RIV CHANGES Most probably that with 1st of January 2005 the “old” RIV expires.
Vehicle Routing Problem
SCG PAPER: SAP By: Panidda P./ Narinthip W./ Pabhabwich S.
PORTS Marina Zanne, M.Sc.
PROCURE TO PAY REPORTS April 2016 Cindi Stinebaugh.
ΑΝΝΕΧ 10 by EK. Rail Operators‘ Group (1) 1.Background F-Man Cargo operators: FS, CP, SZ. Their responsibilities: - to define their needs for a F-Man.
Budapest 12th & 13th november 2008
The Bridgeview Maritime Pvt Ltd provides high quality and dependable Technical Consultancy and Human Resource services in Commercial Ship management,
Responding to an Onsite Visit
TAF TSI implementation in LDZ CARGO Ltd
Visit for more Learning Resources
Procurement Process 1/20/2016 cl.
BUSINESS PROCESSES MAP
Faraday Future Shipping Portal Instruction Manual
Welcome to the Arkansas
Human resources announces: electronic employee contract/notification system contract/notification offers will be distributed via utilizing.
Suppliers without a Contract
IBC Review Pathway Approximate Timeline Online status Online“Sub”State
Staff EPAF Notifications
Close-out Procedures 90 Days

© easilyinteractive.com 2008
Commercial Heating Oil Delivery Service
User Pays Invoicing Type 1
Presentation transcript:

Lisbon, Report on OBT installations -50 OBTs and sensors to be installed on wagons: - 35 CP (sggmrss – flat wagon with 102 ton cargo capacity) - 10 SNCF (8 S56, 2 s58 – steel coils and old iron) - 5 SZ (3 Uacs – borax, 2 Himrs) -OBT installation sites: - CP: Bobadela Intermodal Terminal, near Lisbon - SNCF: Miramas, marshalling yard near Marseille - SZ: Divaca, maintenance plant -Delivery of OBTs: - CP: OBTssensors (shipped) - SNCF:OBTssensors - SZ:OBTssensors

Lisbon, OBT Installations - OBTs delivery place: - SNCF: Miramas - SZ: PI premises - Purchase of 15 OBT-s – not yet: -SCIRO:6 OBTs -IVU:4 OBTs -EDC:3 OBTs -PI:2 OBTs Logosystem is waiting for EDC order – problem with TECHNO invoice ( – solved? ). Transportdata needs to return to EDC 13 unused SIMs ( – sloved? ). GC has sent to Mr. Santucci OBTs consignment status inquiry ( ). Anticipation of invoice issue by Logosystem? Anticipation of delivery date:

Lisbon, Realisation and supervision of OBT installation: - Installation of OBTs will be performed by the operators’ personnel under the supervision of provider’s technical staff (Logosystem) – SNCF: 3 days, SZ 2 days Anticipation of installation date: -Wagon numbers available? -CP? -SNCF? -SZ has provided 3 wagon numbers, 2 in a short notice before installation – upon availability. -F-MAN tests notification -Fleet managers on corridors should receive notice about wagons on test corridors. Wagons without corridors run without restrictions. Wagon owner should be addressed by F-MAN scientific coordinator. OBT Installations

Lisbon, OBT Installations - actions

Lisbon, OBT Installations - actions