October 29, 2012 RARF Workshop 2 ERCOT RARF Data Request Issues Jay Teixeira Manager, Model Administration.

Slides:



Advertisements
Similar presentations
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Advertisements

Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
Testing Workshop: Reactive Capability Testing
Don Blackburn Vice Chair
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
Lecture #15 EEE 574 Dr. Dan Tylavsky Breaker to Bus Modeling.
Discussion of MOD Comparison to ERCOT Requirements Luminant OWG, May 21,
Resource Asset Registration Form Version 5.0 / 5.1 Changes for WGRs QMWG Presentation - July 9, 2012.
Network Modeling Group Modeling Off Nominal Transformers in NMMS By Nitika Mago, Model Administration.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 16, 2010.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
ERCOT John Adams September 14, 2012 Planning Guide concepts for dealing with Sub Synchronous Resonance in ERCOT & other issues.
RARF QnA Session April 17, Resource Registration Process and Schedule Final RARF forms sent during week of April 7 –New Resources should get blank.
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
Workshop: Reactive Power Testing:
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
RARF Frequently Asked Questions from Resource Entities Ed Geer RARF Workshop III 8/29/2013.
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
SIMPLE TRANSMISSION OUTAGE. Nodal Protocol Definition 2.26 Simple Transmission Outage A Planned Outage or Maintenance Outage of any Transmission Element.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
SPWG SHORT CIRCUIT CASE BUILDING AND DEVELOPMENT July 17, 2014 Qiuli Yu and Jay Teixeira ERCOT.
NPRR425 - Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR Art Deller, P.E. RARF Workshop 8/29/13.
Resource Asset Registration Form Version 5.1 Update July 12, 2012.
Status Update: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window Aug 14, 2009.
Lead from the front Texas Nodal 1 Registration Data Collection June Window May 22, 2009 Kick Off Meeting.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Shared versus Switched Media.
Option 2 Summary Wes Woitt CenterPoint Energy 2010 SSWG Chair.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
Lead from the front Texas Nodal 1 Registration Market Call Mar 27, 2009.
1 Update to NATF on Resource Registration Feb 2, 2010.
1 Submitting a RARF Art Deller, P.E. Supervisor, Model Administration New Generation Workshop November 4, 2014.
Nov 5, RRGRR 007 Adding Solar Registration Inputs The RDWG met on October 20, and has completed it’s review of RRGRR 007 with the revised Impact.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Distributed Generation Registration June 30, 2008.
Steady-State Working Group: Resource Modeling Discussion Wes Woitt September 27 th, 2011.
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 19, 2009.
Nodal Planning Model Process and Data Set A case use June 28, 2010 Planning Working Group.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
RARF QnA Session November 1, General Information EDS 4-1 RARF due on Friday, November 9, This includes pink, blue, white cells. (Also should.
Status Update to ROS: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Lead from the front Texas Nodal 1 MP10 / MP11 Registration Data Update Oct 14, 2008 TPTF.
ARM7 Architecture What We Have Learned up to Now.
Issues with Reactive Testing and the NDCRC S. Looney QMWG, 11/5/2012.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Subsynchronous Resonance Update Jeff Billo, Senior Manager ERCOT Transmission Planning February 3, 2016 Wholesale Market Subcommittee 1ERCOT Public.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
Abilene Mc Camey Big Spring. Far West Abilene Area All the values are based on returned ERCOT survey results Total number of Wind Powered Generation.
Texas Nodal Electrical Buses and Outage Scheduling.
ERCOT SYSTEM PLANNING Dynamic Model Data Management.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
Nodal Planning Go Live Austin, TX February 3, 2011
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Registration Data Collection September Window
GIC System Model Workshop
Resource Asset Registration Form – Business Rule updates
A Symmetrical Hybrid Power Flow Controller
Presentation transcript:

October 29, 2012 RARF Workshop 2 ERCOT RARF Data Request Issues Jay Teixeira Manager, Model Administration

2 RARF Workshop 2October 29, 2012 Data Request Summary – Auxiliary Load 1.Used to convert from Gross values to Net which Planning software expects 2.Not for when unit is off-line 3.Enter for when unit is at HSL

3 RARF Workshop 2October 29, 2012 Zero Sequence Data - Winding Connection Code (Current) 1.Reduced from original 1-9 to Test Report needed for Code 5

4 RARF Workshop 2October 29, 2012 Proposed Winding Connection Codes

5 RARF Workshop 2October 29, 2012 Proposed Winding Connection Code Diagrams Copyrighted – used with permission

6 RARF Workshop 2October 29, 2012 RARF Reactive Curve versus NDCRC Test Data - Limits

7 RARF Workshop 2October 29, 2012 RARF Reactive Curve versus NDCRC Test Data – Aux Load

8 RARF Workshop 2October 29, 2012 RARF Transmission Form Breaker-Switch Tab - Ratings Ratings for Breaker and Switches are not required unless ERCOT, TSP, or RE wants the ratings to be reflected in planning cases (Feedback through WCS to RE) Breaker and Switches normally reduced by Topology Processor and not in Planning Cases

Questions? October 29, 2012RARF Workshop 2