Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.

Slides:



Advertisements
Similar presentations
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Advertisements

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
Construction and Installation of the CLIC Experimental Area
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
ILC CFS / CLIC CES Studies for the Interaction Region : - An action was given at the Geneva Linear Collider Meeting for CFS to develop a more in-depth.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
CES Studies at CERN for the Interaction Region : -Summary of Linear Collider IR meeting at CERN held on 16 February Design Brief for external design.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Civil Engineering Update
Conventional Facility & Siting (CF&S) Overview for the Positron Source
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
ILC GLOBAL SYSTEMS MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Tom Lackowski Revised 10/12/2011
Presentation transcript:

Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne September 20, 2007

2 IRENG07 Working Group C - Conventional Facilities Overview Agenda Items for Parallel SessionsAgenda Items for Parallel Sessions –On-Surface and Underground Assembly Options –Detector Shielding Designs –Hall and Building Sizes –Crane Coverage and Capacity –Shafts and Cavern Sizes –Minimum Space Requirements –Services –Utilities

3 IRENG07 Working Group C - Conventional Facilities Parallel Sessions Due to the Commonality of the Working Group Charges, Both Groups Participated in Joint Parallel sessionsDue to the Commonality of the Working Group Charges, Both Groups Participated in Joint Parallel sessions Details of Specifications and Criteria to Support and/or Adjust the RDR Design were Discussed and RefinedDetails of Specifications and Criteria to Support and/or Adjust the RDR Design were Discussed and Refined For Cavern Dimensioning, we used the Largest Detector as the Determining FactorFor Cavern Dimensioning, we used the Largest Detector as the Determining Factor We also Established that HVAC, Process Water and Electrical Supply Requirements were Uniform for all Detector OptionsWe also Established that HVAC, Process Water and Electrical Supply Requirements were Uniform for all Detector Options Decisions/Consensus were Recorded on Spreadsheets that will be Edited and Included in the Interface Document that is Currently in Draft FormDecisions/Consensus were Recorded on Spreadsheets that will be Edited and Included in the Interface Document that is Currently in Draft Form

4 IRENG07 Working Group C - Conventional Facilities Parallel Sessions Alternatives to the RDR Design Basis were ReviewedAlternatives to the RDR Design Basis were Reviewed –Off-Set Access Shafts from Surface Assembly Buildings –Alterations Required to the Interaction Region for Collisions –Alterations Required to the Interaction Region for γγ Collisions A Number of Items were also Identified for the CFS Group to InvestigateA Number of Items were also Identified for the CFS Group to Investigate –Further Development of Cavern Cross Section with Realistic Crane Dimensions and Supports –Investigation of Alternate Shaft Configurations with Related Costs Substantial Changes to the RDR Design will Require Formal Review and Approval by the ILC Project Management GroupSubstantial Changes to the RDR Design will Require Formal Review and Approval by the ILC Project Management Group

5 IRENG07 Working Group C - Conventional Facilities Criteria Examples

6 IRENG07 Working Group C - Conventional Facilities Criteria Examples

7 IRENG07 Working Group C - Conventional Facilities Value Engineering Where Options or Alternative Design Solutions are Being Considered, the Value Engineering Process can be Used to Facilitate the Decision ProcessWhere Options or Alternative Design Solutions are Being Considered, the Value Engineering Process can be Used to Facilitate the Decision Process When Employing the Value Engineering Process all Aspects of the Various Alternatives must be Considered in Order to Determine the Best “Value”When Employing the Value Engineering Process all Aspects of the Various Alternatives must be Considered in Order to Determine the Best “Value” “Value” does not Necessarily Equate to “Cost”“Value” does not Necessarily Equate to “Cost”

8 IRENG07 Working Group C - Conventional Facilities Other Topics of Discussion Air Pads vs Platform for Detector MovementAir Pads vs Platform for Detector Movement Impacts of Schedule on the RDR Base DesignImpacts of Schedule on the RDR Base Design –Surface Assembly of Detectors –Implications of Below Ground Detector Assembly Requirements for Shielding Walls in the Interaction RegionRequirements for Shielding Walls in the Interaction Region Cryo Supply to DetectorsCryo Supply to Detectors Other Services Required for DetectorsOther Services Required for Detectors

9 IRENG07 Working Group C - Conventional Facilities Summary A Very Productive Exchange of InformationA Very Productive Exchange of Information There are Still Evolving Constraints and CriteriaThere are Still Evolving Constraints and Criteria The CFS Group has a Few More Tasks to Add to Their Work ListThe CFS Group has a Few More Tasks to Add to Their Work List We will Need to Revisit Some IssuesWe will Need to Revisit Some Issues What’s the Next StepWhat’s the Next Step