Mid Term Review Meeting, 26 September 20121 * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.

Slides:



Advertisements
Similar presentations
Florent Bernard, PhD DG Research European Commission “People” Programme : The Marie Curie Actions in FP7.
Advertisements

Marie Curie Actions at CERN
The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Slide 1 CATHI Project Administration Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI kick-off meeting CERN 23 May 2011.
Research and Innovation Research and Innovation Research and Innovation Research and Innovation Research Infrastructures and Horizon 2020 The EU Framework.
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Science, research and developmentEuropean Commission HUMAN FACTOR, MOBILITY AND MARIE CURIE ACTIONS Page 1 Marie Curie Schemes - Proposal for FP6 Roma.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
PROPHET Postgraduate Research on Photonics as an Enabling Technology 0.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
Final Review Meeting, September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
Mid Term Review Meeting, 26 September 2012P. FARANTATOS1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Mid Term Review Meeting, 26 September 2012E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Slide 1 ACEOLE Training Seamus Hegarty Human Resources Department Marie Curie Actions administrator ACEOLE kick-off meeting CERN 2 October 2008.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
CATHI Project Administration Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI General Meeting CERN 14 November 2011.
Mid Term Review Meeting, 26 September 2012N. SURNAME1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HIE-ISOLDE Project Y. Kadi (EN-STI) On behalf of the HIE-ISOLDE Coordination team.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
CATHI Final Review Meeting, September 2014E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
The HIE-ISOLDE Faraday Cup
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
Mid Term Review Meeting, 26 September 2012M.AUGUSTIN1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Slide 1 CATHI Training Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI kick-off meeting CERN 23 May 2011.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Science, research and developmentEuropean Commission HUMAN FACTOR, MOBILITY AND MARIE CURIE ACTIONS Page 1 Marie Curie Schemes - Proposal for FP6 10/09/2002.
Mid Term Review Meeting, 26 September 2012A. Shornikov 1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
Mid Term Review Meeting, 26 September * This research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the.
Scope of CERN SC RF Activities Status Report for A&T Sector Meeting 18 Nov’13 BE, TE, EN Departments Summarized by José Miguel JIMENEZ 1 BE-RF (E. Jensen*,
O. Kester, NuSTAR annual meeting, 27/02/2013
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Plans and schedule for the Long Shutdown LS1 Hie Isolde Physics Coordination Group CERN, 1 March 2012 Hie-Isolde Erwin Siesling.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Status and Future Perspective of the HIE-ISOLDE Project CERN, November 19-20, 2012
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Naming convention Rules
Marie Curie Research Training Networks Mid-Term Review Meeting
Update on Spanish Recruitment: Students, Staff, Fellows, Associates
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
Human Resources and Mobility in the 6th Framework Programme (FP6)
HIE-LINAC status report
Report on HIE-ISOLDE Status
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
Tasks, Responsibilities Expectations and Needs
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Presentation transcript:

Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh Programme under contract number (PITN-GA CATHI) Co-ordinator’s Report CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Yacine Kadi (EN-HDO) Project Co-ordinator Mid-Term Review Meeting, 26 September 2012

Mid Term Review Meeting, 26 September Co-ordinator’s Report Outline  The ISOLDE Facility and it’s upgrade: HIE- ISOLDE  CATHI and HIE-ISOLDE  Scientific Overview  Networking  Administrative & Management Issues  Conclusions and Prospects

Mid Term Review Meeting, 26 September Co-ordinator’s Report ISOLDE: the ISOL-type RIB CERN Pulsed 1.4 GeV Proton beam Courtesy D. Voulot

Mid Term Review Meeting, 26 September Co-ordinator’s Report USERS & SCIENCE > 500 users (~5% of CERN’s total) 25 countries; 100 institutions 175 experiments (4 years)

Mid Term Review Meeting, 26 September Co-ordinator’s Report ISOLDE

Mid Term Review Meeting, 26 September Co-ordinator’s Report ISOLDE Today Offers the Largest Range of Available Isotopes Worldwide

Mid Term Review Meeting, 26 September Co-ordinator’s Report HIE-ISOLDE aims at increasing the energy of the RIB up to 10AMeV and their intensity by a factor 10 Energy Upgrade: The HIE-ISOLDE project concentrates on the construction of the SC LINAC and associated infrastructure in order to upgrade the energy of the post- accelerated radioactive ion beams to 5.5 MeV/u in 2014 and 10 MeV/u by 2016 Intensity Upgrade: The design study for the intensity upgrade, also part of HIE-ISOLDE, started in 2012, and addresses the technical feasibility and cost estimate for operating the facility at 15 kW once LINAC4 and PS Booster are online. Beam Quality Upgrade: RFQ cooler and buncher Solid state lasers for RILIS Higher mass resolving power HRS

Mid Term Review Meeting, 26 September Courtesy F. Wenander

Mid Term Review Meeting, 26 September Co-ordinator’s Report Superconducting LINAC installed in Three Phases 3 stages installation 1.2 MeV/u 3 MeV/u 5.5 MeV/u 10 MeV/u Now >2017

Mid Term Review Meeting, 26 September Co-ordinator’s Report NuPECC Long Range Plan 2010 Timeline for RIB Facilities

Mid Term Review Meeting, 26 September Co-ordinator’s Report Outline  The ISOLDE Facility and it’s upgrade: HIE-ISOLDE  CATHI and HIE-ISOLDE  Scientific Overview  Networking  Administrative & Management Issues  Conclusions and Prospects

Mid Term Review Meeting, 26 September Co-ordinator’s Report CATHI and HIE-ISOLDE  CATHI – Cryogenics, Accelerators and Targets at HIE-ISOLDE.  The HIE-ISOLDE project at CERN is an ideal R & D opportunity to train young engineers over a range of disciplines relevant to the accelerator and nuclear industry.  CERN and the associated partners of CATHI can provide excellent hands-on and academic training.  ISOLDE provides a multi-disciplinary environment on a scale that encourages collaboration and teamwork.

Mid Term Review Meeting, 26 September Co-ordinator’s Report Research Training Themes (20 Fellows over 4 years)

HIE-ISOLDE Project 1. Project Management 2. Linac Systems 4. Installation & Commissioning 4. Installation & Commissioning 3. Infrastructure & Integration 3. Infrastructure & Integration 8.3 Fire & Gas Hazard GS/ASE 8.2 Radioprotection DG/SCR HIE-LINAC Design Study 5. Target Study 6. Target Area and Class-A Lab Integration 7. Injection & Beam distribution 8.4 Access System GS/ASE 8. Safety 2.1 Cavity RF BE/RF 2.2 Cavity Design manufacturing EN/MME TE/VSC 2.3 Beam dynamics BE/RF-ABP 2.4 Cryomodules TE/MSC EN/MME 2.5 Beam Instrumentations BE/BI 2.6 SC Solenoid TE/MSC 2.7 Beam transfer line (magnets) TE/MSC 2.8 Linac Integration EN/MEF 2.9 Vacuum TE/VCS 2.10 Survey BE/ABP 3.4 Electrical systems EN/EL 3.5 Cryogenic system TE/CRG 3.6 Power converters TE/EPC 3.7 Industrial Control system EN/ICE 4.1 Single cavity test BE/RF 4.2 Cryomodule test BE/RF 4.3 Transport & Handling EN/HE 3.8 Beam Control system BE/CO 5.1 Target design EN/STI-HE 5.2 Front Ends EN/STI TE/EPC-ABT 5.3 Beam Diagnostics BE/BI 6.1 Layout upgrade EN/MEF 6.2 Cooling and ventilation EN/CV 6.3 Electrical systems EN/EL 6.4 Vacuum TE/VCS 6.5 Survey BE/ABP 6.6 Civil engineering GS/SEM 6.7 LL Control system EN/STI 7.1 Off line separator EN/STI 7.2 Separator areas EN/STI 7.3 Experiment Hall EN/MEF 7.4 Beam lines BE/ABP Steering Committee International Advisory Panel 8.1 Safety Coordinator GS/DI 3.1 Civil Engineering GS/SEM 3.2 Integration EN/MEF 3.3 Cooling ventilation EN/CV 3.9 Interlocks TE/MPE 4.4 Planning & Installation EN/MEF 4.5 Linac commissioning BE/RF-OP 1.1 Project Leader – Y. Kadi (EN/HDO) 1.2 Project Safety Coordinator – A.P. Bernardes 1.3 SC Linac Coordinator – W. Venturini BE/RF 1.4 Design Study Coordinator–R.Catherall EN/STI 1.7 Budget and Planning – E.Delachenal EN/GMS 1.8 Administration – A. Rasmussen EN/GMS CATHI Fellows represent 1/3 rd of the manpower deployed on the project 1.5 Installation Coordinator – E. Siesling BE/OP 1.6 Detailed Activity Planning – E. Siesling BE/OP

Mid Term Review Meeting, 26 September Co-ordinator’s Report Outline  The ISOLDE Facility and it’s upgrade: HIE-ISOLDE  CATHI and HIE-ISOLDE  Scientific Overview  Networking  Administrative & Management Issues  Conclusions and Prospects

Mid Term Review Meeting, 26 September Co-ordinator’s Report Scientific Highlights (1/9)

Mid Term Review Meeting, 26 September Co-ordinator’s Report Key Technologies

Mid Term Review Meeting, 26 September Co-ordinator’s Report Scientific Highlights (2/9)

Mid Term Review Meeting, 26 September Co-ordinator’s Report HIE-ISOLDE Diagnostic Box

Mid Term Review Meeting, 26 September Co-ordinator’s Report Scientific Highlights (3/9)

Mid Term Review Meeting, 26 September Co-ordinator’s Report Linac & HEBT Magnets

Mid Term Review Meeting, 26 September Co-ordinator’s Report Scientific Highlights (4/9)

Mid Term Review Meeting, 26 September Co-ordinator’s Report Integration Studies Transport zone Large dipole EPC racks Cable trays Collision s

Mid Term Review Meeting, 26 September Co-ordinator’s Report Novel alignment monitoring system Features:  Allows almost continuous monitoring of the position of cavities and solenoids  Allow reconstruction of positions of cold elements in the whole linac (not limited to a single cryomodule)  Radiation resistant and … It’s affordable

Mid Term Review Meeting, 26 September Co-ordinator’s Report Scientific Highlights (5/9)

Mid Term Review Meeting, 26 September Co-ordinator’s Report Scientific Highlights (6/9)

Mid Term Review Meeting, 26 September Co-ordinator’s Report Target and Front-End Design Issues to be addressed Targets Target lifetime, material science, ion source optimization, geometry, energy deposition, handling, elimination pathway. Front Ends Material resistance, maintenance, optics, vacuum systems, remote operation… Starting point Fluka simulation of induced radiation Necessary for both Design Study and High Energy project Will provide input for shielding studies

Mid Term Review Meeting, 26 September Co-ordinator’s Report Scientific Highlights (7/9)

Mid Term Review Meeting, 26 September Co-ordinator’s Report Cooling and Ventilation System Issues to be addressed Air activation Separation of ventilation systems Separation of ventilated zones Activated cooling water

Mid Term Review Meeting, 26 September Co-ordinator’s Report Scientific Highlights (8/9)

Mid Term Review Meeting, 26 September Co-ordinator’s Report New HRS Layout Special field shaping quads

Mid Term Review Meeting, 26 September Co-ordinator’s Report Scientific Highlights (9/9)

Mid Term Review Meeting, 26 September Co-ordinator’s Report Construction Phase Shielding RF cavities and secondary beam shieldings to be defined Radiation levels impact on existing and new facilities

Mid Term Review Meeting, 26 September Co-ordinator’s Report Scientific Overview More details will follow in the individual presentations of the CATHI fellows What’s next: More on writing up specifications, production follow-up, installation and tests Emphasis on secondment at associated partners Publications and conferences

Mid Term Review Meeting, 26 September Co-ordinator’s Report TRAINING Hands-on research training complemented by formal training: CERN Training Programmes Academic Training CERN Seminars CERN Accelerator School Technical Training International Conferences LINAC, IPAC, SRF, ICIS, EMIS, RNB, IEEE Real- Time……… Training during secondment Up to 30% of contract duration Complementary Training CERN Management and Communication courses Other external training courses

Mid Term Review Meeting, 26 September Co-ordinator’s Report Outline  The ISOLDE Facility and it’s upgrade: HIE-ISOLDE  CATHI and HIE-ISOLDE  Scientific Overview  Networking  Administrative & Management Issues  Conclusions and Prospects

Mid Term Review Meeting, 26 September Co-ordinator’s Report WORKING TOGETHER (1/2) CATHI partners Pre-existing relationships and/or collaborations CERN services tailored to support international collaborations EU funding covers People: Researcher salaries + social conditions Training & Mobility ITN Management Organization of workshops, conferences It does not cover research project costs That’s why CATHI research programmes have been integrated into approved HIE-ISOLDE project

Mid Term Review Meeting, 26 September Co-ordinator’s Report WORKING TOGETHER (2/2) Supervisory Board (once per year) Approve and oversee implementation of training programme for scientific, technical and complementary skills; Co-ordination of the network-wide training activities; Monitor/evaluate overall progress of research training program; Management Committee (At least twice per year) Overall management of research programme; Implement training activities with associated partners; Management & follow-up progress of the individual projects; Organization network-wide training (courses, workshops, etc); Overview integration of Researchers into research team(s); Review of the Personal Career Development Plans; Dissemination of best practice and project results. Sharing information Use of SharePoint tool ( ) Deliverables 1. Annual S&T and management/financial reports 2. Prepare workshops & training events Supervisory Board (coordinator +MCSC chair +HR) Assoc. partners invited Management Committee Coordinator Work Package Leaders (Assoc partners invited) Administrative unit CERN HR and FI Departments Selection Committee

Mid Term Review Meeting, 26 September Co-ordinator’s Report List of Participants

Mid Term Review Meeting, 26 September Co-ordinator’s Report New Associated Partners

Mid Term Review Meeting, 26 September Co-ordinator’s Report Outline  The ISOLDE Facility and it’s upgrade: HIE-ISOLDE  CATHI and HIE-ISOLDE  Scientific Overview  Networking  Administrative & Management Issues  Conclusions and Prospects

Mid Term Review Meeting, 26 September Co-ordinator’s Report Recruitment of Fellows: Time plan

Mid Term Review Meeting, 26 September Co-ordinator’s Report Administrative & Management Issues There are no deviations from the original contract In the process of re-scheduling the secondment period (new partners, late recruitment, etc…) Given the difficulty in recruiting ER1, task was covered by CERN staff => we may consider re-orienting ER1 future candidate on cavity and cryomodule test 3 ESRs enrolled on a PhD programme. More information will be provided by Seamus Hegarty next…

Mid Term Review Meeting, 26 September Co-ordinator’s Report Conclusions The presence of the CATHI fellows is paramount for the HIE- ISOLDE project: Replace missing staff deployed on other high-priority projects (LS1, LHC Upgrade, L4, LIU, etc…) Represent 1/3 rd of the total manpower of the project and almost 2/3 rd in the case of the Design Study ! Help establish or re-inforce existing collaborations Keep up with the pace – maintain this good spirit and teamwork

Mid Term Review Meeting, 26 September Thank you very much for your attention HIE-ISOLDE web site -> CATHI-ITN web site ->