NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at 757-824-7450 or 7451 Contact Phil Whaley at (757) 824-7331 or Al McMath at.

Slides:



Advertisements
Similar presentations
Complete Ground Station Monitor & Control Solutions.
Advertisements

DADDS DCS LRIT Prototype LRIT Latency Results Presented by Microcom Design, Inc. May 2014.
NWS Use of Direct Broadcast Geostationary Weather Satellite Data
Spacecraft Constellation GOES-12 scheduled for de-commissioning in Dec 2013 –GOES-12 still supporting South American mission –GOES-12 DCS is turned on.
Managing Your Network Environment © 2004 Cisco Systems, Inc. All rights reserved. Managing Cisco IOS Devices INTRO v2.0—9-1.
GOES Direct Services. Topics  Direct Broadcast Services  GOES Data Collection Services  Search and Rescue.
NOAA COMMAND AND DATA ACQUISITION STATION
GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting Atlanta, Georgia January 20, 2010 Vanessa Griffin Project Manager,
Himawari-8 Project Plans and Status. Background 2 NESDIS is implementing a capability to ingest Advanced Himawari Imager data from JMA, process and generate.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 8: Implementing and Managing Printers.
Operational Dataset Update Functionality Included in the NCAR Research Data Archive Management System 1 Zaihua Ji Doug Schuster Steven Worley Computational.
Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility.
DCS Alternate Data Distribution System (DADDS) Database Development Status Presentation to the STIWG/TWG July 9, 2008.
Hands-On Microsoft Windows Server 2008 Chapter 8 Managing Windows Server 2008 Network Services.
1 GOES DCS Status and Information Dan Schwitalla – th Meeting of the STIWG– 18 – 20 May 2009.
1 EDDN Status and Information Dan Schwitalla – 2009 USGS STIWG/TWG – 6-8 May 2014.
GOES-8 to GOES-12 Transition Direct Readout Conference Cindy Hampton NESDIS/Office of Satellite Operations.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451 – 24 Hours/ 7 Days a Week  Al McMath at (757)
Robin Pfister (GOES-R Ground Segment Deputy Project Manager)
Coordination Group for Meteorological Satellites - CGMS NOAA Response to Action Presented to CGMS-41 plenary session.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
LRGS Enhancements for LRIT NOAA TWG Meeting May 12, 2011 Sutron Corporation Davis Drive, Sterling VA Tel: (703)
Fundamentals Pages 1 to 19 in your workbook. A Tour of VTScada WEB – Script based, using its own programming language VTS – Visual Tag System. Added a.
SSEC Data Center Data 2010 MUG Meeting Jerrold Robaidek.
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 2, 2012.
Upcoming Frequency Topics: Future GOES-R Concerns
Kay Metcalf NOAA GOES DCS Program Manager Office of Satellite Data Processing and Distribution NOAA’s Satellite and Information Service GOES DCS: NOAA.
Ilya Slutsker Data Base Development, Processing and Data Archive Data Collection Archives Processing Data Access Delivery and Distribution.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or is with copies to
LRIT Testing at NOAA/CO-OPS STIWG Oct CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES CO-OPS operates a DOMSAT system at its two regional.
Support for GOES Data Collection System Presentation to the Advisory Committee on Water Information by Charles Kazimir, Chairperson of the Satellite Telemetry.
DCS Interference Issues Backup Pilot Interference The 00-06z Problem Presented by Microcom Design, Inc. May 2012.
Module 7: Resolving NetBIOS Names by Using Windows Internet Name Service (WINS)
A Proposal to Update LRIT to Provide Reliable Rebroadcast Tool for GOES DCS Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
DEC.10,20061 Santos Rodriguez, NWS EMWIN CURRENT EMWIN OVERVIEW.
2 DCS MANAGEMENT ACTIVITIES UPDATES ON ALL OUR ONGOING PROJECTS OTHER INFORMATION HELPFUL TO USERS ALL ITEMS MAY BE CONSIDERED WORKS IN PROGRESS QUESTIONS.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451  Contact Phil Whaley at (757) or Al McMath.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG April 2008 Meudon, France.
EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group for Meteorological Satellites - CGMS EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group.
NOAA Satellite and Information Service: Dissemination Systems Update George Jungbluth Senior International Relations Specialist NOAA Satellite and Information.
LRIT Project Status Update STIWG/TWG, Boise, ID Mark Bushnell NOAA/NOS/CO-OPS May 02, 2012 Definitions LRIT – Low Rate Information Transmission LRGS –
© 2009 Cisco Systems, Inc. All rights reserved. ROUTE v1.0—1-1 Planning Routing Services Creating an Implementation Plan and Documenting the Implementation.
NOAA Satellite Direct Readout Conference Welcome! – to the 2011 NOAA Direct Readout Conference! Kathleen Kelly Director, Office of Satellite Products and.
Geostationary Operational Environmental Satellite (GOES) User’s Conference Current Status of the NOAA GOES Direct Services Paul Seymour – Broadcast Services.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
GOES Data Collection System Status of Version II Transmitter Implementation Information Brief for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG November 2007 Pasadena, California.
DADDS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 6, 2014.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager November 17, 2010.
GOES Program Review Satellite Direct Readout Conference for the Americas Miami, Florida December 9, 2002 Gerald Dittberner Advanced Systems Planning.
Agency, version?, Date 2012 Coordination Group for Meteorological Satellites - CGMS Add CGMS agency logo here (in the slide master) Coordination Group.
DADDS New Features Tuesday, May 3, 2016Sioux Falls, SD Letecia Reeves, GOES DCS Customer Service Specialist NOAA/NESDIS/OSPO/SPSD.
© 2014 VMware Inc. All rights reserved. Cloud Archive for vCloud ® Air™ High-level Overview August, 2015 Date.
Run the on your PC to start the firmware configuration process Run IP Config Tool.
GOES-R Product Distribution Logistics Before and After Handover Kathryn Miretzky GOES-R User Services Coordinator Product Readiness and Operations (PRO)
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) DECEMBER 5, 2008.
Page No. 1 Overview Kelvin Nichols Payload Operations and Integration Center EO50 SSCN Delay Tolerant Networking (DTN)
Jan 2016 Solar Lunar Data.
Satellite Information Flow
Pilot Watcher Product Overview V5.3
NOAA Report on the Status and Future Plans for GEONETCast Americas Presented to CGMS-43 Working Group IV session, agenda item 3.
Military & Government Affairs Panel Harbor Ballroom G-I Tuesday, October 20th 1:30pm – 3:30pm.
Agenda About Screenpeaks The technology Content interfaces.
Operational Dataset Update Functionality Included in the NCAR Research Data Archive Management System Zaihua Ji Doug Schuster Steven Worley Computational.
DCS Alternate Data Distribution System (DADDS)
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
GOES DCS Customer Interaction/Access Training
Overview Multimedia: The Role of WINS in the Network Infrastructure
Designing Database Solutions for SQL Server
Presentation transcript:

NOAA COMMAND AND DATA ACQUISITION STATION

WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at (757) Travis Thornton

Wallops LRGS Configuration No real changes to the LRGS We continue to use version 7.0 as the standard The cdadata server is considered the primary LRGS, ingesting data from the DCS demods & the cdabackup server. The cdabackup server is considered the secondary LRGS, ingesting data from the DCS demods & the EDDN server. The drot should be considered a troubleshooting tool to verify the DOMSAT downlink. Accounts are built through NOAA and shared with USGS Wallops LRGS interface with those at NSOF and EDDN to maintain a complete record.

Wallops LRGS Configuration Analysis by Microcom showed that EDDN and NSOF were receiving 99.5% of the data that is received at Wallops. No real changes to the LRGS configuration since the last meeting Sites and IPs: – ( ) – ( ) – ( )

LRIT Status Files built and transmitted every 30 seconds Wallops is working with OSDPD to use the backup at Wallops during periods of outages. The OSDPD failover would be manual – not automatic The DCS component of LRIT is transferred from Wallops to Suitland (via Internet) and then back to Wallops (via T-1). 1 meter antenna receives full LRIT stream There are no re-occurring costs associated with LRIT reception. Available throughout the hemisphere at no charge.

Spacecraft Constellation GOES-10 de-commissioned in Dec 2009 GOES-13 is prime East 75 deg West GOES-11 is prime West 135 deg West –We did not have to use GOES-13 for DCS/LRIT/EMWIN during recent eclipse events. –GOES-11 has only one functioning command receiver –Currently scheduled for decommissioning - Dec 2011 –Replacement s/c is TBD (GOES-14 or 15???) GOES-12 supporting the South 60 deg West GOES-12 is scheduled for de-commissioning in Dec 2013 No decision on supporting South America after Dec 2013

Spacecraft Constellation GOES-14 is in storage but we are using the SXI 105 deg West GOES-15 is in 89.5 deg West

Wallops Backup A second pilot remains active (channel 0) at the WBU. The frequency is 401.7MHz. LRIT and EMWIN equipment is at WBU & FCDAS still waiting for connectivity to OSDPD – multicast issue.

DAPS/DADDS DADDS on-line since Jan IT Security Certification and Accreditation completed on Mar –We have a 3 year Authority To Operate –This includes the WCDAS and the NSOF Three test transmitters Apr Six units for three antennas. One unit serves as the pilot transmitter. NWSTG TCP/IP Testing currently underway. Pilot/DCPC receive antennas installation delayed. WCDAS site is still being determined.

DOMSAT Status DCS moved from AMC 4 to SES 1 – 9 Jul 2011 Downlink moved from transponder 6 to transponder 14 of satellite SES 1 – 1 Nov 2011 –The new frequency is MHz. The current contract with SES World Skies, formerly Americom Government Services (AGS), expires September 2011 (Option period-9).

DOMSAT Status DCS operations will be failed-over to the backup site at NSOF starting on May 16. This is being done to support the reconfiguration of the Wallops SES equipment.

DOMSAT Service Current DOMSAT services expire on 31 Aug 2011.