HES-HKS & KaoS meeting 21/Oct/2011 Toshi Gogami 11/Mar/2010, E05-115 End-Run Party at Kappo Nara, Newport News, US.

Slides:



Advertisements
Similar presentations
24-Apr-15S.Movchan Straw prototype beam test into the NA48 infrastructure 1 Goals: test of straw prototype wires positioning straw bending check grounding.
Advertisements

Tracking for high multiplicity event (E05-115) & E GEANT4 simulation 14/Dec/2011 School of science, Tohoku University Toshiyuki Gogami ( 後神 利志 )
Simulation of the RPC Response José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
Spectroscopic Investigation of  Hypernuclei in the Wide Mass Region by the (e,e’K + ) Reaction Chunhua Chen Hampton University Nov.6,2010/DNP.
Lambda hypernuclear spectroscopy up to medium heavy mass number at JLab Hall-C Graduate school of Science, Tohoku Univ. Toshiyuki Gogami.
Zhihong Ye Hampton University Feb. 16 th 2010, APS Meeting, Washington DC Data Analysis Strategy to Obtain High Precision Missing Mass Spectra For E
HES-HKS & KaoS meeting Toshi Gogami 5/June/2012 Hall-C.
6/1/2010 T.Gogami.  chi-square (rev.415)  number of event ratio  multiplicity vs. chi-square  52 Cr  CH 2 target  multiplicity vs. MM for 52 Cr.
Report of the NTPC Test Experiment in 2007Sep and Others Yohei Nakatsugawa.
Medium heavy Λ hyper nuclear spectroscopic experiment by the (e,e’K + ) reaction Graduate school of science, Tohoku University Toshiyuki Gogami for HES-HKS.
TWIST Measuring the Space-Time Structure of Muon Decay Carl Gagliardi Texas A&M University TWIST Collaboration Physics of TWIST Introduction to the Experiment.
GlueX Particle Identification Ryan Mitchell Indiana University Detector Review, October 2004.
Lambda hypernuclear spectroscopy at JLab Hall-C Graduate School of Science, Tohoku University Toshiyuki Gogami for the HES-HKS collaboration 1.Introduction.
HLAB meeting 25 Jan 2011 T.Gogami E experimental setup in JLab Hall C (2009)
HKS Analysis Status Report HKS Analysis Status Report Liguang Tang (Hampton/JLAB) Hall C User Meeting, Jan. 15, 2011 HKS has data taken in 2005 (E01-011)
HES-HKS & KaoS meeting 2Apr2012 T.Gogami SURA residence facility.
MdcPatRec Tracking Status Zhang Yao, Zhang Xueyao Shandong University.
HES-HKS & KaoS meeting Toshi Gogami 18/Oct/2012. HYP2012 at Barcelona, Spain 10/1 – 10/5 HYP /5 – 10/6 JSPS Core-to-Core symposium 10/9 came back.
Analysis strategy of high multiplicity data Toshiyuki Gogami 24/Feb/2011.
Status of TPC experiment ---- Online & Offline M. Niiyama H. Fujimura D.S. Ahn W.C. Chang.
TOF for New-TPC experiment 1.Time-of-Flight 2.Missing mass of single-K +, proton 3.New-DC Mizuki Sumihama May, 2 nd, 2008.
Material budget, energy losses and multiple scattering.
TWIST A Precision Measurement of Muon Decay at TRIUMF Peter Kitching TRIUMF/University of Alberta TWIST Collaboration Physics of TWIST Introduction to.
JLab hypernuclear collaboration meeting / JSPS Core to Core Seminar Study of elementary process in Hall-C p(γ*,eK + )Λ/Σ 0 9May2012 – 11May2012 Department.
HADES coll. meeting, Oct. 31, 2007 Charged pion production in C+C at 1 and 2 A GeV results of data analysis from experiments NOV02 and AUG04 Jehad Mousa.
Experience With CBM Muon Simulation Partha Pratim Bhaduri.
HES-HKS & KaoS meeting Toshi Gogami. Contents Energy loss simulation by HES,HKS and POSI 1.POSI for beam energy loss – Harver foil is already implemented.
HES HKS meeting 13 Dec 2010 T.Gogami. Contents Event display for HKS – HKSdetectors – KDC – KDC1 – KDC2 – KDC_2d.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
HES-HKS & KaoS meeting Toshi Gogami 26June June2013.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
JLab hypernuclear collaboration meeting / JSPS Core to Core Seminar Analysis Status of Heavy targets data of HES-HKS 9May2012 – 11May2012 Department of.
A search for strange tribaryonic states in the reaction Heejoong Yim Seoul National University For KEK-PS E549 collaboration.
JLab における (e,e'K + ) 反応を用い た 精密ラムダハイパー核分光実験 東北大学理学研究科 後神 利志 Toshiyuki Gogami Strangeness 2010 at KEK JLab Hall-C.
HES HKS collaboration meeting 3/11/2010 T.Gogami.
Λ hypernuclear spectroscopic experiment via (e,e’K + ) at JLab Graduate school of science, Tohoku Univ. Toshiyuki Gogami JLab Hall-C in May 2009.
Analysis strategy of high multiplicity data Toshiyuki Gogami 24/Feb/2011.
HES HKS meeting 24 Sep 2010 Toshiyuki Gogami 9/4/2010 in Prague, Czech.
HES-HKS & KaoS meeting 15/July/2011 T.Gogami Wiesbaden のお風呂はこんな感じでし た.
1 DT Local Reconstruction on CRAFT data Plots for approval CMS- Run meeting, 26/6/09 U.Gasparini, INFN & Univ.Padova on behalf of DT community [ n.b.:
HES-HKS & KaoS meeting Toshi Gogami 11/July/2012.
KalFitAlg: recent developments and tests WANG Dayong Jan.18,2006.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
FNAL beam test simulation with Geant Aiwu Zhang Florida Tech
T585 analysis status /2/2 HIDEYUKI SAKAMOTO Contents On small light yield problem checked by Aron’s information Tracking status Transverse and Longitudinal.
Current Status of MDC Track Reconstruction MdcPatRec Zhang Yao, Zhang Xueyao
HES HKS meeting 15/June/2011 T.Gogami. Contents HKS tracking efficiency Tracking residual Λ/Σ 0 issue (CH 2 /H 2 O)
Status report - Tracking code - T.Gogami 9/30/2010.
HLAB meeting status report Toshiyuki Gogami 3Sep2013.
HES-HKS & KaoS meeting 24/Feb/2014 Toshi Gogami. Contents 12 Λ B cross section Comparison with Motoba-san’s calculation Acceptance Linearity after matrix.
HES-HKS & KaoS meeting 30July2013 Toshi Gogami. Contents Λ の減少 (H の減少 )
HES HKS meeting 1 Nov 2010 T.Gogami E experimental setup in JLab Hall C (2009)
Energy Loss Graduate School of Science, Tohoku University Toshi Gogami 22/May/2013.
Particle Tracking for CDC prototype Amangaliyev Temirlan.
Data vs MC … issues of the K +- group 1.Accidentals … contribution from Erika & Roberto 2.DC background.
7/13/2010 D1 T.Gogami JLab Hall-C. 1. about E Event display track – detectors track – chamber wire coordinate.
HKS collaboration 2008/5/16 Wedding Party 2008/5/10.
Hadron production in C+C at 2 A GeV measured by the HADES spectrometer Nov02 gen3 analysis and results for spline tracks (shown in Dubna) changes - removing.
HES-HKS analysis meeting 30 Aug 2013 Toshiyuki Gogami.
Track finding with g-2 silicon tracker 2 nd Workshop on Muon g-2 and EDM in the LHC Era May 5, 2012 Kazuki Ueno (RIKEN)
電子線を用いた中重ラムダハイパー核分光実験の為 の 高多重度用飛跡再現コードの開発 Department of Science, Tohoku University Toshiyuki Gogami ( 後神 利志 ) JPS 2011 autumn meeting, T.Gogami1 JLab E
HES-HKS & KaoS meeting 1/Mar/2012 Toshi Gogami. Contents TOSCA.
April12 DST calibration status
DT Local Reconstruction on CRAFT data
Alignment of the PHENIX Silicon Vertex Tracker (VTX) in 2014
E Collaboration Meeting Mar10-11, 2010
Study of non-uniformity of magnetic field
NKS2 Meeting with Bydzovsky NKS2 Experiment / Analysis Status
Contents First section: pion and proton misidentification probabilities as Loose or Tight Muons. Measurements using Jet-triggered data (from run).
SIDIS Rates and Projection for SoLID with CLEO (&CDF)
Presentation transcript:

HES-HKS & KaoS meeting 21/Oct/2011 Toshi Gogami 11/Mar/2010, E End-Run Party at Kappo Nara, Newport News, US

Contents KDC x-t function correction (H 2 O) Momentum dependence of HKS tracking eff. About discarded events

x-t func. calibration (H 2 O, HKS side) DBASE/ – E05115.datbase, e05115.param.* E05115repaly/ PARAM/ – hdriftmap.param.*

x-t func. calibration (H 2 O, HKS side) Number of runs = 157 (H 2 O) – hdriftmap.param (125 runs, ) (3 runs, ) (29 runs, ) RUNParam 1Param 2 Need to check that these parameters are not used for other targets

Rates of the KDC wires 52 Cr, Wire Number Rate [kHz] KDC1-u KDC1-u’KDC1-xKDC1-x’KDC1-vKDC1-v’ KDC2-u KDC2-u’KDC2-xKDC2-x’KDC2-vKDC2-v’ < 510 kHz < 350 kHz < 290 kHz < 230 kHz 52 Cr, KDC1 KDC2 ~11 MHz ~22 MHz ( 52 Cr target ) 5 × 5

Momentum dependence of the HKS tracking efficiency HKS single analysis Kaon – hwatnkn1+hwatnkn2>1.0 – haernpe1+haernpe2+haernp e3<5.0 – 0.0<hmsq && hmsq<0.5 Pion and positron – hwatnkn1+hwatnkn2>1.0 – haernpe1+haernpe2+haernp e3>10.0 – -0.5<hmsq && hmsq<0.5 Proton – hwatnkn1+hwatnkn2 0.0 – haernpe1+haernpe2+haernp e3<5.0 – 0.6<hmsq && hmsq<1.2 Momentum distribution of HKS (HKS single) CH 2, (200,000 events)

Momentum dependence of the HKS tracking efficiency Tracking eff [%] Region1Region2Region3Region4 CH 2, (200,000 events) Note : 52 Cr, No big difference in my code. Bug Tracking code itself (5/6 × 5/6)

HKS Event disp. Black : hit wires Blue : Selected wires Res : Tracks KDC1 (RUN 77124)

Data pickup for HKS event display Trans_scin Trans_dc Track Select_good_track Link_tracks H_physics Total hit in KDC Hit layer and wire Multiplicity for each layer Etc. Number of tracks x,xp,y,yp at reference plane Selected wires Layer residual, chi2 Momentum KTOF,AC,WC ntuple start data

Select data EMACS start ・・・・ data start ・・・ start ・・・・ data ・・・ Select start ・・・・ data start ・・・・ data start ・・・・ data ・・・・ For detail 

Select data EMACS start ・・・・ data start ・・・ start ・・・・ data ・・・ Select start ・・・・ data start ・・・・ data start ・・・・ data ・・・・ CH 2 (76314) Track : 26.8% 52 Cr(77124) Track : 3.6% ***_trash.dat Hit on the two chambers Required number of hit wires Tracking χ 2 ・・・

Events which are discarded CH 2, KDC1 KDC2

Events which are discarded 52 Cr, KDC1 KDC2

Events which are discarded 52 Cr, KDC1 KDC2 Where and why are these events discard ? Are these events threw away with correct cut condition? Where and why are these events discard ? Are these events threw away with correct cut condition?

Summary and To do Summary – KDC x-t function correction (H 2 O) Check parameter file which need to be corrected. – Momentum dependence of HKS tracking eff. Could see no difference between low and high mom. – Check bugs of my code – Is this just caused by tracking code itself (5/6 x 5/6) ? – About discarded events Need to be checked that – Where and why these events are threw away – Cut condition is correct To do – E Enge GEANT – E Momentum dependence of the HKS tracking efficiency HKS b.g. rate study by GEANT simulation Miss identification efficiency estimation by Doi code

END 12/Oct/2011, 駐車場より

x distribution of HKS RP HKS single analysis Kaon – hwatnkn1+hwatnkn2>1.0 – haernpe1+haernpe2+haernp e3<5.0 – 0.0<hmsq && hmsq<0.5 Pion and positron – hwatnkn1+hwatnkn2>1.0 – haernpe1+haernpe2+haernp e3>10.0 – -0.5<hmsq && hmsq<0.5 Proton – hwatnkn1+hwatnkn2 0.0 – haernpe1+haernpe2+haernp e3<5.0 – 0.6<hmsq && hmsq<1.2 x distribution of HKS Reference Plane (HKS single) CH 2, (200,000 events)

X distribution at HKS RP CH 2, (200,000 events)

Abs(WC – TC) |Wire center – Track coordinate| s 0 Wire center Track coordinate Black : |WC-TC| Magenta : Profile of |WC-TC| Green : x-t calc. Track Drift distance Fitting Function

x-t calibration for 52 Cr Target Residual better – KDC1 ; 400 [μm]  300 [μm] Number up – 10% increased at χ 2 <20

x-t calibration for H 2 O Target Residual better Number up – 10% increased at χ 2 <20

Tracking residuals of 12 C target High Current (Run:75967) Low Current (Run:76051) There are room to be improved maybe.