WF on UE capability signaling for FD-MIMO Class B LG Electronics, Intel Coorporation, NTT DOCOMO, Qualcomm 3GPP TSG RAN WG1 Meeting #84 R1-161495 St Julian’s,

Slides:



Advertisements
Similar presentations
Way forward for LTE DL 4Rx AP SI on RF
Advertisements

Way Forward Proposals for Inter-band CA Consisting of B41
WF on design of physical downlink control channel for MTC CATT, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, ETRI, InterDigital, MediaTek, NTT.
WF on PBCH Coverage Enhancement
Way forward on eIMTA signaling to support up to 32 component carriers
3GPP TSG RAN WG1 # R1-15xxxx Fukuoka, Japan 25th – 29th May 2015
Summarizing baseline results Nokia Networks 3GPP TSG RAN WG1 Meeting #81R Fukuoka, Japan, 25 th – 29 th May 2015 Agenda Item:
WF on BS MMSE-IRC receiver
WF on CQI Table for eMTC ZTE, Sony, Nokia, Ericsson, Samsung… R GPP TSG RAN WG1 #83 Anaheim, USA, 15th – 22nd November, 2015 Agenda item
WF on Support of EBF/FD-MIMO Features in TM9
Way forward to NB-IoT 3GPP TSG RAN WG1 #83 R1-157xxx
Proposal for NB-IoT single-tone only UE
Way forward on RAN2 aspects of multiple PRB operations
WF on MCOT limit Signaling and Modifying LBT type Ericsson, … 3GPP TSG RAN WG1 #85 R1-16xxxx Nanjing, China 23 rd – 27 th May 2016 Agenda item:
WF on Supporting different Numerologies in a NR carrier LG Electronics, [Huawei, HiSilicon, Panasonic], 3GPP TSG RAN WG1 Meeting #85R Nanjing,
Way Forward on NR UE Testability Intel Corporation, CATR 3GPP TSG-RAN WG4 Meeting #80bis R Ljubljana, Slovenia, August, 2016.
Overview of open issues in
Offline discussion on remaining details on RRM measurements
WF on Bandwidth Part for DL common channel
WF on RA-RNTI design 3GPP TSG RAN WG1 Meeting NR#3 R1-171xxxx
Way Forward on UE measurement definition and capability
Summary of SLS for RRM NTT DOCOMO
Offline Discussion on remaining details about RACH Procedure
WF on UL Transmission for Difficult Band Combinations in LTE-NR DC
Draft WF on single Tx switched UL
Single Tx switched UL DRAFT 3GPP RAN #77 September , 2017
3GPP TSG-RAN WG4 Meeting #84bis
R GPP TSG RAN WG1 Meeting #90 Prague, P.R. Czechia, 21st – 25th August 2017 Agenda: WF.
Initial workplan on NR spectrum
WF on NPUSCH scrambling for Rel-14 NB-IoT
WF on NR spectrum NTT DOCOMO, INC. R
WF on pre-DFT PT-RS pattern for DFTsOFDM
Summary of proposals on CBG-based retransmission
WF on single Tx switched UL
RACH configuration ZTE, Sanechips R1-171xxxx
Proposals on remaining issues on search space
Single Tx switched UL Qualcomm, Intel DRAFT RP GPP RAN #77
WF on Beam Indication for Beam Management
WF on NB-IoT Radio Link Monitoring Performance Test Procedure
WF on measurement capability and measurement gap for NR
Way forward on UE EIS Spherical Coverage and Beam Correspondence
3GPP TSG RAN WG1 Meeting #90bis
R : SRS Enhancements for LTE-A
WF on spherical coverage in FR2
WF on remaining open items for allowing 1Tx transmission in LTE-NR DC
WF on Beam failure recovery
WF on SS Block Index Reporting through RACH Procedure
Way forward on cell identification in NR
Intel Corporation, Apple
Proposal for defining requirement of LTE BHH TRP/TRS
Way forward on DL ACLR&ACS for WP5D LS
Samsung, KT Corp., NTT DOCOMO, Verizon, [ZTE], [CATT], [Intel]
WF on beam reporting CATT, Intel R1-17xxxxx
WF on Beam-Related Indication
WF on CSI timing offset for PUSCH
WF on Radio Link Monitoring in NR
WF on NAICS Receiver Terminology
Motorola Mobility, Lenovo, …
WF on UE mandatory channel bandwidth for NR bands
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
Way Forward on Coexistence Evaluation Methodologies for LAA
WF on LTE-NR DC with UL coexistence
WF on 4Tx UL Codebook For CP-OFDM
Summary of Offline Discussion on RMSI CORESET Configuration (Part 2)
WF on UL Beam Management
WF on UL Beam Management
WF on CB-group based retransmission
WF on Phase discontinuity issue in intra-band EN-DC with 1-PA
on the overall 5G-NR eMBB workplan
Presentation transcript:

WF on UE capability signaling for FD-MIMO Class B LG Electronics, Intel Coorporation, NTT DOCOMO, Qualcomm 3GPP TSG RAN WG1 Meeting #84 R St Julian’s, Malta, 15 th - 19 th February 2016 Agenda item: 7.1.4

Background Notations – P: existing max supported number of CSI processes per band per band combination – Kmax: max supported number of NZP CSI-RS resources within a CSI process – Nmax: max supported total number of NZP CSI-RS ports within a CSI process Feature group 4-2 on Class B CSI reporting is being discussed with separated parameters (supported Kmax and Nmax) for UE capability signaling as follows: It was observed, during the discussion, companies prefer to have UE capability signaling as much flexible as possible, which is jointly determined by Kmax, Nmax, and P(=1, 3, or 4).

Proposal For UE capability signaling on Class B CSI reporting, UE reports Kmax(=1,2,…,8) as well as 4 independent values of Nmax1, Nmax2, Nmax3, and Nmax4, per CSI process per band per band combination, as follows: – Nmax1 (=2,4,8) for K=1 configured for a CSI process – Nmax2 (= 4, 8, 16) for K=2 or 3 configured for a CSI process – Nmax3 (= 4, 8, 16, 32) for K=4, 5, 6, or 7 configured for a CSI process – Nmax4 (= 8, 16, 32, 64) for K=8 configured for a CSI process Note that: – Nmax = 0 (for a given K) means the UE does not support the associated K value(s) for the CSI process – If P = 1 for a band per band combination, the above Kmax, Nmax1, Nmax2, Nmax3, and Nmax4 are signalled once. – If P = 3 for a band per band combination, the above Kmax, Nmax1, Nmax2, Nmax3, and Nmax4 are independently signalled three times. – If P = 4 for a band per band combination, the above Kmax, Nmax1, Nmax2, Nmax3, and Nmax4 are independently signalled four times. – RRC signaling details are up to RAN2, based on following this proposal.