A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

ISOLDE WS 2007 Results with ISCOOL a new Radio Frequency Quadrupole Cooler and Buncher at ISOLDE P. Delahaye, H. Frånberg, AB-OP-PSB, ISCOOL, COLLAPS,
Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, July 6, 2011 Beam requests and schedule 2011 Experimental statistics.
ISOLDE Yield Database Development
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
Radioactive Ion Beam (RIB) Production at ISOLDE by the Laser Ion Source and Trap (LIST) Sven Richter for the LIST-, RILIS- and ISOLDE IS456 Collaborations.
ISCC 24 May 2004L.M. Fraile L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report ISOLDE Collaboration Committee 24 th May 2004 ISOLDE scientific.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Mats Lindroos INTC Agenda 09:00 Introduction by the Chairman, J. Äystö 09:05 Report by the ISOLDE Technical Coordinator, M. Lindroos 09:25 Report by the.
Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.
K. Riisager, TA8 ISOLDEEURONS PCC-Meeting, Mainz (Germany), April 2006 Recent highlights from ISOLDE News from the facility –Users meeting, February.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE.
24 January 2001J. Lettry1 ISOLDE Introduction –PSB-beam, Targets –Ion-sources Facility performance –Front-ends and robots –Target production –Safety.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Mats Lindroos ISOLDE Technical report INTC 14/2/2007 Mats Lindroos.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report INTC meeting, 15 February 2007 ISOLDE scientific coordinator’s report INTC meeting, 15 February.
RILIS: new advances and future prospects V. Fedosseev for ISCC meeting 10 November 2015.
ISOLDE at the turn of the millennium* Juha Äystö Helsinki Institute of Physics Helsinki, Finland * As seen by the ISOLDE Physics Group.
ISOLDE Physics Coordinator Report Schedule Access to the hall Visits b275 and b508 Magdalena Kowalska.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team.
Technical report for ISOLDE INTC 19 May 2007 Mats Lindroos.
Scheduling News. Magdalena Kowalska. Injector schedule since last meeting 2 Confirmation of 2 week proton prolongation – until December 17 th : 35 ->
Trends in Heavy Ion Physics Research, Dubna, May Present and future physics possibilities at ISOLDE Karsten Riisager PH Department, CERN
ISOLDE Technical Report Richard Catherall ISOLDE Technical Coordinator 50 th INTC meeting 1 st July 2015.
ISOLDE Physics Report Magdalena Kowalska. Injector schedule since last meeting 2 September: confirmation of 2 more weeks with protons – until December.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Last years of the SC-ISOLDE and move to the PS-booster H. Haas CICECO, Universidade de Aveiro, Aveiro, Portugal and CERN/PH-IS, CH-1211 Geneve-23,
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users New template Safety Long shutdown PH and ENSAR news Magdalena Kowalska Yorick Blumenfeld.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
LIST status and outlook Sven Richter for the LIST-, RILIS- and Target-Collaborations 21 st of August 2013.
Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, November 4, 2010 Running period 2010 Status of INTC shifts Accelerator.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Nuclear structure research at ISOLTRAP 17th of November 2008 Dennis Neidherr University of Mainz Outline:  Motivation for our measurements  Xe/Rn results.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Richard Catherall EN-STI CERN, 3 rd November 2011 ISOLDE Technical Report for the INTC.
Nuclear physics: the ISOLDE facility Magdalena Kowalska CERN, PH-Dept. on behalf of the CERN ISOLDE team Lecture 2:
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, February 11, 2008 ISOLDE scientific coordinator’s report INTC meeting, February.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Schedule Access to the hall b508. Magdalena Kowalska.
Proposal to the INTC, 21. May 2007
Installation of an Instrument on a CERN machine
Beam developments in 2011 Target and Ion Source Development (TISD) Thierry Stora, EN-STI-RBS With input from many different colleagues.
A “standard” ISOLDE target: ThO2-184, n-rich Cu
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users
Alexander Herlert, CERN (PH-SME-IS)
Difficult beams accepted in 2014 (updated since last meeting)
A. Herlert, CERN PH-SME-IS
V. Fedosseev, R. Losito AB/ATB/LPE ISCC, 31/10/2005
Magdalena Kowalska, CERN PH-SME-IS
Scheduling News . Magdalena Kowalska.
Magdalena Kowalska, CERN PH-SME-IS
A. Herlert, CERN PH-SME-IS
Thomas Nilsson, CERN EP/IS
Magdalena Kowalska, CERN PH-SME-IS
Present and Future test facilities for High-intensity Targetry CERN
Mats Lindroos for The ISOLDE team
Coordinator’s report . Magdalena Kowalska.
Thomas Nilsson, CERN EP/IS
High-precision mass measurements of exotic nuclides:
INTC matters . Magdalena Kowalska.
Magdalena Kowalska, CERN PH-SME-IS
A. Herlert, CERN PH-SME-IS
Alexander Herlert, CERN (PH-SME-IS)
Presentation transcript:

A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 Schedule 2008 ISOLDE Startup 2008

INTC May 19, 2008 A. Herlert Accelerator schedule 2008 ISOLDE dates: protons from PSB May 5 physics start ISOLDE May 9 protons stop November 12 (i.e. 27 weeks for physics) Expected frequent changes of supercycles (as 2007) Several long periods of MD without protons to ISOLDE (delivery of p not guaranteed) Approved by CERN Research Board November 28, 2007

INTC May 19, 2008 A. Herlert ISOLDE experiments Active experiments with 470 shifts in total INTC meeting February Beam requests 5 experiments closed 9 new experiments and additional shifts for existing experiments 67 active experiments with about 700 shifts

INTC May 19, 2008 A. Herlert ISOLDE beam requests 2008 Limits in key resources RILIS (installation of new solid state lasers, max 2000 h operation) UC x targets (about 10 new units maximum) REX operation MINIBALL ready for Physics June 1 Schedule: 470 RIB shifts left after 2007 for approved experiments 231 RIB shifts from new proposals and addenda at February INTC meeting 2008 in total 701 RIB shifts for 2008 (and following years...) 551 RIB shifts requested compare to 480 RIB shifts requested in 2007 with 407 scheduled shifts requested RILIS shifts: > more than 2700 h operation requested RIB shifts with UC target: 410 (together with RILIS: 308)

INTC May 19, 2008 A. Herlert ISCOOL and new tapestation ISCOOL maintenance during shutdown 2007/2008 test in off-line period April 2008 permanently installed in 2008 running in transmission and bunch mode special setup time before each HRS run New tape station (IHPC Strasbourg): displacement time 100ms for 415mm to be installed in June 2008 at LA2 beam line

INTC May 19, 2008 A. Herlert ISOLDE schedule 2008 (first part) ISOLDE dates 2008: 2 weeks off-line period protons started May 5 physics started May 9 protons stop Nov weeks for physics 23 IS experiments 17 target units (3 old units) 9 UC x targets (2 old units) So far scheduled:

INTC May 19, 2008 A. Herlert ISOLDE off-line period 2008 (I) 2 weeks off-line period: GPS check new RILIS laser system (efficiency, operation, new scheme) IS449 off-line experiment at COLLAPS beam line (stable Be) New solid state pump laser working efficiency of Ga ionization compared with data obtained with copper-vapor-laser system check of Nd ionization scheme not possible, Nd mass marker not working (wrong position in ion source oven?) - another try later in the year IS449 test run successful preliminary data confirms offset of GPS and HRS high tension read-back value --> important for laser spectroscopy experiments setup installed and tested for on-line run (n-rich Be isotopes) vacuum intervention by H. Vestergard during long weekend

INTC May 19, 2008 A. Herlert ISOLDE off-line period 2008 (II) 2 weeks off-line period: HRS check ISCOOL after shutdown maintenance setup of REX (also for first on-line run) injection of molecular CO beam into REX-TRAP ISCOOL working checked transmission and bunching further optimization needed (dedicated period in schedule to test bunching and additional day to setup ISCOOL before each HRS on-line run) REX setup and injection of beam from ISCOOL various technical problems (REX-TRAP local ion source not working, discharges in REX-TRAP,...) - REX-LINAC and EBIS fine setup delayed due to longer cold check-out work and problems with the ISOLDE controls (CERN-wide problem) power cut on April 30 (just before long weekend)

INTC May 19, 2008 A. Herlert First on-line runs in 2008 (I) IS445: 9 C beam to 2nd beam line of REX-ISOLDE CaO/CP target as used in off-line period (idea to start setup of ISCOOL and REX-ISOLDE already in the off-line period) Very difficult beam (molecular beam, first time injection of beam from ISCOOL into REX-TRAP,...) lots of problems with REX-TRAP already in the off-line period Tremendous effort by technical group to get system running --> beam to the users almost on time - BIG THANKS FROM USERS! Again problems with controls (machine supervisors spent more time on debugging than tuning the system...) 10 C beam to the users, however with more than 5 times lower yield than in yield database (no time for retuning target) - 9 C beam not possible finally, target line broken (planned target test cancelled) Results no physics, but succesful test (CO beam through REX-ISOLDE) total efficiency of REX 4% (not fully opimized)

INTC May 19, 2008 A. Herlert First on-line runs in 2008 (II) TISD: YO target with MiniMono ion source (GPS) testing 72 Kr and CO beams successful run For the upcoming runs: need stable controls limitation of proton beam intensity on GPS: need results from thick target

INTC May 19, 2008 A. Herlert New solid state physics lab Building 115 Ready for operation in 2008 All equipment has been moved from building 275 to the new location (except lab G. Correia)

INTC May 19, 2008 A. Herlert Safety at ISOLDE New safety structure GLIMOS (Group Leader in Matters Of Safety) ISOLDE GLIMOS (ISOLDE Physics Coordinator) Deputy GLIMOS (ISOLDE Physics group leader) Nominating Installation Supervisors for larger experimental installations (ISOLTRAP, COLLAPS, NICOLE,...) Safety courses Basic safety course (mandatory) Laser safety course (will become mandatory ???) New Radioprotection course (Part I+II) to obtain dosimeter Special Radioprotection course (web-based course for ISOLDE) Cryogenics safety course (recommended) Bridge crane used restricted (new rules for access)