News and Status WLCG Information System Task Force Maria Alandes IT/SDC.

Slides:



Advertisements
Similar presentations
NANC Status Report Numbering Oversight Working Group (NOWG) November 5, 2003 Co-Chairs: Karen Mulberry, MCI Jim Castagna, Verizon.
Advertisements

Data Management TEG Status Dirk Duellmann & Brian Bockelman WLCG GDB, 9. Nov 2011.
Operations Coordination Team Maria Girone, CERN IT-ES GDB 10 th October 2012.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
1 Jerry Velasquez, Ph.D. Senior Regional Coordinator International Strategy for Disaster Reduction United Nations Secretariat in Asia Pacific.
Ian Bird LHCC Referee meeting 23 rd September 2014.
Budget Setting Process For 2015 Budget Draft 0.1 Member Forum Date of Meeting: 27th May 2014.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) July.
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
Bucharest, June 2002 Transfers Task Force Report Bucharest ICANN Meeting June 2002.
CIA Annual Meeting Assemblée annuelle de l’ICA June 29 & 30, Les 29 et 30 juin 2006 Ottawa, Ontario GEN 41 - A Brave New World – CPD for Actuaries.
Vertical Outreach Program Create story (presentation) – Identify the needs/challenges (beyond telecom- centric viewpoint) – What we are trying to do –
WLCG infrastructure monitoring proposal Pablo Saiz IT/SDC/MI 16 th August 2013.
Information System Status and Evolution Maria Alandes Pradillo, CERN CERN IT Department, Grid Technology Group GDB 13 th June 2012.
EMI INFSO-RI Guidelines and SQA Process Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
LCG Introduction John Gordon, STFC GDB December14 th 2011.
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
WLCG Planning Issues GDB June Harry Renshall, Jamie Shiers.
Procedure for proposed new Tier 1 sites Ian Bird WLCG Overview Board CERN, 9 th March 2012.
ECC Task Force Webinar November 13, Peak Anti-Trust Statement Meeting Minutes (June and Sept) Phase 1A Progress Phase 1A External Entity Testing.
Establishing Required Training for Washington State Employees.
LCG Introduction John Gordon, STFC GDB July8th 2009.
Report from GSSD Storage Workshop Flavia Donno CERN WLCG GDB 4 July 2007.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
Testing CernVM-FS scalability at RAL Tier1 Ian Collier RAL Tier1 Fabric Team WLCG GDB - September
WLCG Information System Use Cases Review WLCG Operations Coordination Meeting 18 th June 2015 Maria Alandes IT/SDC.
18-May-04D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Update (Report from the LCG Security Group) Barcelona 18 May 2004 David Kelsey CCLRC/RAL, UK
Next Steps after WLCG workshop Information System Task Force 11 th February
1 Status Update: TsunamiReady Improvement Plan Chris Maier TsunamiReady Program Manager NTHMP MES-EC January 31, 2011.
Feedback from CMS Andrew Lahiff STFC Rutherford Appleton Laboratory Contributions from Christoph Wissing, Bockjoo Kim, Alessandro Degano CernVM Users Workshop.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
WLCG Technical Evolution Group: Operations and Tools Maria Girone & Jeff Templon GDB 12 th October 2011, CERN.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
August 27, 1998Site report DESY Zeuthen1 DESY Zeuthen Status Report Wolfgang Friebel AFS news Installation management with sue+cfengine System watch with.
1 Status of the BCD GDE Area System Leaders Meeting (Jan.19-20, 2006) Nobu Toge (KEK)
Review of MGs involvement in SRA process MG meeting 24 th January 2007 Brussels.
WLCG Operations Coordination news and meeting restructuring Maria Alandes Pradillo Josep Flix Alessandra Forti Andrea Sciabà WLCG operations coordination.
WLCG Accounting Task Force Update Julia Andreeva CERN GDB, 8 th of June,
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI GLUE 2: Deployment and Validation Stephen Burke egi.eu EGI OMB March 26 th.
WLCG Information System Status Maria Alandes Pradillo, CERN CERN IT Department, Support for Distributed Computing Group GDB 9 th September 2015.
WLCG Operations Coordination report Maria Dimou Andrea Sciabà IT/SDC On behalf of the WLCG Operations Coordination team GDB 12 th November 2014.
G5/4 Revision Project Progress Update Andrew Bower
LHCbComputing Update of LHC experiments Computing & Software Models Selection of slides from last week’s GDB
Maria Alandes Pradillo, CERN Training on GLUE 2 information validation EGI Technical Forum September 2013.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
Operations Coordination Team Maria Girone, CERN IT-ES GDB, 11 July 2012.
REPORT TO EWG MEMBER (CORRESPONDENCE) Plan of Actions for (May) (June) (July) (August) (September)
WLCG Accounting Task Force Introduction Julia Andreeva CERN 9 th of June,
Availability of ALICE Grid resources in Germany Kilian Schwarz GSI Darmstadt ALICE Offline Week.
Jeremy Coles, STFC-RAL GDB April 4, 2007
EGI Operations Management Board
Supporting quality devices
perfSONAR-PS Deployment: Status/Plans
ARMA PM2.5 Testing & Emissions Rate Sampling
LHC Computing Grid Status of Resources Financial Plan and Sue Foffano
Proposal for obtaining installed capacity
ESB Networks AIP Programme
WLCG Accounting Task Force Update Julia Andreeva CERN WLCG Workshop 08
John Gordon, STFC GDB October 12th 2011
Market Trials ChMC 8th August 2018.
TGu Timeline Date: Authors: January 2005 January 2005
QSEC auction timetable
TGu Timeline Date: Authors: January 2005 January 2005
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
SACS Working Group Continual Commitment to Accreditation and Educational Improvement April 18, 2012.
Fiona Campbell, ISA 315 Task Force Chair & Deputy Chair of the IAASB
Presentation transcript:

News and Status WLCG Information System Task Force Maria Alandes IT/SDC

Task Tracking and Timeline 27th August 2015 WLCG Information System Evolution Task Force 2

Reminder: Use Case Document  7 th September, all input should be ready and sent to Maria  8 th September Maria distributes first complete draft to the TF  11 th September last day to give general feedback/comments  15 th September Use Case document presented at the MB 27th August 2015 WLCG Information System Evolution Task Force 3

GDB presentation 9 th September  Status of Information System to be presented at the next GDB 9 th September  Report about TF status  Report about IS status  Known issue with latest version of openldap  Any other suggestions?  Draft slides to be circulated next week 27th August 2015 WLCG Information System Evolution Task Force 4

MB presentation 15 th September  Information System Use Cases  Request T3 in REBUS  Request pledges per sites  Definition of Installed Capacities  Maria can propose a definition compiling feedback sent to the list so far   Draft slides to be circulated week before meeting 27th August 2015 WLCG Information System Evolution Task Force 5