February 28, 2011NF Report - Zisman1 Neutrino Factory Design Overview and IDS-NF Status Michael S. Zisman* Center for Beam Physics Accelerator & Fusion.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

September 23, 2005ISS Plenary Meeting - Zisman International Scoping Study Accelerator Working Group: Tasks and Plans Michael S. Zisman Center for Beam.
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
1 Neutrino Factory Front End (IDS) and Variations David Neuffer G. Prior, C. Rogers, P. Snopok, C. Yoshikawa, … August 2011 NuFACT99 -Lyon.
Gersende Prior (CERN) on behalf of the EUROnu and IDS-NF collaborations NUFACT’11 CERN & Geneva University 04 August 2011.
Bunched-Beam Phase Rotation- Variation and 0ptimization David Neuffer, A. Poklonskiy Fermilab.
1 RAL + Front End Studies International Design Study David Neuffer FNAL (January 5, 2009)
Μ-Capture, Energy Rotation, Cooling and High-pressure Cavities David Neuffer Fermilab.
Simulation Study Results Study: Replace LiH-based cooler with gas-filled transport and rf cavities Results: Beam Cooling is significantly improved. Final.
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
-Factory Front End Phase Rotation Optimization David Neuffer Fermilab Muons, Inc.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
FFAG Concepts and Studies David Neuffer Fermilab.
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
ABSTRACT The International Design Study for the Neutrino Factory (IDS- NF) baseline design 1 involves a complex chain of accelerators including a single-pass.
, WP1 Meeting, RAL J. Pasternak Status and Recent Progress in the Muon FFAG Designs for the NF J. Pasternak, Imperial College, London / RAL STFC.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
European design study on Neutrinofacilities - Euronu within FP7.
Muon Acceleration Plan David Kelliher ASTeC/STFC/RAL UKNF WP1, October 9 th, 2008.
Bunched-Beam Phase Rotation for a Neutrino Factory David Neuffer Fermilab.
Bunched-Beam Phase Rotation and FFAG -Factory Injection David Neuffer Fermilab.
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
1 of 12 Stephen Brooks JAI Advisory Board, February 2006  Neutrino Factory Muon Beam Production Studies.
Acceleration System Comparisons S. Machida ASTeC/RAL September, 2005, ISS meeting at CERN.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
Recent Progress Toward a Muon Recirculating Linear Accelerator S.A.Bogacz, V.S.Morozov, Y.R.Roblin 1, K.B.Beard 2, A. Kurup, M. Aslaninejad, C. Bonţoiu,
 Stephen Brooks / RAL / April 2004 Muon Front Ends Providing High-Intensity, Low-Emittance Muon Beams for the Neutrino Factory and Muon Collider.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
April 25, 2006ISS Plenary Meeting: RAL - Zisman International Scoping Study Accelerator Working Group: Status and Plans Michael S. Zisman Center for Beam.
 1 of 13 Stephen Brooks / RAL / March 2005 Muon Front Ends Providing High-Intensity, Low-Emittance Muon Beams for the Neutrino Factory and Muon Collider.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
Bunched-Beam Phase Rotation - Ring Coolers? - FFAGs? David Neuffer Fermilab.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz,
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz Status and Plans for Linac and RLAs.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz 1 Status of Baseline Linac and RLAs Design.
, UKNF Meetin, Imperial College J. Pasternak Status and Recent Progress in the Muon FFAG Designs J. Pasternak, Imperial College, London / RAL.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz IDS- NF Acceleration Meeting, Jefferson Lab,
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz NuFact’08, Valencia, Spain, July 4, 2008 Acceleration.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz 1 Recirculating Linac Acceleration  End-to-end.
EUROnu Review: 14 th April 2011 Summary of WP3 J. Pozimski.
Final Results from IDS-NF Study NUFACT14 Workshop, Glasgow on behalf of the IDS-NF Collaboration Paul Soler, 26 August 2014.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz NuFact’08, Valencia, Spain, July 4, 2008 Alex.
Conclusions and thanks
Accelerator R&D for Future Neutrino Projects
The Accelerator Complex from the International Design Study
Outline: Why now ? What ? How ?
Accelerator R&D for Future Neutrino Projects
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

February 28, 2011NF Report - Zisman1 Neutrino Factory Design Overview and IDS-NF Status Michael S. Zisman* Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory (*with thanks to: S. Berg, K. Long, J. Pasternak, J. Pozimski, G. Prior, and C. Rogers) MAP Meeting–Jlab February 28, 2011

NF Report - Zisman2 Outline Introduction Current baseline IDR designs IDR status Progress since ISS RDR goals RDR tasks RDR time scale MAP contributions RDR planning Summary

February 28, 2011NF Report - Zisman3 Introduction Neutrino Factory design effort has been carried out internationally for ~5 years – International Scoping Study (“ISS”) – follow-on organization is International Design Study for a Neutrino Factory (“IDS-NF”) European NF design effort managed and funded as part of EUROnu design study – EUROnu looking at 3 possible future neutrino facilities, along with corresponding detector options (WP5)  Superbeam (WP2), NF (WP3) and Beta Beam (WP4)  physics performance comparison of all three (WP6) EUROnu WP3 is fully integrated with IDS-NF Summary of main features follows

February 28, 2011NF Report - Zisman4 Current Baseline (1) Baseline has evolved since completion of ISS – mainly front-end optimization – primary “deliverables” unchanged System descriptions (to follow) from IDR – NF_IDR/IDS-NF_IDR-D14.pdf 129 authors (by my count)

February 28, 2011NF Report - Zisman5 Current Baseline (2) Schematic of IDR baseline shown here – brief descriptions of individual systems follow

February 28, 2011NF Report - Zisman6 IDR Proton Driver Proton driver defined only by performance specifications – several different implementations under study ISIS upgrade [Thomason]; high-power SPL [Garoby], Project X [Gollwitzer]

February 28, 2011NF Report - Zisman7 IDR Target Target still Hg jet in 20 T solenoid – shielding for magnets found to be inadequate too much heat deposited in coils – progress being made toward improved design Fe plug (now eliminated) McDonald; Kirk; Graves

February 28, 2011NF Report - Zisman8 IDR Front End (1) Optimization to make shorter channel [Neuffer] – lattice parameters documented

February 28, 2011NF Report - Zisman9 IDR Front End (2) Drift length 111  80 m Transport field 1.75 T  1.5 T Buncher section 51 m  33 m (V RF = 9 MV) Rotator 54 m  42 m (V RF = 12 MV) Cooling section 75 m (V RF = 15 MV) [Rogers] L = 120 m L = 80 m ISSIDS-NF Issue of RF in a magnetic field remains

February 28, 2011NF Report - Zisman10 Alternative Front Ends Because of RF issue, several alternative approaches still being studied as backups – bucked coil lattice [A. Alekou] – magnetically-insulated lattice [D. Stratakis] – HPRF lattice [J. Gallardo, M. Zisman] Bucked-coil lattice Magnetically insulated lattice HPRF cavity lattice

February 28, 2011NF Report - Zisman11 IDR Acceleration System Multiple systems adopted – linac, RLAs, FFAG

February 28, 2011NF Report - Zisman12 IDR Linac Linac accelerates to 0.9 GeV [Bogacz] – three sections with increasing cell length

February 28, 2011NF Report - Zisman13 IDR RLAs (1) Two RLAs [Bogacz] – GeV (0.6 GeV/pass) – GeV (2 GeV/pass) RLA1 RLA2

February 28, 2011NF Report - Zisman14 IDR RLAs (2) Optics developed to transmit both  + and  - in opposite directions – quad gradients increase linearly from linac center RLA1 linac RLA2 linac RLA1 ‘droplet’ arc

February 28, 2011NF Report - Zisman15 IDR FFAG (1) FFAG ( GeV) [Berg] – linear non-scaling design

February 28, 2011NF Report - Zisman16 IDR FFAG (2) Ring uses combined-function Nb-Ti magnets – designs for both F and D magnets in progress F magnet shown here; not yet optimized Iron yoke (field clamp) H. Witte

February 28, 2011NF Report - Zisman17 IDR FFAG (3) Scheme for injection and extraction has been developed [Pasternak, Kelliher] – requires lots of PFNs and lots of power InjectionExtraction

February 28, 2011NF Report - Zisman18 IDR Decay Ring (1) Unchanged since ISS Racetrack [Johnstone] Triangle [Prior, Rees]

February 28, 2011NF Report - Zisman19 IDR Decay Ring (2) Present baseline is racetrack design – more flexible two independent sources that can be oriented as needed can use either ring for both  + and  - – no ‘wasted’ beam if one ring or one detector unavailable – but, at a cost two tunnels needed four transfer lines to take full advantage of flexibility – and decent detector timing (~100 ns) Triangle remains a viable alternative – two rings side-by-side in single tunnel good detector timing mandatory with this geometry

February 28, 2011NF Report - Zisman20 IDR Status Original goals – develop complete (initial) NF accelerator design – produce initial cost estimate Where we are – designs for most systems completed and lattices available a few systems known to need work – E deposition in target region unacceptably high – no cost estimate is available Leaders of this phase – Berg, Pozimski

February 28, 2011NF Report - Zisman21 Progress Since ISS (1) Initial concepts of FNAL, RAL proton drivers Detailed E deposition studies in target area Many front-end improvements – shorter phase rotation and bunching systems – assessed impact of reduced V RF in baseline studied several alternatives as fallback options – particle loss estimates and mitigation strategy Studied more complete RLA designs – symmetric gradient profile – chicanes for arc crossings – chromatic corrections in chicanes

February 28, 2011NF Report - Zisman22 Progress Since ISS (2) More realistic FFAG design – longer drifts – higher average gradient – inj/extr system design – initial magnet designs Decay ring – studied diagnostics polarimeter, angular divergence measurement

February 28, 2011NF Report - Zisman23 RDR Goals Complete description of all systems Assessment of feasibility and performance – tracking (all systems, then end-to-end) with imperfections – sufficient engineering to validate designs of “tricky bits” – cost estimate for entire facility requires adequate level of design detail for engineering estimates

February 28, 2011NF Report - Zisman24 RDR Tasks (1) Overall – complete matching section designs to permit end-to-end simulations – complete engineering design of key components issues are feasibility and cost – complete cost estimate to be compared with EUROnu estimates for SB and BB – evaluate collective effects for all systems Target – develop new solenoid and shielding configuration – define infrastructure

February 28, 2011NF Report - Zisman25 RDR Tasks (2) Front end – develop method for handling particle losses – finalize cooling configuration issue of RF choice Acceleration – confirm mechanical layouts transfer lines, switchyards, bypasses, chicanes, arcs – finalize FFAG chromaticity correction scheme – track (with errors) through entire system linac, RLAs, FFAG – evaluate cost of including FFAG vs. using only linac and RLAs

February 28, 2011NF Report - Zisman26 RDR Tasks (3) Decay ring – decide on chromaticity correction scheme – define injection scheme – evaluate need for beam abort system – define and design ring diagnostics

February 28, 2011NF Report - Zisman27 RDR Time Scale Time scale for all of this effort estimated (Berg) at 2 years – lack of engineering particularly critical – physics effort is also “thin” (and lots to do!)

February 28, 2011NF Report - Zisman28 MAP Contributions (1) MAP proposed these IDS-NF activities – proton driver (Project X version) – targetry and target stations – pion capture and muon phase rotation – ionization cooling – accelerator systems – site-specific (FNAL) underground engineering issues for the muon storage rings – overall coordination of effort for the low-energy NF option – participating in costing

February 28, 2011NF Report - Zisman29 MAP Contributions (2) More or less keeping up with physics effort – engineering effort is lacking not obvious how to rectify this with projected budgets Proposed activities predicated on reaching $15M per year – right now, we’re at $10M (for reasons beyond our control) MICE magnet costs have risen dramatically and must be covered as the highest priority – leaves little “free energy” We must revisit IDS-NF promises/schedule

February 28, 2011NF Report - Zisman30 RDR Planning (1) Still (more or less) following original roadmap

February 28, 2011NF Report - Zisman31 RDR Planning (2) IDR draft is complete and final comments and corrections being incorporated – includes physics case, accelerator description, and detector descriptions Physics case still indicates NF is the most powerful tool for studying neutrino sector – finds continuum between single-baseline “LENF” and two-baseline IDS-NF configuration depends on value of sin 2 2  13 – which may well be known prior to making NF decision Lower MIND threshold validated – progress made on defining near detector

February 28, 2011NF Report - Zisman32 RDR Planning (3) IDR will be reviewed by ECFA panel on May 5-6, 2011 (at Daresbury Lab) – after which IDR will be updated as deemed appropriate then published on arXiv and as CERN Yellow Report Ongoing discussion on whether to publish IDR in refereed journal – strong views on both sides – decision at next IDS-NF plenary meeting October 17-19, 2011 at Virginia Tech – in any case, need to step up “community outreach”

February 28, 2011NF Report - Zisman33 Summary IDR design completed and documented – S. Berg and J. Pozimski editors of accelerator section – K. Long overall editor Lattices for main elements documented – will facilitate subsequent end-to-end tracking Review of IDR by ECFA panel scheduled for May 5-6, 2011 Plans for reaching RDR being developed – K. Long and IDS-NF steering group MAP resources for this task are limited