Preliminary result of the target polarization 2004 Kaori Kondo COMPASS target team
upstream cell downstream cell Polarization measurement 30 mm 60 mm 15 mm outer coil inner coil (coil 6) Coil 6 does not work.
magnetic field direction NMR signals negative polarization positive polarization (spin anti-parallel to the field) (spin parallel to the field) always monitored!
building up polarization relaxation time day polarization (%) typical polarization buildup 1 day : +42% & -40% 2 days: +47% & -46% 3 days: +50% & -48% 5 days: +52% & -49% at 60 mK 2.50 T (normal frozen mode) hours at 60 mK 0.42 T (transverse mode) 1400 hours lost 0.7 % in 2 weeks lost 2~3 % in 5 days
TE calibration Period Temperature (K) 5 May ~ 7 May May ~ 9 May May ~ 12 May June ~ 12 June June ~ 14 June /T signal area unit upstreamdownstream We had very good calibration with 5 temperature points. Errors from TE calibration can be about 1%
TE calibration relaxation time measurement 2 Aug. cooling water pressure 20 Aug. cooling water stop transverse thanks to Isabel upstream downstream
H E L P ! ! We would like target shift crews 21 Sept. ~ 4 Oct. Experienced people are welcomed. Still 13 shifts are not occupied. Have a look on: -> shiftlist. Contact with Fabrice Gautheron for volunteering!