Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Agenda General Information Project Status Transport Tubes Design.

Slides:



Advertisements
Similar presentations
AREAL Laser overview Advanced Research Electron Accelerator Laboratory Aghasi Lorsabyan.
Advertisements

LEReC Laser Controls & RF Requirements Brian Sheehy 10/31/13 Laser timing Laser design RF and Control Needs.
Philippe Hering October 30, 2007 Drive Laser Commissioning Results and Plans 1 Drive Laser Commissioning results and plans Philippe.
1 Injector Lasers Overview Sasha Gilevich, SLAC April 29, 2004 Drive Laser Specifications Challenges System Description Laser Procurement R&D Effort UV.
Dave Dowell, Sasha GilevichFacilities Advisory Committee October Injector Drive Laser Update Injector Drive Laser Update.
C.Limborg-Deprey ERL Workshop, Jefferson March 20th 2005 Optimum electron distribution for space charge dominated beams.
Sasha GilevichFacilities Advisory Committee October Injector Drive Laser Update 1 Facilities Advisory Committee Meeting.
Bill White Drive Laser April 16, Drive Laser Commissioning Experience Reminder of requirements on Drive Laser.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Sasha GilevichFacilities Advisory Committee April Injector Drive Laser Update Facilities Advisory Committee Meeting April.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
Recent developments for the LCLS injector Feng Zhou SLAC Other contributors: Brachmann, Decker, Ding, Emma, Gilevich, Huang, Iverson, Loos, Raubenheimer,
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
30. Nov I.Will, G. Klemz, Max Born Institute: Optical sampling system Optical sampling system for detailed measurement of the longitudinal pulse.
DMP Product Portfolio Femtosecond Lasers Trestles Ti:Sapphire lasers …… fs; nm, mW Mavericks Cr:Forsterite lasers
W.S. Graves, ASAC Review, Sept 18-19, 2003 Accelerator Overview Goals for proposal Description of technical components: injector, linac, compressors, etc.
The UCLA PEGASUS Plane-Wave Transformer Photoinjector G. Travish, G. Andonian, P. Frigola, S. Reiche, J. Rosenzweig, and S. Telfer UCLA Department of Physics.
Laser beam parameter measurements at PITZ J.Bähr Workshop on Laser Pulse Shaping DESY,Zeuthen, November 30, 2006.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
1) Source Issues 2) SLAC’s ITF Jym Clendenin SLAC.
Low Emittance RF Gun Developments for PAL-XFEL
C. Vicario LCLS ICW SLAC Oct. 9-11, THE DRIVE LASER: EXPERIENCE AT SPARC Carlo Vicario for SPARC collaboration.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Ultra-stable flashlamp-pumped laser A.Brachmann, J.Clendenin, T.Galetto, T.Maruyama, J.Sodja, J.Turner, M.Woods.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Brian Sheehy Laser and Timing.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today?
Schematic of Laser Transport Vacuum enclosure Laser Room Interlocked, controlled area Laser Wall Periscope in vacuum enclosure Cathode Fiduciary Beam line.
Laser system at PITZ J.Bähr LCLS Injector Commissioning Workshop SLAC, October 9-11, 2006.
Drive Laser Introduction ‘ir’ master oscillator power amplifier chain (MOPA) uses standard chirped pulse amplification scheme (CPA) third harmonic generation.
February 17-18, 2010 R&D ERL Brian Sheehy R&D ERL Laser and laser light transport Brian Sheehy February 17-18, 2010 Laser and Laser Light Transport.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Injector Requirements Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 1st, 2004 Cécile.
Feng Zhou SLAC Presented at HBB, Havana, Cuba, March 29, 2016 LCLS Injector Improvements & Plans.
SPARC Program Advisory Committee 22 Oct 2013 Dennis T. Palmer, INFN-Milano STAR: Southern Europe Thomson back-scattering source for Applied Research.
Sasha GilevichDrive Laser Meeting December Launch System Outline General Layout Incidence Angle Effect of the broad bandwidth.
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
Status of the SPARC laser and “dazzler” experiments
Summary of SPARC first-phase operations
Drive-Laser Commissioning Status and Plans
Pulse energy measurement for the CTF lasers.
Drive laser specifications:
Timing and synchronization at SPARC
Injector Performance Requirements Conventional Facilities Update
BC2 Commissioning Parameters
Application of a Streak camera at PITZ
LCLS Injector: Introduction D. H
RF-Gun for Phase-II RF Gun 10, June, 2016.
LCLS Commissioning Parameters
LCLS Commissioning Parameters
ATF 120 Hz Photocathode RF Gun Injection System Design Studies
LCLS Commissioning Parameters
Advanced Research Electron Accelerator Laboratory
Drive Laser Facility Layout Drive Laser Architecture Technical Issues
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Drive laser specifications:
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Drive Laser Commissioning Status
LCLS Injector Laser System Paul R. Bolton, SLAC April 24, 2002
LCLS Injector Configuration
LCLS Injector System Overview D. H
LCLS Commissioning Parameters
Injector Drive Laser Update
Injector Drive Laser Technical Status
BNL Photocathode R&D An overview of research on high quantum efficiency photocathodes and associated laser systems Andrew Burrill HPHB Workshop Nov 9,
Experience with photoinjector at ATF
Presentation transcript:

Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Agenda General Information Project Status Transport Tubes Design Gun Region Design Other Issues Meetings Materials are in the V:\AD\Drop boxes\Bolton\LCLS Drive Laser Meetings

Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Transport Tube UV Launch and Condition. Laser Heater Drive Laser RF Gun Laser Bay Photocathode Gun & Launch System Laser Heater Transport Tubes Electron Diagnostic Sector 20 Alcove Sector 20 Drive Laser System

Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 UV Pulse Specifications ParameterSystem RequirementComments Pulse repetition rate120 HzOperating rates of 1, 10, 30, 60 and 120 Hz Pulse Energy>0.2 mJ at 255nm (for 1 nC production with 3x10 -5 QE) Continuously adjustable Central Wavelength nm Pulse-to-pulse energy jitterLess than 2%(rms) variation Pulse timing jitter 2 0.1Hz Temporal pulse shape 3 Uniform, flat top, selected slope on flat-top within 3% of goal, and <8% peak-to-peak over flattop, 1 ps rise and fall at 10% to 90% 10% to +20% slope Pulse length10 ps (fwhm)5 to 20 ps 1. Longer wavelength is acceptable, but requires higher energy due to the reduction in cathode QE 2. Measured with respect to the 119 MHz clock – RF signal 3. The temporal pulse shape is nominally flat but the slope of the pulse must be adjustable from -10% (head 10% higher than the tail) to +20% (head 20% lower than the tail). Some adaptive temporal shaping will be required

Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 UV Pulse Specifications ParameterSystem RequirementOperating Range/ Comments Radial shapeUniform, flat top, <10% peak-to-peak variation within flattop plateau for any single pulse) Adjustable slope spot radius1.2 mm< 4 % (shot-to-shot) Centroid Position Stability Less than 3% of the beam radius (1/e 2 level)Measured at the laser output plane Pointing StabilityLess than 25μradMeasured at the laser output plane MTBF>5000 hours

Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 General Information Drive Laser will be a fully purchased and integrated system from the single vendor. Includes UV conversion and temporal shaping Optical transport, launch system, and diagnostics to be built by SLAC

Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Project Status UV Specifications Defined S20 drive laser facility requirements defined Title II facility design started Drive Laser (DL) Technical Review Committee created 1st meeting July 21, 2004 Procurement process for the Drive Laser started: SOW written APP approved Purchasing putting together the RFP package Design of the transport tubes started Mechanical and Optical design of the Launch and Conditioning System Started R&D effort is defined and started LCLS performs shaping & UV conversion R&D with other labs (BNL, LLNL…)

Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Transport Tubes Design

Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Gun Region Design

Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Gun Region Design Spatial Beam Shaping Newport Refractive Beam Shaper Two aspheric lenses Input Beam Output Beam

Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Gun Region Design Shaper Grating Aperture Windows Positive Lenses Cathode Window

Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Gun Region Design Bandwidth 4nm