List of Parts 9 7 1 4 9 1 2 2 Tarps 1Toolbox with Manual Wire cutters Cable Ties Ropes (2 short, 2 long) Cave Simulator Configuration Manual Thanks to.

Slides:



Advertisements
Similar presentations
The following photo essay shows a 2011 Hyundai Equus Sedan being transformed from a running passenger car into a specialized platform used for photographing.
Advertisements

Tent Pitching.
Detachable Modular Flotation System (DMFS)
By: Nick Copeland 05/02/2011 CorDEX Instruments Ltd IW Series Installation Guide – Can installing an IR Window really be this easy? IW Series - Intelligent.
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
Pharos Poster Printing OIT Large Format Printer/Plotter in ERB 1102: INSTRUCTIONS R.10/23/2012.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
1 Ghusal Janazah / bathing of the body Washing the body.
Ladder Safety Today’s topic is Ladder Safety. This training is a part of OSHA’s Portable Wood and Metal Ladder Safety Standards (29 CFR ). You.
Ladder Safety Today’s topic is Ladder Safety. This training is a part of OSHA’s Portable Wood and Metal Ladder Safety Standards (29 CFR ). You.
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Girl and Boy Scouts know this equipment for this type of cooking as buddy burners and vagabond stoves. As with stick roasting, anyone can construct the.
Year 7 Curriculum Day Tuesday 10 th October 2006 Team-building Working together Problem solving Facing challenges Having fun.
Matt Petrie KEPA 119 4/16/09. If there is a situation where a shelter is going to be needed then it should be one of first things to taken care of. People.
Managing Bees and a few other things…………….. Starting a colony of honey bees Presented By The Ohio State Beekeeper’s Association.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
How to Make a Hot Air Balloon
Flag Raising, Lowering, and Folding
ResQmax Line Deployment Kit -ResQmax Launcher- 5 nozzle protectors -2 Streamline Projectiles- O-ring kit -500’ 3mm line with container- Corrosion block.
Instructions 1.  SITING YOUR TRAMPOLINE  Your trampoline works best and is safest if it is dead level. If your trampoline is fitted.
Instructions 1.  SITING YOUR TRAMPOLINE  Your trampoline works best and is safest if it is dead level. If your trampoline is fitted.
Building Monitor Evacuation Training October 2010.
Electronics Merit Badge Class 4 5/17/2015Electronics Merit Badge Class National Scout Jamboree1.
CAP Ground Team - Task O Conduct Individual Refit Revision December 2011 CAP Ground Team - Task O Conduct Individual Refit Revision December.
American Electrical, Inc. Junction Box / Hookup Box Fast and easy way to make electrical connections An assembled kit – no need to procure and assemble.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
Vex 1.0 © Carnegie Mellon Robotics Academy Inc. MULTIMETER Introduction This PowerPoint is a companion to the videos in “Background / Resources / Multimeter.
LSU 06/04/2007Electronics 81 CAD Tools for Circuit Design Electronics Unit – Lecture 8 Schematic Diagram Drawing Etched Circuit Board Layout Circuit Simulation.
SpectraSonde Assembly. What is the SpectraSonde? Reads temperature, pressure, and humidity data from the atmosphere. The SpectraSonde doesn’t fly like.
Title: Corvette C5 Column Lock Bypass Originator: John Neese Date: 30 Jan 2005 Revision: Sheet: 1 of 6 Column Lock Bypass.
Electrical Principles and Wiring Materials
Assembly Instructions (Circular Slab) Mix dry ingredients in a rigid metal container All quantities measured in lbs. unless otherwise noted Mix dry ingredients.
Getting started with Microsoft.NET Gadgeteer Comberton Village College Gadgeteer Club.
RT 408 Repairing manual. Chapter one The whole machine problems.
Apeshit Mods + kitsch-bent > LEDx3 ver. 1 3/31/2011 kitsch-bent.com.
HOW TO OPERATE THE AIRO PLAYER SUPERBOOTS. The Airo Player Superboots have been designed to provide you with a safe and an amazing experience. Follow.
Final Outcome Accuracy of measurements Material Design.
Setting up the Ricoh C305 Press F5 to start the Presentation
Electrical Principles and Wiring Materials Unit #31.
Body Neck Bridge Nut Strings/Fret board Tuning pegs Sound hole Pegs Waist Take note that the strings from the thickest to thinnest (top to bottom) are.
Vector NTI. Go Herd! Download your sequence and open the file Click your name on my web page on the class genes page
Epoxy Treatment of Centaur Hull Winston Waller W 4337.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
How to make a simple tempeh incubator. For all information regarding, how to make tempeh or purchasing of materials for tempeh/tofu making please visit.
Instead of using expensive and complicated materials in making a Rainwater Harvesting System…
Project On Ethernet Cable Building & Video Recording James Maclean & Stephen Craig.
The Monitor 4000 Alarm provides the most cost effective, worry-free method of keeping backdoors secure during business hours…protecting your business,
RIGHT TURNS A step by step guide intended to support the practical training. Select Slide Show from the top Toolbar then From Beginning. Let it run until.
Electrical Principles and Wiring Materials Original Power Point Created by Casey Osksa Modified by Georgia Agricultural Education Curriculum Office June.
KITCHEN LAB DUTIES. YOUR RESPONSIBILITIES Our kitchen works as a team, between your own classmates and the four other classes that use it every day. You.
Fire Extinguisher Inspection
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Helmet and shoulder pad removal for boarding purposes. Important to remember there are various types of helmets out there so be aware of what your team.
HOW TO MUMMIFY A TOMATO.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 23 PowerPoint presentation Preparation techniques.
T. Hajer Brahim & T. Rania Alakazalah U.Y: 1435/1436 H.
Foldable Tie Book Instructions. Materials Needed 2 pieces of scrap paper Glue stick Paper Hole Punch Tool 1 piece of yarn cut to one arm’s length.
RockOn! RockOn! Structure Build RockOn! 2009.
This picture shows what the wiring of a new alternator looks like
LONER MOBILE.
LONER MOBILE.
Welcome We’re using a new cost system for BAJA SAE for the 2018 season. The main change will be moving away from an MS Excel document to an online system.
Natural Sciences and Technology Grade 6
Road to Civil War booklet directions
Using an Epsilon trap…. Call that a cow! Who are they kidding?
Drilling and Blasting Toolbox Talk : 02 Updated Aug 2014
Cave Simulator Configuration Manual List of Parts
Presentation transcript:

List of Parts Tarps 1Toolbox with Manual Wire cutters Cable Ties Ropes (2 short, 2 long) Cave Simulator Configuration Manual Thanks to the Essex County Scout Caving Team for this manual

Assembly Instructions Lay one of the tarps on the ground. Select a layout from the following pages. If you want to get as many people as possible through as quickly as possible, like at a jamboree, it is recommended that you select a design with a single route through. People can then queue, go through and leave. If you have a group of people using the simulator for a set period of time, then you would be better selecting a design with choices of route, dead ends and chambers, as this will take longer to explore. Assemble the boards as in the design. Blue lines represent the 6 foot boards, red lines represent the 4 foot boards, and green lines represent the 2 foot square boards. The dashed lines represent the location of a hole in the board. Not all designs use all boards, so don’t be worried if there are some left over. All boards have small holes top and bottom where they meet other boards. These must be tied together with cable ties. Ensure cable ties will not rub on the tarps. When assembled, check the route through to ensure the boards are in the correct place, and that you can get right through. Also check all joints top and bottom to ensure they are all tied. Cover the structure with the other tarp. Using the eyelets, tie the top tarp to the bottom one, leaving a gap for the entrance and exit. There are two short ropes and two long ropes. Dismantling Instructions Untie the top tarp from the bottom one Remove and fold the top tarp. Snip all cable ties. It is recommended that the bottom ones are done first because if you undo the top ones first the panels fall over and tighten up the bottom ones making them difficult to undo. Use the wire cutters to cut the ties as a knife can damage the bottom tarp. If damage occurs to a tarp, you will be charged $75 for a replacement. Pile up the boards in order of size ready to load into whatever transport is being used. Sweep the bottom tarpaulin and fold it. If any of the parts are wet, they should be dried as soon as possible. Usage Instructions Whoever is supervising the use of the Cave Simulator should be familiar with the layout that has been used. There should be someone prepared to go in themselves in case anyone panics and requires help whilst inside. This person should be armed with a good torch. There should not be more than 7 to 10 people in the Simulator at once. If the Simulator is being used for more than one day, someone with a torch should go through after each days use and check that all the ties are ok and replace any that are missing. Litter and lost property should also be removed. Alternatively, these checks can be carried out be removing the top tarpaulin. When not in use, the entrance and exit should be covered so as to discourage people from using it unsupervised.

L01

L02

L03

L04

L05

L06

L07

L99

M01

M02

M03

M04

M05

M06

M07

M08

M09

M10

S01

S02