TEVATRON COLLIDER COLLIMATORS AND ABSORBERS Fermilab Materials for Collimators and Absorbers Nikolai Mokhov, Fermilab Workshop on Materials for Collimators.

Slides:



Advertisements
Similar presentations
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Advertisements

1 Accelerator Physics Aspects LHCb Accelerator Physics Aspects LHCb CERN SL/AP n Layout n Crossing Scheme n Luminosity n Collision.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Status of the LHC Mike Lamont for the LHC team. The LHC Very big Very cold Very high energy 2.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
Collimation System for Beam Loss Localization with Slip Stacking Injection in the Fermilab Main Injector Bruce C. Brown Main Injector Department Accelerator.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
Loss problems associated with the acceleration of radioactive beams and what we can do about it A.Jansson f fermilab Loss issues (and ideas for solutions)
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
I. Strasik et al. ● Halo Collimation of Proton and Ion Beams in FAIR Synchrotron SIS 100 ● CERN Halo Collimation of Proton and Ion Beams in.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
W. Scandale 1 Status of UA9 Walter Scandale CERN CC09 5 th workshop on crystal channeling March 2009.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
Tertiary Collimators in IP1/IP5 LARP Collaboration Meeting Pheasant Run, St. Charles, IL October 5-6, 2005 Fermilab LARP Collaboration Nikolai Mokhov,
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
F Project-X Related Issues in Recycler A.Burov, C.Gattuso, V.Lebedev, A.Leveling, A.Valishev, L.Vorobiev Fermilab AAC Review 8/8/2007.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Check lists to mouse clicks Automation Session : WAO The Fermi National Accelerator Laboratory is a U.S. Department of Energy (DOE) research laboratory,
Overview: Primary Sensitivities Nov S. Childress Page 1 NuMI Overview: NuMI Primary Beamline Sensitivities NuMI requirements are for a very large.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Updates on FLUKA simulations of TCDQ halo loads at IR6 FLUKA team & B. Goddard LHC Collimation Working Group March 5 th, 2007.
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
LHC collimation R. Bruce on behalf of the CERN LHC collimation team R. Bruce,
Protecting Superconducting Magnets from Radiation at Hadron Colliders Accelerator Magnet Technology CARE Workshop on Beam Generated Heat Deposition and.
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Status and Results of the UA9 Crystal Collimation Experiment at CERN-SPS Walter Scandale (CERN, LAL, INFN) for the UA9 collaboration Mini-workshop UA9,
Eduardo Nebot del Busto (1) CERN, Geneva, Switzerland (2) The University of Liverpool, Department of physics, Liverpool, U. K (3) The Cockcroft Institute,
Case study: Energy deposition in superconducting magnets in IR7 AMT Workshop A.Ferrari, M.Magistris, M.Santana, V.Vlachoudis CERN Fri 4/3/2005.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Beam collimation in the transfer line from 8 GeV linac to the Main Injector A. Drozhdin The beam transfer line from 8 GeV Linac to the Main Injector is.
BOOSTER COLLIMATION AND SHIELDING Proton Source Workshop Fermilab December 7-8, 2010 Nikolai Mokhov Fermilab Accelerator Physics Center.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Energy Deposition Issues in LHC IR Upgrades LHC IR Upgrades Workshop Pheasant Run, St. Charles, IL October 3-4, 2005 Fermilab LHC IR 2005 Nikolai Mokhov,
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Collimation design considerations at CERN (with some applications to LHC) R. Bruce on behalf of the CERN LHC collimation project R. Bruce,
J-Parc Neutrino Facility Primary Proton Beam Design A. K. Ichikawa(KEK), Y.Iwamoto(KEK) and K.Tanabe(Tokyo) et.al. 7 th Nov. 2003,
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON CSN1 LNF 17 September 2007 Walter Scandale CERN.
Turnaround time in modern hadron colliders & store-length optimization
Crystal Collimation at SSC and Tevatron CARE Workshop on Crystal Collimation in Hadron Storage Rings CERN March 7-8, 2005 Fermilab CARE CC-2005 Nikolai.
Halo Collimation of Protons and Heavy Ions in SIS-100.
FHI experimental opportunities? FHI meeting 17/9/14.
Halo Collimation of Protons and Heavy Ions in SIS-100
CRYSTALS AS LONG-TERM IMPROVEMENT FOR LHC COLLIMATION
BEAM LOSS MONITORING SYSTEM
Collimation Concept for Beam Halo Losses in SIS 100
Beam-beam effects in eRHIC and MeRHIC
Simulations of collimation losses at RHIC
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Progress in Collimation study
BEAM LOSS MONITORING SYSTEM
Beam collimation for SPPC
Beam-Induced Energy Deposition Studies in IR Magnets
Collimation for beta-beams
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LHC Collimation Requirements
Optic design and performance evaluation for SPPC collimation systems
Protection against accidental beam loss at the LHC
Beam halo and beam losses in IR1 and IR5
Collimators: Operations - Baseline Assumptions
Tertiary Collimators in IP1/IP5: Progress Report
Review of Quench Limits
IR/MDI requirements for the EIC
Presentation transcript:

TEVATRON COLLIDER COLLIMATORS AND ABSORBERS Fermilab Materials for Collimators and Absorbers Nikolai Mokhov, Fermilab Workshop on Materials for Collimators and Beam Absorbers CERN, Switzerland September 3-5, 2007

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 2 OUTLINE Introduction Tevatron Parameters Quench Levels and Collimation Constraints Collimation System Evolution 1979 to 2007 Newest System in Main Injector External Beam Abort Dump Collider Internal Beam Dump Summary

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 3 INTRODUCTION At hadron colliders, as at any other accelerator, the creation of beam halo is unavoidable. This happens because of beam-gas interactions, intra-beam scattering, proton-proton (antiproton) collisions in the interaction regions (IP), and particle diffusion due to RF noise, ground motion and resonances excited by the accelerator magnet nonlinearities and power supplies ripple. As a result of halo interactions with limiting apertures, hadronic and electromagnetic showers are induced in accelerator and detector components causing numerous deleterious effects ranging from minor to severe. An accidental beam loss induced by an unsynchronized abort launched at abort system malfunction, can cause catastrophic damage to the collider equipment. Only with a very efficient beam collimation system can one reduce uncontrolled beam losses in the machine to an allowable level. Design of such a system for high-energy high-intensity beams is very challenging. Beam absorbers in straight sections or at the end of an extraction line is another subject of serious concern: -> Tevatron.

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 4 TEVATRON MACHINE PARAMETERS Injection Energy150 Gev Flattop Energy980 Gev (800 GeV Fixed Target) Number of bunches36 proton & 36 antiproton (996 Fixed Target) Particles per bunch300 E9 protons & E9 pbars Total Beam Intensities at 150, 980 GevProtons 1E13 Antiprotons 1.4 E12, 3E12 (2.5 E13 Fixed Target) Orbits TypesBoth beams in 1 vacuum pipe ; Beams separated by electrostatic separators Lowbeta steps15 different lattice in 25 steps Beta *1.7m and transition to 28cm Number of IP’s2 : CDF & D0 Shot setup (Fill) time2 hours (57 second cycle time Fixed Target) Store lengths~ 24 hours

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 5 SLOW AND FAST QUENCH LEVELS IN TEVATRON 0.975

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 6 BEAM COLLIMATION CONSTRAINTS AT COLLIDERS Sustain favorable background conditions in experiments. Maintain operational reliability in stores: quench stability and dynamic heat loads on cryogenics. Prevent quenching SC magnets and damage of machine and detector components at unsynchronized beam aborts. Minimize radiation damage to components, maximize their lifetime. Minimize impact of radiation on personnel and environment: prompt and residual radiation (hands-on maintenance).

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 7 TEVATRON COLLIMATION SYSTEM EVOLUTION Design report, commissioning, initial operation: a few single 0.9 to 1.8- m long SS collimators in front of SC magnets (Edwards, Pruss, Van Ginneken, ). A set of two-unit collimators at optimal locations based on STRUCT/MARS modeling allowed 5-fold increase of 800-GeV proton beam intensity at fast resonant extraction (Drozhdin, Harrison, Mokhov, 1985). First two-stage system, two 2.5-mm thick L-shape tungsten targets with 0.3-mm offset relative to A0 scrapers: 5-fold reduction of beam loss rates upstream D0 and CDF detectors (Drozhdin, Mokhov et al., 1995). Genuine two-stage system designed for Run-II with primary and secondary collimators at appropriate locations optimized in STRUCT/MARS runs (Church, Drozhdin, Mokhov, 1999) -> clean TeV Current system with a tertiary collimator (Drozhdin, Mokhov,Still). Crystal collimation (Carrigan, Drozhdin, Mokhov, Still).

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 8 TEVATRON COLLIMATION SET (1985) - 1

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 9 TEVATRON COLLIMATION SET (1985) - 2

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 10 EXCERPTS FROM FN-418 REPORT (1985)

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 11 TOWARDS TWO-STAGE COLLIMATION (1995) Adding two 2.5-mm L-shape tungsten “primary collimators” on A0 scraper resulted in 2.5 to 5 times lower beam losses in D0 and B0 regions

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 12 TEVATRON RUN-II COLLIMATION SYSTEM (1999)

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 13 CURRENT TEVATRON COLLIMATION SYSTEM Primary: L-shaped 2.5-mm thick tungsten blades at 5 to 6  from the beam axis in a high-  (betatron cleaning) and non-zero dispersion (momentum cleaning) regions; three targets (H, V and off-momentum). Secondary: 1.5-m long stainless steel adjustable H&V collimators (L-shape jaws) located at the appropriate phase advances (30 & 150 deg) 1  farther from the beam axis, alligned parallel to the envelope of the circulating beam. Tertiary: 1-m long stainless steel adjustable units upstream of the low-beta region – to catch remedies from secondary collimators and beam-gas products, and to protect inner triplet and detector at abort kicker prefires (mandatory!) <- since Longitudinal beam loss, beam-gas scattering and elastic part of collision loss are the main mechanisms of the slow beam halo growth. The system intercepts 99.9% of this halo, with 3×10 7 p/s scraping rate.

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 14 COLLIMATION SYSTEM PERFORMANCE IN RUN II Halo Rates at Collider Detectors: D0 alignment and Vacuum improvements

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov BEAM ACCIDENT IN TEVATRON December 5, 2003 A 2/3 ring beam-induced fast quench, caused by a Roman Pot moved into beam due to a control error, with beam loss damaging 2 collimators and 2 spool pieces (3 correction elements); two-week shutdown.

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 16 CRYSTAL COLLIMATION IN TEVATRON (2006) Using the crystal, the secondary collimator E03 can remain further (1 mm or so) from the beam and achieve almost a factor of 2 better result in reduction of CDF losses a half a ring (2 miles) downstream! A 2-year plan for crystal collimation collaborative study (FNAL, CERN, INFN, IHEP et al) in Tevatron has just been approved by AAC & LARP Crystal aligned at peak (118  rad) E03 BLM CDF PIN

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 17 Beam Cleaning in MI-8 Injection Line (2006) The 4-unit collimation system was designed and installed to cut p/s of 8-GeV proton beam. Residual dose rate on collimator shielding outer surface was the driver, therefore a 12-cm marble shell was implemented. Towars a MW beam in the Main Injector

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 18 MAIN INJECTOR RING COLLIMATION (2007) System designed for >1-MW beam in MI ring Multi-component system of primary & secondary collimators and masks, most with marble shells. Spreads over 200 m. It is installed these days.

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 19 TEVATRON EXTERNAL C0 BEAM DUMP ( ) Two cores, 15x15x2.5 cm3 x 350 graphite plates, contained in Al boxes with grooves for cooling water, surrounded with steel/concrete shield; well instrumen- ted: ion chamber, 5 PRT, downstream calorimeter and radiation monitors.  T~1000 degC in graphite

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 20 TEVATRON COLLIDER INTERNAL DUMP AT A0

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 21 TEVATRON COLLIDER INTERNAL BEAM DUMP (2)  T max ~800 deg C in graphite

Materials Workshop, CERN, Sept 3-5, 2007Tevatron Collimators and Absorbers - N.V. Mokhov 22 SUMMARY Beam collimation is mandatory at any superconducting collider to protect components against excessive irradiation, minimize backgrounds in the experiments, maintain operational reliability over the life of the machine, and reduce the impact of radiation on environment, both at normal operation and accidental situations. Highly-efficient two-stage collimation system at Tevatron reliably serves these purposes. Recent developments include marble shells and crystal collimation. The later, gives a possibility to test channeling techniques in a collider as an interesting option for LHC. External and internal Tevatron collider graphite-based beam absorbers also exhibit high performance.