TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.

Slides:



Advertisements
Similar presentations
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Advertisements

Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Problems with Muon System N. Bondar O.Maev
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
Hit rate at high luminosity logical channels - ghosts – efficiency Toy Monte Carlo : # I have assumed a uniform particle distribution inside the TS # I.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
ALICE sensitivity to background and injection failures with the smaller aperture A. Di Mauro TREX meeting, 31/07/2014.
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
André Augustinus P2 events & perturbations 07 May 2010 ALICE Technical Coordination Meeting.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
LKr status R. Fantechi.
The High Voltage problem
Jean-Sebastien Graulich, Geneva
ATLAS MDT HV – LV Detector Control System (DCS)
PMD PMD Plans Detector Issues and solution Plans for LS1 29 June 2012.
Conceptual design of TOF and beam test results
RPC HV&LV status Introduction HV power supply tender
TPC Detector Control System
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Presentation transcript:

TOF status and LS1 plansTOF status and LS1 plans 27/06/2012

①Review current detector issues 2

1.What are the current hardware problems that create data taking inefficiencies and what is the planned follow up ? The major source of data taking inefficiency due to the TOF detector is the issue with the 3.3V (100A) LV channels. This failure (Under Voltage) can be recovered with a power-cycle; nevertheless, if TOF is running, it will make the run crash. this problem started happening during last year; 13 events have been recorded since April 2012 (affecting 11 crates) randomly distributed over the TOF; no obvious correlations with beam conditions, TOF status and data taking activity (details in backup slides). We have already checked LV settings and threshold; could they be induced by other detectors activities (via ground connections)? CAEN is investigating the problem since the end of One full crate (3 times in error in December 2011) is currently under test in Viareggio. Backup solution: use the DAQ pause-and-configure procedure. FW with SYNC event handling already deployed (tested OK); Recovery procedure has to be implemented: PVSS (crate rebooting - Andrea) + VME (data taking resuming without a SOD - Pietro). Possible, even not trivial. TOF issues 3

2.Which are the rate limits of your detector and what are the detailed reasons ? No any problem with the expected rates at the predicted 2012 pA luminosities are foreseen with the TOF detector (see next slides). TOF issues 4

L = 4×10 26 Hz/cm 2 (estimated V0AND ≈ 200kHz)  I TOF ≈ 80μA. TOF load due to background events is less wrt genuine pp collisions. To estimate the TOF expected behavior with pPb in 2012 we should extrapolate the PbPb values. For 200kHz we would expect that I TOF ≈ 3 I TOF L = 4×10 26 Hz/cm 2 ) ≈ 300μA  less than 0.2μA per MRPC. Since the average dN/dy is  360 for PbPb and  21 for pPb, we can assume that the detector load for pPb should be 200kHz/4kHz * 21/360 ≈ 3 times the detector load observed with PbPb in gap of 4.5uA due to a single faulty chamber TOF in the pPb 2012 scenario negative HV positive HV negative HV positive HV V0AND ≈ 260kHz  I TOF ≈ 50μA. 5

HL LHC ( L = 5×10 27 Hz/cm 2 ) pPB 2012 ( L = Hz/cm 2 ) The MRPCs demonstrated to tolerate fluxes up to 1kHz/cm 2 without problem. MRPC rate capability with PbPb extrapolated to pPb 2012 Measured flux of particle scales linearly with the luminosity (the flux has been estimated using the single trigger-pad rate and the ratio between trigger-pad and readout-pad multiplicity). The expected flux with pPb and a value of L = Hz/cm 2 is ≈ 25 Hz/cm 2. 6

Saturday, 16 th June 2012, the ALICE solenoid tripped; this resulted in an increase of the vacuum pressure in the beam pipe inside the ALICE hall. The large amount of beam-gas interactions induced an increase of the current drawn by the TOF detector. I TOF = V0AND = 2MHz From PbPb extrapolation we would expect ≈ 2MHz of V0AND instead of 560μA, which is the measured values; the genuine pp collisions equivalent load could be estimated as ≈ 1.3MHz, far in excess of the expected values for pPb By the way, the total current drawn by the TOF for this very high load value was less than 0.4μA per MRPC. When I TOF > 1mA the TOF HV channels started tripping just because the I max threshold is at the level of 20μA per channel (10μA for both negative and positive channels)  ≈ 1μA per MRPC. Unplanned high rates V0AND = 3MHz negative HV positive HV negative HV positive HV 7

②Plans for LS1 8

1.review of the cooling system -- are there upgrades and improvements necessary ? No urgent upgrades are needed. As a low priority improvement, it could be useful to have a tool to tune the pressure in each individual cooling loop (3 + 3 loops for crates and loops for FE). Actually we are sharing our cooling plant with PHOS and EmCal; are some changes foreseen? LS1 plans – cooling system upgrades average crate temperature FE electronics board temperature upper hemisphere 9

2.review of the gas system -- are there upgrades planned ? Can we reduce the gas consumption ? No upgrade are planned, no gas consumption reduction until the end of 2012 data taking. During the LS1 we agree to reduce the gas consumption: by stopping the gas system and flushing the TOF only for short periods every few months; we don’t want to use gas mixtures different from the one used so far during data taking. However we want to start flushing the TOF with the standard gas mixture and with high fluxes at least 3 months before the resuming of the data taking after LS1. LS1 plans – gas system upgrades 10

3.are the new cable to be pulled between the CRs and the cavern for your subdetector ? The answer should be “No”, but… … we observe that some LV PS failures can be recovered switching off completely the PS (CAEN A3485A). In the present design we have 4 power supplies (1 per corner) each one providing the 48V service to 9 A3485A (one A3485A gives power to 1 pair of crate). To recover one crate we have to switch off a quarter of TOF (not recommended with B filed ON). We ask CAEN to develop a solution in order to distribute the 48V service so we can switch off each A3485A leaving the others on. We are still waiting a few details from CAEN concerning: how this solution will be implemented from the hardware point of view (external board or embedded solution); how we can control each individual 48V service lines (by software with the A1396A branch controller already used to control the A3485A power supplies or with dedicated boards to be housed by crates in the CRs). In the latter scenario we will need to pull some cables between CRs and the balcony A technical report from CAEN is expected for this or next week. LS1 plans – pulling new cables 11

4.what kind of hardware interventions are planned ? Full replacement of all CAEN DC-DC converters (A1396A); so far 5 final-version A1396A have been installed (during 2012 TS1) and are working without showing any problem. Replacement of faulty DRMs (Detector Readout Module), TRMs (TDC Readout Module) and LTMs (Local Trigger Module). Improving of the ground connections; Intervention (eventually) on the cooling system, at the crate level, for two very hot crates in sector 08. It would be very useful for us to have a time schedule of the working periods in order to plan the activities with our technicians. LS1 plans – hardware interventions 12

backup 13

3.3V failure in

3.3V failure in /2 15

3.3V failure in /2 16