Mec-Tric Control Company In Field Valve Testing on SRV’s with on process line AVK pressure device. MEC-TRIC.

Slides:



Advertisements
Similar presentations
An Indispensable Quality Assurance Tool for Dairy Processing Plants.
Advertisements

FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Software Quality Assurance Plan
Preventing Equipment Failures
Fired And Unfired Pressure Vessels
Fundamentals of Pressure Relief Devices
Chapter 12 Prototyping and Testing Design of Biomedical Devices and Systems By Paul H. King Richard C. Fries.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
Pipe Supports and Hangers
1 SOFTWARE TESTING Przygotował: Marcin Lubawski. 2 Testing Process AnalyseDesignMaintainBuildTestInstal Software testing strategies Verification Validation.
Office: (903) Web: Advanced Technology for the Heat Treatment Industry.
EQUIPMENT VALIDATION.
POLICY & PROCEDURE NCPWB WELDER PERFORMANCE QUALIFICATIONS
ASME Nuclear Conformity Assessment
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Condensation Piping and Installation Drain Pans
Roofing Fall Protection The following presentation can be used to satisfy the training requirements of the Fall Protection Standard in the WISHA Safety.
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
Cranes, Hoists and Truck Hoists
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Girard Equipment, Inc. DOT REGISTERED TANK COMPONENT MANUFACTURER 4360 Old Dixie Hwy, Vero Beach, FL MC307 to DOT407 Conversion.
LOCKOUT/TAGOUT.
Quality Management System
Introduction to Safety Relief Systems
Lockout-Tagout (Control of Hazardous Energy) This training program is designed to inform management of the requirements of the Lockout-Tagout Program for.
Controlling Hazardous Energy
Equipment Familiarization Amatrol 850 Basic Hydraulic Training System
Systems Analysis Chapter 8 P 94 to P 101
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
WWLC Standard Operating Procedures Presented by Frank Hall, Laboratory Certification Coordinator.
1 ISTOG Position on Pre-conditioning ISTOG Input on Interpretation and Clarification Of NUREG-1482 Sections 3.5 / 3.6.
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
1 Manufacturing Processes and Validation for Next Generation Implants.
VALIDATION METHODOLOGY
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Quality Cost Quality Cost- those cost associate with the non achievement of product or service quality. Types Prevention Cost –Planning, Document, Control,
Temperature Control Loop
Support Programs version 2 March 2010 Cleaning and Sanitation
International Fire Door Inspector Association Presents New Annual Fire Door Inspections NFPA 80 – 2007, 2010, 2013 Standard for Fire Doors and Other Opening.
Quality Control Project Management Unit Credit Value : 4 Essential
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Specification & Installation pitfalls “Getting it right to ensure safe drinking water”
Backflow Prevention for Fire Sprinkler Systems State of Illinois Plumbing Code.
Idaho Procedures M100 OPTICAL SCAN PRECINCT TABULATOR.
Development of Agreement Concerning the Adoption of Uniform Conditions for Periodical Technical Inspections of Wheeled Vehicles and the Reciprocal Recognition.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
1 Phase Testing. Janice Regan, For each group of units Overview of Implementation phase Create Class Skeletons Define Implementation Plan (+ determine.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
1 Manufacturing Processes and Validation for Next Generation Implants.
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Supplier Corrective Action Request (SCAR) Supplier Training
1 Proposed Amendments to the Verification Procedure for In-Use Diesel Emission Control Strategies August 23, 2012 California Environmental Protection Agency.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
National Highway Institute 5-1 REV-2, JAN 2006 EQUIPMENT FACTORS AFFECTING INERTIAL PROFILER MEASUREMENTS BLOCK 5.
Overview of Instrument Calibration Presents by NCQC, India.
Unit Twelve Pilot Operated Pressure Control Valves At first glance the diagram would appear to show three different valves but the box surrounding the.
Components Valves.
Cross Connection Survey Training
The Control of Hazardous Energy (Lockout-Tagout)
TRANSACTION PROCESSING SYSTEM (TPS)
Sources of Energy ELECTRICAL MECHANICAL PNEUMATIC FLUID AND GASES
Calibration Web Innovations 2017.
Developing Information Systems
The Control of Hazardous Energy (Lockout-Tagout)
CDE Transportation Unit
Control of Hazardous Energy
First Article Inspection
Boiler Safety Valve Regulations
Presentation transcript:

Mec-Tric Control Company In Field Valve Testing on SRV’s with on process line AVK pressure device. MEC-TRIC

AVK Valve In Place Test System Mec-Tric Control Company offers a lift assist device that allows for the testing of safety relief valves while still in line, and operational. The AVK is an electro-hydraulic computerized testing unit that when connected to the valve records the pressure at which the valve lifts. The AVK connects to the stem of the safety valve and measures the vertical forces exerted by the spring and load train of the valve. Tests are preformed while your system is under pressure, therefore no loss of production is incurred due to removing safety relief valves. Test documentation provided to end user will satisfy ASME & Insurance inspectors.

MEC-TRIC AVK Valve In Place Test System The A.V.K. UltraStar LFM is an in-line pressure relief valve testing device (also commonly referred to as an A.L.D., auxiliary lift device). Its primary function is to verify the set pressure of pressure-relief valves in-line. With the in-line testing of valves, the costly and time- consuming job of valve removal and reinstallation is eliminated. Only those valves failing the test need to be scheduled for repair during system scheduled shutdown. Using the data acquired through system transducers, the UltraStar LFM provides a consistent and accurate valve set pressure. The UltraStar LFM design includes a hydraulic actuator assembly that is mounted to the valve. A custom-designed robotic gripper-arm applies force to the valve spindle to determine set pressure. In the event of an over-pressure condition, the UltraStar LFM does not hamper the normal operation of the valve regardless of the testing phase currently in progress. An additional feature provides for the controlled re-closing of the valve, preventing disk collapse and damage to the valve spindle. The UltraStar LFM tester contains a state-of-the-art computer system, data acquisition hardware, and proprietary software to acquire, process, and store the test data. The test results can then be printed or downloaded to other applications.

MEC-TRIC AVK Valve In Place Test System Valve requirements for the AVK are the following: 50% of set pressure under the valve Valve must be flanged* Must have at least a 16” clearance above the valve for test device* Service must be non-liquid, and non-hazardous vapors (Steam, Air Vapor) No more than 95% of set pressure of valve on process line* The AVK is ideal for testing valves in place which will determine which valves need to be pulled out of service for repair, and which can remain inline through another cycle. The AVK reduces manpower and downtime expenses. * Contact Mec-Tric Service Department for additional information if outside of servicing specifications.

MEC-TRIC AVK Valve In Place Test System AVK device illustrating computer with display (center) and hydraulic hand pump stem lifter (left).

MEC-TRIC AVK Valve In Place Test System Customer data, set pressure of valve, valve type, valve size, section code is inputted into AVK before valve lift/test process begins. AVK display indicating stem target force value on right (08 value) and pressure applied to stem left (0 value). Valve stem has not been lifted in this display screen. As hydraulic pump is actuated, value on left will increase as stem lift pressure increases. The stem lift pressure will eventually overcome the force of the valve spring and the valve disc will open at the set pressure of the valve, provided the valve is operating correctly.

MEC-TRIC AVK Valve In Place Test System Pressure sensing device that mounts to valve stem and interfaces with AVK is illustrated below. Each valve type has specific software modeled for the manufacturers type and size of the specific valve. Valve Load Cell/ Pressure sensing device

MEC-TRIC AVK Valve In Place Test System Test Reports/Graphs for each valve tested are completed as follows: AFT=As Found Test VT1 & VT2=Verify test 1&2

MEC-TRIC AVK Valve In Place Test System National Board Inspection Code SRV Testing and SRV lift devices – (2013) TEST MEDIUM AND TESTING EQUIPMENT Each valve shall be tested to demonstrate the following: 1. Set pressure (as defined by the valve manufacturer and as listed in NB- 1B, Pressure Relief Device Certifications); 2. Response to blowdown, when required by the original code of construction; 3.Seat tiqhtness; and 4.For valves designed to discharge to a closed system, the lightness of the secondary pressure zone shall be tested as required by the original code of construction.

MEC-TRIC AVK Valve In Place Test System National Board Inspection Code SRV Testing and SRV lift devices – (2013) LIFT ASSIST TESTING a)A device may be used to apply an auxiliary lifting load on the spring of a repaired valve to establish the set pressure in lieu of the tests required in NBIC Part 3, 4.5.1a) when such testing at full pressure: 1) may cause damage to the valve being tested; or 2) is impractical when system design considerations preclude testing at full pressure. b)While actual valve blowdown and valve performance characteristics cannot be verified, valve set pressure may be determined to an acceptable degree of accuracy using this testing technique provided, as a minimum, that: 1) equipment utilized is calibrated as required in the quality system; including, but not limited to: a. System pressure measurement equipment; b. Lifting force measurement equipment : and c. Other measuring elements required by the device manufacturer.

MEC-TRIC AVK Valve In Place Test System National Board Inspection Code SRV Testing and SRV lift devices – continued LIFT ASSIST TESTING (continued) 2) the device and test procedures that have proved to give accurate results are used and followed; 3) a static inlet pressure is applied with the test medium specified in NBIC Part 3, ; and 4) adjustments are made in accordance with the valve manufacturer's recommendations to ensure proper lift and blowdown. c) Prior to use, all lift assist devices shall be qualified by the certificate holder to ensure that the equipment A13 and testing procedures will provide accurate results when used within the ranges established for that equipment used for verification testing as specified in the quality system or comparisons to field performance. This qualification shall be documented and provisions made to retain such documentation for a period of at least five years after the lift device is retired. Documentation of this qualification shall include but not be limited to;

MEC-TRIC AVK Valve In Place Test System National Board Inspection Code SRV Testing and SRV lift devices – continued LIFT ASSIST TESTING (continued) 1)A description of the lift assist device including model number, seria l number and manufacturer 2) Size and pressure ranges of valves to be tested with the lift assist device and the test fIuid to be used. Note; Maximum set pressure is determined by available lift force and system pressure. 3) Accuracy of pressure measuring equipment; 4) Method of qualifying. d) After initial qualification of the device the device shall be re-qualified if: 1)Modifications or repairs to the device are made Which would affect test results 2) The manufacturer issues a mandatory recall or modification to the device which will affect test results.