Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.

Slides:



Advertisements
Similar presentations
Tevatron Beam Diagnostics: Boosting Collider Performance Vladimir Shiltsev, Ron Moore, Andreas Jansson FNAL/Accelerator Division.
Advertisements

Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Run II Status and Prospects - Spalding1 Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
Round table magnet discussion and conclusions CARE-HHH IR’07 animated by W. Scandale and F. Zimmermann.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
LARP Accelerator Systems : “home work” Vladimir Shiltsev bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
Director’s Review 5/5/03 Spalding1 The Run II Upgrade Program Director’s Review May 2003 Program of upgrade projects in MI-Accumulator-Tevatron and the.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
 Good  LARP has grown significantly in size since it started  Gained credibility both here and at CERN US Labs like it as a way to support work CERN.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
LARP Accelerator Physics 19 June 2008 LARP+LAUC DOE Review, LBNL Wolfram Fischer/BNL BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
FP7 - IA EUROLUMI Network Walter Scandale, Frank Zimmermann ESGARD-OMIA meeting CERN,
Luminosity expectations for the first years of CLIC operation CTC MJ.
Eric Prebys, Program Director US LHC Accelerator Research Program (LARP) 10/24/2008 Ultimate tribute Sept 10, 2008.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
F LHC Accelerator Research Program Accelerator Systems Tanaji Sen FNAL/APC  Project management  Accelerator Physics  Instrumentation  Beam commissioning.
View From CERN Summary of Upgrade Projects:  Phase 1 IR upgrade: construction project  LINAC4: construction project  Phase 2 collimation: design finalization.
Frank Zimmermann, LHCb Upgrade Meeting Overview of LHC Machine Upgrade Plans from an LHCb Perspective - Frank Zimmermann LHCb Upgrade Meeting CERN, 5 August.
ERHIC design status V.Ptitsyn for the eRHIC design team.
LHC Commissioning & Upgrades LHC Commissioning & Upgrades as part of LARP Accelerator Systems Vladimir Shiltsev FNAL/AD bnl - fnal- lbnl - slac US LHC.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
LARP Accelerator Systems 6-Year Plan FY09-FY14 10 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Fermilab Run 2 Accelerator Status and Upgrades
Status of Head-on Beam-Beam Compensation BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program A. Valishev, FNAL 09 April 2009 LARP CM12.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Eric Prebys LARP Program Director January 14, 2009.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
Can PD/8 GeV Linac Help Tevatron ? Can PD/8 GeV Linac Help Tevatron ? Vladimir Shiltsev AD/Tevatron.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
DA  NE Status Report P. Raimondi Scientific Committee Nov-2005.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
Electron lens studies in support of RHIC / LHC Wolfram Fischer 28 July 2010 Fermilab Accelerator Advisory Committee Meeting.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
Turnaround time in modern hadron colliders & store-length optimization
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Status of HESR 18th March Gießen Dieter Prasuhn.
contribution to the round table discussion
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
LHC schedule.
Overview Summer student lectures 2016
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LHC Beam Operations Past, Present and Future
Summary Thursday h21: Stable beams fill #1303.
Large emittance scenario for the Phase II Upgrade of the LHC
Presentation transcript:

Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems

APEX Mtg 11/02/ Shiltsev 2 In short FY06 goals 725 / 580 pb-1 Delivered 620 pb-1 FY07 goals ~1750 / 760 pb-1 Delivered by Nov.1 50 pb-1 Yesterday, CDF Detector celebrated 2fb-1 of data delivered ! 

APEX Mtg 11/02/ Shiltsev 3 Pbar production task force initiated Dec-Feb 2006 Best luminosity before shutdown: –171e30 cm-2s-1 –25 pb-1/week Shutdown to Upgrade D0 detector Mar-June 2006 Fast start up (<2 weeks) Rush of records: 171  182  191  205  228  229e30 Current best: –store 229.0e30 (avg CDF & D0) –week 33pb-1 –month ~120pb-1 Average store hrs (longest 54hrs), ~ hrs/week 36x36 bunches ~270e9 p/bunch, 60-80(max) pbars/bunch Details

APEX Mtg 11/02/ Shiltsev 4 Reduction of beta* to 28 cm Sep’05 ~8 % Pbar production task forceFeb’06 ~10 % Tevatron 150 GeV helix  more p June’06 ~10 % Tev collision helix  lifetime July’06 ~15 % New RR WP  emittances, lossSep’06 ~25 % D0 luminosity counters rescaledOct’0615/2=8% Improvements over last ~1yr

APEX Mtg 11/02/ Shiltsev 5 Content

APEX Mtg 11/02/ Shiltsev 6 Pbar production (not cooling!) : –still less 20e10/hr Beam-beam effects in Tevatron: –Ksi~0.025 for pbars  losses/emittances –Ksi ~0.015 for protons  losses/emittances Availablity: component failures  no L time –10/30/06 - ??11/08/06?? Tev Cryo vacuum –10/09/ /23/06 Tevatron Q,D,spool –02/23/06 - Tev magnet failure, early Shtdn start –01/14/ /27/06 Tev magnet –01/03/ /06/06 AA magnet –11/22/ /12/05 Tevatron magnet Plus, power glitches, etc: –Jul-Aug’06: 45 stores, 15 aborts/quenches –Sep-Oct’06: 36 stores, 17 aborts/quenches Major Limitations

APEX Mtg 11/02/ Shiltsev 7 Content

APEX Mtg 11/02/ Shiltsev 8 Pbar production: –AA optics –Faster AA to MI to RR transfers (<15 min) –Pbar Target optimization New Tevatron WP: –To improve luminosity lifetime (less losses, no dEmm) –Allow higher Np and Na Next Steps (till ’09?) (yr?) V.Lebedev

APEX Mtg 11/02/ Shiltsev 9 Content

APEX Mtg 11/02/ Shiltsev 10 STATE of LARP …after Doe Review Jun’06 LHC Upgrades Workshop in Spain, Oct’06 LARP Collaboration Meeting at BNL, Oct’06 Executive Committee Mtg, Oct’06

APEX Mtg 11/02/ Shiltsev 11 LARP Accel Systems Progress ‘06 Schottky being baked, will go into LHC tunnelSchottky being baked, will go into LHC tunnel TCFB: success at SPSTCFB: success at SPS 4 long-term hardware SLAC joins commissioning forces to open in Nov’07, new - LAFS RC work at full speed, a lot of changes, delay SPS beam studies: BBQ PLL, Q’ head-tail, bent crystal, etc Wires built for RHIC tests # of LARP presentations at Valencia workshop

APEX Mtg 11/02/ Shiltsev GHz Schottky Detector

APEX Mtg 11/02/ Shiltsev 13 PLL Success on SPS Ramp

APEX Mtg 11/02/ Shiltsev – First Year of “Deliverables” “Hard deliverables” are the projects which CERN needs but can not back-up itself in case of failure (thus, special attention and protection needed): –Lumi Monitors for 2 IPs (2007) –Tune Feedback (2007) –Beam Commissioning ( beyond) –Phase II rotating collimators prototype (2009)

APEX Mtg 11/02/ Shiltsev 15 Accelerator Systems FY07 Priorities 1.Lumi-Monitors: construct, install, start commissioning 2.Tune&Coupling FB: deliver design, participate in installation and commissioning 3.Schottky: participate in installation and commissioning 4.Hardware Commissioning: execute current plan – SAFELY! 5.Beam Commissioning: develop acceptable/detailed execution plan for FY08+ by ~mid-07 (more from BNL!) 6.Physics experiments: RHIC (BBLR), Tevatron(PLL), ecloud 7.Other tasks: execute Task Sheet’s Plans

APEX Mtg 11/02/ Shiltsev 16 CARE–HHH: upgrades discussed IR Upgrade: – both quad first paths NbSn, NbTi Magnet R&D… Magnet R&D… Magnet R&D – D0 3.5m from IP –<1mrad Crab Crossing not excluded Low cost, potential high gain: – low-noise feedback – collimator schemes (RC, LEL, Crystals) – beam-beam compensation schemes (W,LEL) Upgrade of Injector Chain: – new Linac, PS+, PS2 – SPS+ incl. SF-SPS

APEX Mtg 11/02/ Shiltsev 17 RHIC BBLR wires – assembly wires (2.5m long) with strong-back (-profile) 7 support points NEG coated chambers during assembly

APEX Mtg 11/02/ Shiltsev 18 Things not in FY’07 budget Project Reason Longitudinal Density Monitorbudget Fast Magnet Ramp Measurement Systembudget Crab Cavity – hardware part budget E-lensesbudget Bent Crystal collimation (see below)too early LER-LHC 1.5TeV (see below)little $$ Optical Stochastic Coolingtoo big for LARP

APEX Mtg 11/02/ Shiltsev 19 Summary: DoE Review was (overall) successful LTVAC started Instrumentation tasks are of the highest priority in FY’07 Constrained by budget, #of tasks dropped Plans to further improve CERN-LARP communication