Plug-compatibility interface for Input Coupler LCWS13-AWG7-SCRF H. Hayano 11132013.

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
CC2 Input Coupler Introduction, Installation, & Processing Tim Koeth November 16 th, 2005.
3.9GHz Coupler Cold End Robustness Study Will Couplers survive on-site and overseas shipping? D. Olis, G. Galasso, M. McGee.
Christopher Nantista ML-SCRF Technology Meeting July 28, 2010 REPORT.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
ESS cavities interfaces
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
A general comment first: The questions ITRP has posed to the proponents focus largely upon technical issues for the linear collider. These are important.
Plug compatibility Document ILC10 cavity integration session H. Hayano.
1.3GHz Input Coupler for ILC
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
Tuner & LLRF of ILC Sun YI (孙毅)、 Wang Guangwei (王光伟) Lin Haiying (林海英)、 Qiu Feng (邱丰) Dec.7, th workshop of KEK/IHEP on ILC.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Hamburg European Linear Collider Workshop ECFA LC2013 Krzysztof Krzysik XFEL AMTF Cavity and Module RF Measurement Procedures.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cold BPM development in KEK H. Hayano, March 2011 Jung Keun Ahn (PNU), Sun young Ryu (PNU), Eun San Kim (KNU), Young Im Kim (KNU), Jin yeong Ryu (KNU),
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Overview of Main Linac Cryomodule (MLC)
Dmitry Gudkov Phase correction of the CLIC TBM in CLEX Dmitry Gudkov Wilfrid Farabolini.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Overview Step by step procedure to validate the model (slide 1 and 2) Procedure for the Ql / beam loading study (slide 3 and 4)
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Two-beam module layout
Areal RF Station A. Vardanyan
CERN – Zanon discussions
Cryomodule test stand at ESS site
Re-entrant BPM R&D for ILC Main Linac
ILC-SCRF Test Facilities considerations
T5.2: Harmonization - Material and Component Reference
Development of X-band 50MW klystron in BVERI
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
RF interlocks for higher intensities (LMC 15 June)
Physics design on Injector-1 RFQ
XFEL cavities and cryomodules measurements at AMTF
SNS Fundamental Power Coupler History
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
ILC Cryogenics -- Technical Design Report Planning
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
SPS-DQW HOM Measurements
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Accelerator Physics Particle Acceleration
System tests at CEA O. Piquet 19/03/2019
V. Veshcherevich Cornell University
Cryomodule Test Schedule
Cryomodule Design for CW Operation 3.9 GHz considerations
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

Plug-compatibility interface for Input Coupler LCWS13-AWG7-SCRF H. Hayano

In order to allow various designs for sub-components to work together in the same cryomodule, In TDR (1)Cavity Resonator interface, (2)Helium tank interface, (3)Fundamental-mode input coupler interface, have been agreed upon. Coupler interface are as follows;

3 (1) Cavity Resonator Interface (2) Helium Tank Interface

(3) Fundamental mode input coupler interface Cavity interface Cryomodule interface Waveguide interface

Coupler interface

Interface to power distribution waveguide 6 Power and phase into the coupler is adjustable. Coupling adjustment is by the coupler.

7 TDR coupler specification table Need to check (big difference from my description) +/-10mm antenna penetration, by remote actuator Al2O3 with TiN coated in vacuum side

8 Example of high-power process stand TDR coupler process flow The typical conditioning procedure is to raise the RF power and pulse width in steps from near zero to predetermined maximums, avoiding out-gassing in excess of a prescribed vacuum trip level ( ∼ 2 × 10−7 mbar). The RF pulse width starts from 20 μs, and is then increased to 50, 100, 200, 400, 800, 1300, and 1500 μs. The entire procedure is automated.

End of slide