KTAG Mechanics, Optics and Cooling Progress and Schedule NA62 CEDAR Meeting 26March20121.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
Cooling Update (May 2011) Tim. Overview From last time – Estimate Power Loads Active components Extraneous heat sources – Develop methodology for exploring.
CEDAR Cooling (CEDAR Meeting 23 rd May 2011) Tim Jones.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
CEDAR Support Structure and PMT Test Peter Sutcliffe 13 th July 2011 CERN via EVO.
Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group.
BioWin ®. Bio Gas – The alternative energy source of the future! BioWin ® - Bio Gas Analysis of the future!
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Design Progress Allen Ellis 18-September
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
AMS-RICH Detector. J. Berdugo – CIEMAT (Madrid, Spain) 1 AMS-02 Phase II Flight Safety Review AMS Ring Imaging CHerenkov PURPOSE: 1.Precise measurement.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Status of NA62 straw electronics Webs Covers Services Readout.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
RICH Installation and integration in CLAS12 October 13 th 2015 D. Orecchini, S. Tomassini 1 CLAS12 RICH- Mid Term Review.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
KTAG Mechanics, Optics and Cooling Progress and Schedule NA62 CEDAR Meeting 3May20121.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Installation of the T600 at Fermilab CSN2, September 22,
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
September 2007SLAC IR WS Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY Talks by M. Morse, W. Wierba, myself.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Francois and Lau EATM 17 July 2012
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
cooling and supports of the forward endcap EMC
Performance of an Automated Water Based Cooling System for CBM MuCh
LHC Experimental Vacuum Systems Status October ‘07
Mini-drawers, FE-ASIC , Integrator
Vertex Detector Mechanical R&D Design Questions and Issues
Pierre-Alexandre Thonet
Work flow Lyon Karlshrue 14/11/2018 Nick Lumb Preparation (no TEC)
UK CMS Oversight Committee Mtg
NPS mechanical design 01/31/2019 Jlab meeting
JLAB CHL 2K COLD BOX REPLACEMENT
Presentation transcript:

KTAG Mechanics, Optics and Cooling Progress and Schedule NA62 CEDAR Meeting 26March20121

KTAG Schedule for Technical Run Build stage-1 detectorJanuary 2012 to July 2012 – Half detector (4 octants)[Incorporate improvements later] – 32-channel readout[Final design is 64] – Preliminary optics [defer cost and complexity] NA62 Detector ActivitiesJune – December 2012 – DCS (Detector Control )15 – 30 June – Dry run and DAQ integration15 – 31 July – Install KTAG & IntegrationAugust - September – Technical Run12 October – 9 December – Data to understand beam backgrounds, finalise Mechanics & Optical design and understanding of DAQ & Electronics for 2014 NA62 CEDAR Meeting 26March20122

3 Lightguide, PMTs, Electronics Support cylinder bolted to CEDAR Cooling block Lens Mirror ATEX nitrogen Enclosure Support Frame

Liverpool Design and Fabrication DesignFabrication – Support TubeIn CERN awaiting work on CEDAR Nose – Light guide 1Tooling and methodology complete Cut and polish cones end of March – Remaining 3 lightguides End of April (Mylar inserts mid May) – Complete Detector FrameworkParts and brackets end of March – Optical support cylinderCompletion end of April – ATEX-2 chamber & supportsCompletion end of April – Lens & mirror mounts - MarchOutside company – April – Cooling assembly – AprilCompletion end of May (in house) – Environmental Case & Frame Preliminary design of case – MarchOrder materials & agree schedule end March Installation Frame – end MarchCompletion end of May (in house) Final design of case - mid AprilDelivery end May by outside company – Lightguide & electronics box – AprilComponents (outside company) – May NA62 CEDAR Meeting 26March20124

5

6

Development Work Gluing conical inserts Measuring reflectivity Cooling and Chiller NA62 CEDAR Meeting 26March20127

Gluing method Standard aluminium surface preparation – Degreasing – Abrading and removing loose particles or – Anodising with phosphoric acid Mylar mounting - vacuum pen development NA62 CEDAR Meeting 26March2012 8

Reflectivity measurement Variable – divergence lens system. The divergence angle θ increases as the positive element is moved toward the input by the distance x. G. A. Massey, Beam Diverging Lens System for High Power Laser Transmitters, Applied Optics, Vol. 11, Issue 12, pp. 2981_1-2981_1 (1972) NA62 CEDAR Meeting 26March2012 (small-angles) 9

Draft Chiller Requirements (March 2011) T rise0.5deg C0.25deg C0.10 deg C Bore4mm6mm8mm4mm6mm8mm4mm6mm8mm Flow Pressure Tabulate Flow and pressure for different bores of the internal pipe work and desired temperature rise Chiller Specifications (preliminary web-trawl) ModelPowerFlow 0 bar)Pressure (bar) Fryka DLK  C Grant RC350G 20  C lpm) Neslab Thermoflex 900/P2 40  C 12.5 bar)7 bar Jubalo FC600S 20  C Cole-parmer WU  C Lauda WK 20  C10 10NA62 CEDAR Meeting 26March2012

Thermo-Scientific (NESLAB) Two product lines – ThermoFlex (5 models: 0.75kW to 4.4kW) ‘newer’ 5C to 40C P2 pump gives 4.1b Eg. ThermoFlex 1400 (1170W) = £3,773 + VAT (28 days) – Merlin (5 models: 0.74kW to 4.8kW) ‘older’ – only some models now available -15C to 25C P2 pump gives 4.2b Eg. M33 (1142W) = £4241+VAT (35days) 11NA62 CEDAR Meeting 26March2012

The Small Print... Auto-restart – Both can be configure to re-start if mains power is interrupted. Communications (optional?) – RS232/485 I/O (optional?) – Merlin: 12/24V remote start/stop + external RTD – ThermoFlex: 15-pin I/O connector Relays for: low level, pump on/off, low flow + 2 configurable Remote start/stop 10mV/deg C analogue output of temperature 10mV/deg C remote set point (eg 200mV=20deg C) 12NA62 CEDAR Meeting 26March2012

Liverpool Assembly & Testing NA62 CEDAR Meeting 26March201213

Assembly Frame with Support Tube NA62 CEDAR Meeting 26March

15NA62 CEDAR Meeting 26March2012 Lightguide, PMTs, Electronics Support cylinder bolted to CEDAR Cooling block Lens Mirror ATEX nitrogen Enclosure Support Frame

16NA62 CEDAR Meeting 26March2012 Environmental Cover Light-tight Thermally insulated Faraday cage Fire resistant

Liverpool Assembly Assembly Frame with Support CylinderComplete Detector Support Frame (2 halves)End April ATEX enclosure and Mirror mountsEarly May Lightguides and PMT housings (1 half)Mid May Electronics & Octant wiring (1 half)End May Cooling panels, chiller & PT100’sEarly June Cabling and patch panels (1 half)Mid June Environmental Enclosure (2 halves)Mid June Mechanical installation testEnd June External cabling to EE patch panelEarly July Temporary LED system and System testJuly Pack and ship to CERNEnd July NA62 CEDAR Meeting 26March201217

UK Goals for Technical Run K+ Identification: measurement of efficiency for K and π – Measure normalisation: Actual light/MC light – Measure shape & distribution of light spot – compare with MC Thermal Environment – Measure temperature and temperature gradient – Establish operating parameters for Chiller Assess effectiveness of Monitoring & LED systems Electronics – PMT rates, saturation, cross talk, time resolution – Trigger, DAQ, links to central control – CEDAR motor control and display Beam measurement programme NA62 CEDAR Meeting 26March201218