DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:

Slides:



Advertisements
Similar presentations
The Single European Sky ATM Research (SESAR) initiative
Advertisements

17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
SESAR and ASAS Opportunity
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
6th Framework Programme Thematic Priority Aeronautics and Space.
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
Sixth Framework Programme INTRODUCTION . Contents Contents of FP6 Instruments in FP6 Financing Budgets Timetable Highlights.
SESAR Single European Sky Air traffic management Research
Brussels December 5,20021 New Technologies and Airport Management Presented by Cesare Bernabei Università di Piacenza & Politecnico di Milano January.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
David Bowen Head of ATM Operations and Systems
EPATS Conference ILA, Berlin, May 28, 2008 Welcome to the EPATS Project Krzysztof PIWEK, EPATS STUDY Project Coordinator, Institute of Aviation, Poland.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Towards Implementation of ASA/GSA Package I” Pieter van der.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
András Siegler - ERTRAC National Platforms Workshop, Budapest, 5/9/2008 The role of Technology Platforms in European Research ERTRAC National Platforms.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Building the Europe of Knowledge Proposals for the 7 th Research Framework Programme
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space, sponsored by EC, DG TREN Contract FP Internet:
Piemonte Workshop 1 11 September 2006 Paolo Salieri European Commission DG ENTR-H4 Security research in FP7.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
CHARM Pre Commercial Procurement Support of Cooperative ITS Functions Ian Chalmers Highways Agency P4ITS Network Meeting Brussels Feb 2015.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
Federal Aviation Administration AP23 : a snapshot on Package2 ASAS-TN2 Seminar 14 April Paris By Dragos Tonea, Eurocontrol Roberta Massiah, FAA.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems EU environmental research : Part B Policy objectives  Lisbon strategy.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
© EUROCONTROL European Air Traffic Management Programme The European ATM Master Plan ASAS TN Dave Young, Business Dev. Manager, EEC.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
A Technology Partnership for the New Millennium Anne Harlan, Director William J. Hughes Technical Center 68th NASAO Annual Convention September 20, 1999.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Strategic European Road Research Programme (SERRP IV)
European Commission 1 Interoperability of Air Traffic Management systems for the Single European Sky.
EUROPEAN REGIONAL DEVELOPMENT FUND CLUE final conference, 24 September 2014, Turin EU Interregional Cooperation State of play and perspectives Johanna.
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
ASSTAR Overview Jean-Marc Loscos, DSNA
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Regional Research-driven clusters as a tool for strenghthening regional economic development: the FP7 Regions of Knowledge Programme and its synergies.
National planning for Open Research euroCRIS 2017, 30 May 2017
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Ground System implication for ASAS implementation
OptiFrame WP1: Project Management
ASSTAR Project Overview & User Forum Objectives
The Single European Sky Implementation Programme: SESAME
The ERA.Net instrument Aims and benefits
FAA and JPDO ASAS Activities
Directorate-General Energy and Transport
ICAO Forum on Integration and Harmonization of NextGen and SESAR into the Global ATM Framework 8-10 September 2008 Lex Hendriks Deputy Director DAS, EUROCONTROL.
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements: Dream or Reality Expectations of the European Commission

DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels Objective Support Community Policy l Achievement of ‘Single Sky’ l Support Decision Making l Standardisation Speed up development of European ATM l Paradigm Change l Common European Approach l Introduction of New Technologies l Change of Responsibilities l European Architecture Encourage Co-operation

DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels Goals ATM Research goals l Safety l Capacity l Efficiency and reliability l Maximize airport operations in all weather conditions

DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels 6th FP - ATM Programme New Generation ATM l Co-operative Air Traffic Management l Advanced Airborne System Applications l Reduced Separation Minima Airport of the Future l Airport Efficiency l Advanced Surface Movement Guidance and Control Systems l Technologies for Advanced Approach and Landing Innovative Air Traffic Management and Research Co-ordination Action

DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels New Generation ATM - C-ATM Large scale live trial validation of an Integrated concept: l Optimise task distribution between air and ground l 4D trajectories and Airborne Separation Assurance System (ASAS Package 1) l System Wide Information Management l Collaborative decision making l Strategic dynamic layered planning system Three Phases: l Planning, Concept and initial validation l Validation, System integration and initial development l Integration, Trials and Dissemination.

DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels New Generation ATM - C-ATM Expectations l Operationally driven: service providers, airlines and industry are essential; research centres in support l Air / Ground integration a priority l Concentrated on few locations and associated platforms l Full ASAS Package 1 l Dual Link capability for ADS-B applications l 4D Trajectory Capability l System Wide Information Management l Validation oriented to implementation decisions l Technology activity oriented to live operations

DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels Advanced Airborne System Applications “Develop and validate Airborne Separation Assurance Systems (ASAS Package 2 & 3)” Increased airborne responsibility for separation Enhancement and optimisation of ground and air data processing systems Advanced procedures and support tools for pilots and controllers Increased automation based on integration of on- board CNS and 4D trajectory information New Generation ATM

DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels Reduced Separation Minima “Safely reduce separation minima to increase system capacity ” Reappraisal and revision of current standards Development, analysis and modelling of new air to air and surface separation standards Justify proposed changes through safety, efficiency and economic cases New Generation ATM

DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels Expectations l Critical review of current separation standards and their justification l Coherent methodology for the definition of separation minima l Proposal for revised standards based current capability and coherent assumptions l Identification of and proposals for separation minima required for new operational concepts l Recommendation for validation (safety, capacity, efficiency ….) Reduced Separation Minima New Generation ATM

DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels Airport of the Future - A-SMGCS Efficient use of existing runway and taxiway infrastructures whilst harmonising European airport environments (common requirements) Surveillance and control systems Planning and routing functions Field trials with test aircraft

DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels Joint Co-ordination Body - JCB n Set up by the European Commission to better co-ordinate the various EC funded ADS-B projects (RTD and TEN-T), and increase synergies. l Chair: European Commission l Secretariat: Eurocontrol (ADS Programme) l Participants: NUP II, Medup, MFF, MA-AFAS, DADI II, GTG, MAEVA, Eurocontrol ADS Programme, AGC, COSPACE, CARE-ASAS, AEA, IATA n Role: To provide a co-ordinated ADS-B focus and provide input to: l European Commission - Industry Consultation Body. l Eurocontrol - ATM/CNS Consultation Group (ACG)

DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels Joint Programme Board EC and Eurocontrol to create a Joint Programme Board to manage their RTD programmes jointly: l European master plan l Alignment to the Strategic Research Agenda l Control of 75% of European ATM RTD funding Ultimately management of EC projects to be carried out by Eurocontrol programme managers