The User-friendly On-line Diffusion Chamber Jaime E. Avilés Acosta August 13, 2015.

Slides:



Advertisements
Similar presentations
Legacy Hardware and Software Upgrade Overview
Advertisements

Introduction to Operation of the XL-30 Scanning Electron Microscope Tutorial # 1 Overview of XL-30 Microscope Control Program.
OL 750 Diffuse Spectral Reflectance Measurement System
PSSC Space Instrument Laboratory Plasma instrument calibration system provides an ion beam of energy range up to 130keV/charge in a clean room To develop.
O. Stézowski IPN Lyon AGATA Week September 2003 Legnaro Data Analysis – Team #3 ROOT as a framework for AGATA.
Members: Morgan Muren Matt Nusbaum.  To develop an apparatus that can test the spin down characteristics of a cup anemometer and record and display the.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Controlled Scanning of Microtiter Plates through the Use of LabVIEW® Erica Chin Anton Edmund Samir Laoui May 14, 2008.
Progress and New Results from the H-1NF Scanning Interferometer Scott Collis, George Warr, John Howard.
Introduction to LabVIEW Seth Price Department of Chemical Engineering New Mexico Tech Rev. 10/5/14.
The DESY Gas Monitor Detector (GMD) at the SXR beamline at LCLS Stefan Moeller, LCLS Kai Tiedtke, Svea Kreis, Fini Jastrow, Andrei Sorokin (DESY) Michael.
Instruments for Radiation Detection and Measurement Lab # 3 (1)
Proton Source Repairs Dan Bollinger 2/1/10. Cockcroft-Walton accelerators FNAL has 2 Cockcroft-Walton Pre-accelerators (Pre-acc) that provide beam to.
V1: HMFR, V2: MFNB, 2007 LabView Seminar University of Puerto Rico Mayagüez Campus.
Hands-On Microsoft Windows Server 2008
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Threshold ionization mass spectroscopy of radicals in RF silane discharge Peter Horvath 5/19/2004 Progress of experiments.
The User-friendly On-line Diffusion Chamber Jaime E. Avilés Acosta.
Stephen Schuh Vacuum Controls Hardware 27 February 2006 LCLS Vacuum Controls Hardware Meeting 27 February 2006.
DIFFERENCE BETWEEN ORCAD AND LABVIEW
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
IMPLEMENTATION OF SOFTWARE INPUT OUTPUT CONTROLLERS FOR THE STAR EXPERIMENT J. M. Burns, M. Cherney*, J. Fujita* Creighton University, Department of Physics,
CH10: Delivering the System help users to understand and feel comfortable with our product * Training * Documentation TECH Computer Science.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
CERN ISOLDE / HIE ISOLDE 1 Isolde Target Modulator Prototype development prepared by T. Gharsa TE-ABT-EC CERN.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
Troubleshooting and Performance
Proposal for Experiment S291: " Residual radioactivity induced by U ions - experimental investigation and longtime predictions" GSI, Darmstadt: G.Fehrenbacher,
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Beam diagnostics in the beamlines
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
19-September-2007 Helsinki EURISOL-EURONS Town Meeting 1/6 High-Performance Pulsed-Power for Radioactive Ion Beams HP 3 RIB Luis Redondo ISEL, IST, CFNUL,
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Threshold ionization mass spectroscopy of radicals in RF silane discharge Progress report 11/19/2003 Contributors: Alan Gallagher Peter Horvath Karoly.
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Water Flow GROUP A. Analogue input voltage results: Motor Input voltage( V) pin 12 Analogue input voltage (V) Display number
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Lifetime Measurements.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
LIST status and outlook Sven Richter for the LIST-, RILIS- and Target-Collaborations 21 st of August 2013.
Welcome to the CHARMS See – Tea Saturday, March 05, 2016 Comparison of ISOLDE yields with calculated in- target production rates Strahinja Lukić,
Installation of the T600 at Fermilab CSN2, September 22,
Geiger counter NTHU General Physics Laboratory
TE-MPE-CP, RD, LHC risk review 06-Mar R. Denz TE-MPE-CP Radiation Hardness of Cold By-pass Diodes Acknowledgements: D. Hagedorn (former project.
NUMI Primary Beam Review August 14, 2001 NUMI PRIMARY BEAM INSTRUMENTATION Multiwires, Loss Monitors, Toroids Gianni Tassotto.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Atmega328p Introduction for Digital and PWM Output Brion L Fuller II Robotics Club.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
NATIONAL INSTITUTE OF NUCLEAR PHYSICS Legnaro National Laboratories Numerical simulation strategy for the SPES FEBIAD ion source INFN – CISAS collaboration.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Fighting f-factors and implantation damage in emission Mössbauer spectroscopy Haraldur Páll Gunnlaugsson* The Mössbauer collaboration at ISOLDE CERN The.
PANDA Collaboration Meeting, GSI November 2010 H.O. Cluster-Jet works at GSI Herbert Orth, GSI Darmstadt, Germany Title.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
H - ion source at the pre-acc R&D lab Update HINS Meson meeting January 20 th, 2011 L. Prost, C. Schmidt, D. Bollinger, R. Tomlin.
CONFIDENTIAL MATERIAL Michele Togno - II Annual ARDENT Meeting, Milan – October, 14 th D Ionization Chambers Array for Clinical Applications.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
AN INTRODUCTION Jaime Avilés Acosta. WHAT IS ISOLDE?  Isotope Separator On-Line DEvice  Dedicated to producing radionuclides  Applications in nuclear.
SANE Magnet Review ● Repaired polarized target magnet was successfully energized and put in persistent mode on 12/18/08 after the review, following the.
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
New hardware and software were created to support the solid DT direct heating work A Cernox RTD thermometer was mounted inside the DT cell, 1 mm behind.
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
A fixture designed to provide high precision, high throughput routine spatial characterization of the Xoft Axxent™ X-ray source Linda Kelley, Steve Axelrod,
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
Computed Tomography (C.T)
Presentation transcript:

The User-friendly On-line Diffusion Chamber Jaime E. Avilés Acosta August 13, 2015

Outline 1)The experiment 2)My project 3)Project progress 4)Future prospects for the On-line Diffusion Chamber (ODC) 2

The Experiment Built in 2009, the ODC is a stand-alone apparatus for radiotracer diffusion studies Designed to make measurements as fast as possible Spectrum Master X-Cooler II 3

The Experiment Spectrum Master X-Cooler II 4

Annealing Target annealed to diffuse implanted radioisotopes The Experiment Spectrum Master X-Cooler II 5

Ablation Argon gas is ionized and then accelerated with a 60 kV potential Ion gun ablates target’s surface Ejected material and implanted radioisotopes cling to tape The Experiment Spectrum Master X-Cooler II 6

Tape transport and diffusion profiling Tape moves over gamma detector Detector records intensity of radiation over time Data are used to build a diffusion profile of the radioisotope in target. The Experiment Spectrum Master 7

What’s so special about the ODC? Direct access to on-demand production of radionuclides at ISOLDE All peripherals are run only with a LabView program, automating as much as possible to save time. The Goal 8

The purpose of the ODC is to carry out studies with short-lived radioisotopes or nuclear isomers (half-lives in tens of minutes) However, the ODC was too unwieldy and complicated for visiting researchers to carry out experiments in a short period of time. The Goal 9

The purpose of the experiment is to do studies with very short- lived radioisotopes or nuclear isomers (half-lives in minutes or less) My Project Make the ODC mobile and easier to plug-in/plug-out of beam line Calibration of peripherals (ion gun, Ge detector, Faraday cup, etc.) Improve execution timing of LabView code of Virtual Instrument that controls ODC peripherals Test apparatus with stable beams and radioactive isotope beams— compare results to offline diffusion apparatus 10

Software Changes Added annotations throughout the LabView block panel (the “code”) Wrote an in-depth guide to explain how it works Removed unnecessary flat-sequence structures to enable parallel processing Faraday Cup on the ODC couldn’t extend fully due to a series of misused variables and booleans, now replaced 11

Software Changes Most of the time, the program periodically scans for output from all the peripherals and stores the data Modified the code to add a timing functionality to see if changes in the code improved execution timing Scanning time improved by an average of 161 ms Numerous other miscellaneous changes—all changes have been logged for future reference 12

Hardware Changes Assembled a new three-phase plug for the ODC’s controller rack Added two pressure gauges and two needle gauge displays Added a turbo motor pump Added a halogen LED inside the chamber Installed heavy duty wheels (no more forklifts needed!) Calibrated Faraday Cup pre-set positions and the target holder’s origin’s position (0 mm) Attached cooling fan to turbo motor pump 13

Hardware Issues Ge gamma detector spectra showed semi-sinusoidal shaped noise Tried to bias detector with different HV supplies with no luck Warmed and cooled down detector again over a 48 hour period Feedback from Ortec DSPEC Jr signal processor suggested power failure Used a HV supply with an ammeter—current wouldn’t drop despite increasing voltage The above suggests a short-circuit in detector 14

The Future of the ODC Ge gamma detector will be sent to GSI for further diagnosis and for repairs A draft of a complete user guide for the ODC will be compiled Future students will finish calibrations, tests, and improvements (with the help of new documentation, of course) A much more user-friendly ODC will allow future users to use it for studies with short-lived radioisotopes during their short stays at CERN 15

Acknowledgement My adviser, Karl Johnston Torben Molholt Haraldur “Palle” Gunnlaugsson João Guilherme The rest of the staff at The University of Michigan Indiana University Bloomington University of Saarlandes 16

Questions? Spectrum Master X-Cooler II