THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.

Slides:



Advertisements
Similar presentations
Data Acquisition Concepts Data Translation, Inc. Basics of Data Acquisition.
Advertisements

FF-1 9/30/2003 UTD Practical Priority Contention Resolution for Slotted Optical Burst Switching Networks Farid Farahmand The University of Texas at Dallas.
Connectivity Lab University of California, Berkeley Location and Timing with C/A code in GPS Wanbin Tang Jan 24, 2007.
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
TRIO-CINEMA 1 UCB, 2/08/2010 STEIN Intro Davin Larson Space Sciences Laboratory University of California, Berkeley.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
THEMIS MISSION PDRESA- 1 UCB, November, 2003 ESA Plasma Instrument Mission PDR Dr. C. W. Carlson and Themis ESA Team UC Berkeley SSL.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
Electricity and Circuits Electrical energy or electricity is produced by the movement and distribution of these charged particles 1.
Wireless Intelligent Sensor Modules for Home Monitoring and Control Presented by: BUI, Phuong Nhung, 裴芳绒 António M. Silva1, Alexandre Correia1, António.
DCH Requirements b Process at a rate fast enough to maintain all data storage and command handling tasks. b Have sufficient storage space to hold the OS,
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes Sept. 2008EFW INST+SOC PDR253 Data Controller Board FPGA Dorothy Gordon UC Berkeley.
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
1Sep 30-Oct 1, 2009EFW I-CDR Instrument Critical Design Review EFW Flight Software Peter R. Harvey 2009 Aug 31 RBSP Radiation Belt Storm Probes RBSP Radiation.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
TRIO-CINEMA 1 UCB, 2/08/2010 Cinema Stein Interface FPGA (CSI) [Part II] Karthik Lakshmanan CINEMA - EE Team Space Sciences Laboratory University of California,
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
THEMIS Workshop 1 UC Berkeley, 18 December 2004 Data Products and Access Tim Quinn UC Berkeley.
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
THEMIS SRR 1 UCB, June 8-9, 2003 Solid State Telescope Davin Larson SSL.
ATtiny23131 A SEMINAR ON AVR MICROCONTROLLER ATtiny2313.
THEMIS IDPU FSW 11/29/ UCB THEMIS IDPU FSW V4 Mission Profile Tests Peter Harvey Michael Ludlam.
THEMIS ESA SWT ESA- 1 UCB, Aug ESA In-Flight Calibration and First Results J. McFadden, C. Carlson, D. Larson UC Berkeley SSL.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
STEREO PLASTIC PLASTIC: The Plasma and Suprathermal Ion Composition Investigation on STEREO A.B. Galvin, E. Moebius, L. Kistler, M. A. Popecki, J. Quinn.
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
EFW SOC DATA John Wygant SWG June Redondo Beach.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Operational Concept.
Characteristics of remote sensing satellites. Satellites generally vary in their architecture Usually remote sensing satellites are having two plateforms.
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
SST- Solid State Telescope ESA - Electrostatic Analyzer Science Measurement and Operational Requirements.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
ISUAL System Design H. Heetderks. PDR 31 August 2000NCKU UCB Tohoku ISUAL System Design H. Heetderks 2 ISUAL Operations Overview.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
TRIO-CINEMA 1 UCB, 2/08/2010 ACS Dave Auslander, Dave Pankow, Han Chen, Yao-Ting Mao, UC Berkeley Space Sciences Laboratory University of California, Berkeley.
8th Cross-calibration Workshop CIS data delivery report Kinsale – October 2008.
Status of CIS Calibration Work Iannis Dandouras and the CIS Team presented by: Harri Laakso 3 rd CAA Cross-Calibration Meeting MSSL, October 2006.
THEMIS Instrument CDR 1 UCB, April 20, 2004 Actel Reliability Critical Design Review Robert Abiad University of California - Berkeley.
Solar Probe Plus – FIELDS Main Electronics Package
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
FGM CDR FGM Electronics (FGE) Ronald Kroth MAGSON GmbH Berlin Germany.
University of California - Berkeley
PAD SELECTION QUALITY FLAG STATUS
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
University of California - Berkeley
Cluster Active Archive – Wideband data BM2 mode
Data handling, timing and power distribution scheme
Introduction Molecules: made up of atoms of individual elements.
SP+ DFB REE 12/01/12.
Boom Electronics Board (BEB)
ISUAL Associated Electronics Package
Preliminary Design Review
THEMIS INSTRUMENT TRAINING
GPM Spacecraft Ethernet Study
ARDUINO     What is an Arduino? Features 14 Digital I/O pins 6 Analogue inputs 6 PWM pins USB serial 16MHz Clock speed 32KB Flash memory 2KB SRAM.
CubeSat vs. Science Instrument Complexity
CONTOUR NGIMS Electronics Test History
Presentation transcript:

THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley

THEMIS Instrument PDR 2 UCB, October 15-16, 2003 Overview Overview of ETC Interface with particle instruments Processing of particle data Passing data back to DCB (main processor)

THEMIS Instrument PDR 3 UCB, October 15-16, 2003 Connections Instrument and DCB interfaces ESA commanding –ETC acts as translator –ESA & SST data collected –ETC collects data and processes it ESA & SST spin sectoring Other signals –SST commanding from the DCB –ESA & SST analog housekeeping wires to the DCB –SST clock from the DCB

THEMIS Instrument PDR 4 UCB, October 15-16, 2003 Connections DCB ETC SST ESA 8MHz EANA_HSK SANA_HSK ECMD_GATE ECMD_DATA ECMD_CLK ETLM_DATA ETLM_CLK STLM_REQ STLM_DAT TLM_DATA ETC_CMD SST_CMD SPIN/16384 SPIN/32 Shared board POR_L SPIN

THEMIS Instrument PDR 5 UCB, October 15-16, 2003 Instrument Interfaces Instrument interface protocols ESA command interface ESA telemetry interface

THEMIS Instrument PDR 6 UCB, October 15-16, 2003 Instrument Interfaces Instrument interface protocols SST command interface SST telemetry interface

THEMIS Instrument PDR 7 UCB, October 15-16, 2003 Processor Interfaces Processor interface protocols ETC command interface ETC telemetry interface

THEMIS Instrument PDR 8 UCB, October 15-16, 2003 Requirements Data production Slow Survey - 13 moments/data type (2 species x 2 instruments) Slow Survey - Reduced angle distribution/data type/Nspins Fast Survey - Full angle distribution/data type/Nspins Burst - Full angle distribution/data type/spin

THEMIS Instrument PDR 9 UCB, October 15-16, 2003 Requirements Moments There are 13 moments calculated for 4 different data types Moments are calculated using an entire spin of data  represents the 32 spin angles (64 in ESA Solar Wind mode)  represents elevation angle - 4 for SST and 16 for ESA E represents particle energy -16 for SST and 32 for ESA

THEMIS Instrument PDR 10 UCB, October 15-16, 2003 Requirements Moments (cont.) C is the count of particles at a particular field of view. This data comes from the instruments.  is the solid angle. This value is programmed into a lookup table by the processor. WP is a combined weighting and spacecraft potential correction. This value is calculated in the ETC using lookup tables and the equation: Where V is the spacecraft potential and N=0-3

THEMIS Instrument PDR 11 UCB, October 15-16, 2003 Distributions Purpose –Measure full particle angular distributions with equal solid angle resolution. Polar angle measurements are combined to produce equal solid angle bins and to reduce data volume. Full Distributions –ESA sees 512 fields of view in a spin (32 spin phase x 16 elevation angles). This gets reduced to 88 angle bins. –SST sees 128 fields of view in a spin (32 spin phase x 4 elevation angles). This gets reduced to 64 angle bins. –Solar wind mode gives higher angular resolution Reduced Distributions –For survey data covering more of an orbit due to low bandwidth –ESA and SST data reduced to 8 angle bins. –Electron pitch angle distributions Requirements

THEMIS Instrument PDR 12 UCB, October 15-16, 2003 Distributions (cont.) Burst Distributions –Burst are identical to full distributions in angular and energy makeup, but recorded every spin. All data will be converted from X bits to Y bits using a pseudo square-root compression scheme Use lookup tables to do angle translations Requirements  

THEMIS Instrument PDR 13 UCB, October 15-16, 2003 Electrical Diagram 128k SRAM Actel A54SX72S-CQ208 DCB AddrData 54AC24454AC14 52 ESA SST

THEMIS Instrument PDR 14 UCB, October 15-16, 2003 Electrical Diagram

THEMIS Instrument PDR 15 UCB, October 15-16, 2003 Processor Requirements Table Loading 31 tables totaling 45 kBytes –4  - computed on board –8 distribution lookup tables - loaded from ground –5 exponential lookup tables - in EEPROM –14 energy lookup tables - computed on board Commanding 1 spacecraft potential command/spin Less frequent setup commands –Number of spins to collect data –Number of angles data is being binned into Maintaining collected data 13 DMA channels to mass memory Inserting headers into data

THEMIS Instrument PDR 16 UCB, October 15-16, 2003 Processor Requirements

THEMIS Instrument PDR 17 UCB, October 15-16, 2003 Power Power estimation Actel 205mW + 2 SRAM (25mW/MHz) 50mW + Transceivers 20mW = 275mW

THEMIS Instrument PDR 18 UCB, October 15-16, 2003 Schedule Board design Due to finish by October 31 Actel design and debug November 1 - January 31

THEMIS Instrument PDR 19 UCB, October 15-16, 2003 Simulation, Simulation, Simulation GSE + DCB light DCB to load tables and issue commands GSE to produce a known data set in instrument form DCB to receive data and pass it on to GSE GSE to collect data and put it into computer Testing Plan

THEMIS Instrument PDR 20 UCB, October 15-16, 2003 Issues Evolving requirements Need for core requirements separate from enhancements Additional duties