View from CERN CM11 in FNAL; 27. & 28. October 2008 Finalization of existing deliverables :  Installation of LHC luminosity monitors for 2009 run  Prototype.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
Stefano Redaelli Beam Department - Operations Group Operational Aspects of the Phase II Crab Cavity System LHC-CC09 3 rd LHC Crab Cavity Workshop European.
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
The Stripping Foil Test Stand in the Linac4 Transfer Line
View From CERN Summary of Upgrade Projects:  Phase 1 IR upgrade: construction project  LINAC4: construction project  Phase 2 collimation: design finalization.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Eric Prebys/LARP 2/17/2016.  CERN has taken unprecedented steps to control information about this event, including altering the electronic LHC log to.
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
Draft MD Planning Thu (3.11.) DayTimeMDMP Thu05:00 Ramp down, cycle 07: GeV: Injection stability and losses – check steering constraints, define.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
WP2: Beam dynamics and optics Workflow between Work Packages 1 O. Brüning – BE-ABP WP2 HL-LHC meeting 17. November 2011.
LHC Machine Operational Status and Plans LHCC, 22nd September 2010 Steve Myers (On behalf of the LHC team and international collaborators)
08/11/2007M. Giovannozzi – CARE-HHH-APD IR’071 Optics issues for Phase 1 and Phase 2 upgrades Massimo Giovannozzi, CERN Outline: –Option for Phase 1 and.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
LHC Commissioning Status Gianluigi Arduini CERN – AB Department For… 23/10/20081LHC Commissioning Status - G. Arduini.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
Luminosity monitor and LHC operation
Operating IP8 at high luminosity in the HL-LHC era
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
contribution to the round table discussion
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
LHC Commissioning with Beam
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
LHC schedule.
The LHC - Status Is COLD Is almost fully commissioned
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
Powering the LHC Magnets
Large Booster and Collider Ring
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Status of the BLHC ….work in progress! Mike Lamont CERN/AB 18/01/2008
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Intensity Evolution Estimate for LHC
CSP Meeting CERN CERN Accelerators in th November 2010
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Overall commissioning strategy for protons (estd. 2005)
LHC Beam Operations Past, Present and Future
Summary Thursday h21: Stable beams fill #1303.
SLHC-PP kick-off meeting, CERN 9 April 2008
Collimators: Operations - Baseline Assumptions
Thursday Summary of Working Group I
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Beam commissioning plans, 2007 and 2008
LHC Machine Advisory Committee, CERN 12th June 2008
Review of hardware commissioning
Presentation transcript:

View from CERN CM11 in FNAL; 27. & 28. October 2008 Finalization of existing deliverables :  Installation of LHC luminosity monitors for 2009 run  Prototype of rotatable collimators  Nb 3 Sn magnet R&D with long prototype by 2010 Success of the above deliverables is vital for successful launch of new production projects! Oliver Brüning/CERN AB-ABP 1

View from CERN CM11 in FNAL; 27. & 28. October 2008 Oliver Brüning/CERN AB-ABP 2 New initiatives at CERN:  Studies at CERN lack resources and offer interesting areas for US contributions.  Help is desired in form of studies (USLARP) and hardware production and prototyping (APL)

LHC Upgrade Plans and New Initiatives CERN New Initiatives LHC Insertion:  LHC IR Upgrade –Phase I project lead by Ranko Ostojic LHC collimation:  Phase 2 collimation project lead by Ralph Assmann LHC injector complex:  LINAC4 project lead by Maurizio Vretenar  PS2 design study lead by Michael Benedikt  LSPL design study lead by Roland Garoby  SPS upgrade study team lead by Elena Shaposhnikova CM11 in FNAL; 27. & 28. October 2008 Oliver Brüning/CERN AB-ABP 3

Goals for the LHC Phase 1 IR Upgrade Main milestones (Lyn):  develop short Nb-Ti magnet prototype by middle  full length prototype by  installation by 2013  requires proposal for Phase 1 upgrade magnets by 2008  July review at CERN: -120mm diameter with 120 T/m gradient. -Modular design with equal magnet length. -Cold D1 magnets. -No other modifications of matching section magnets.  Phase I IR upgrade will be implemented in parallel with the LINAC4 startup (availability of higher beam brightness). CM11 in FNAL; 27. & 28. October 2008 Oliver Brüning/CERN AB-ABP 4

Goals for the LHC Phase 2 IR Upgrade Phase II Identify new IR layouts and magnet technologies that allow a ten fold increase in the nominal LHC luminosity:  Prepare a solution that can withstand the radiation for operation with L = cm -2 sec -1  The Phase II upgrade should be implemented once the Phase I solution reaches the end of the magnet lifetime (700 fb -1 )  after 4 to 5 years of the Phase I upgrade operation assuming the Phase I operation reaches L = cm -2 sec -1  earliest installation by 2017  requires substantial R&D  There are currently 2 options under study:  25 ns option using integrated ‘slim magnets’ inside the detectors  50ns option using above ‘ultimate’ beam intensities CM11 in FNAL; 27. & 28. October 2008Oliver Brüning/CERN AB-ABP 5

General Upgrade Study Topics There are several beam dynamic studies that could be beneficial for all upgrade Phases:  Long range beam-beam wire compensation.  Electron lenses for head-on beam-beam compensation.  CRAB cavities and CRAB waist operation.  Studies related to absorbers and magnet protection.  Studies related to the suppression of the electron cloud effect.  Upgrade studies for the LHC injector complex (e.g. space charge limitations).  Studies related to understanding the beam-beam effects and limits.  Studies related to understanding limits imposed by chromatic aberrations.  Studies of diffusion and loss mechanisms and their impact on collimation  LHC impedance and beam stability CM11 in FNAL; 27. & 28. October 2008Oliver Brüning/CERN AB-ABP 6

Priorities for New Production Projects Priority guidelines:  Priority 1: New initiatives production projects (IR upgrade & LINAC4) with clear deadlines and specifications (e.g. magnets for Phase 1 IR upgrade)  Priority 2: Injector upgrades and studies for LHC IR upgrades that go beyond Phase 1 IR upgrade goals and where parameter specifications are well advanced (e.g. SPS upgrades; PS2)  Priority 3: future upgrade plans where parameters have not yet been well defined (e.g. Phase 2 collimators) or where still substantial R&D efforts are required (e.g. CRAB cavities and LHC electron lens) CM11 in FNAL; 27. & 28. October 2008 Oliver Brüning/CERN AB-ABP 7

View from CERN: new initiatives CM11 in FNAL; 27. & 28. October 2008 New initiatives at CERN:  Studies at CERN lack resources and offer interesting areas for US contributions.  Seek synergies between studies where possible (e.g. e-cloud simulations and e-cloud feedback studies). Role of JIRS and interface with team at CERN!!! Oliver Brüning/CERN AB-ABP 8

Potential US contributions for Phase I upgrade CM11 in FNAL; 27. & 28. October 2008 Oliver Brüning/CERN AB-ABP 9 APL:  cold D1  feedbox with cryogenic link  collimators USLARP (JIRS?):  lattice tunability studies  DA, field quality specifications and tracking  collimator efficiency  heat deposition studies

Potential USLARP activities for PSII CM11 in FNAL; 27. & 28. October 2008 Oliver Brüning/CERN AB-ABP 10 APL:  40 MHz RF system  Laser H - ion stripping USLARP:  40 MHz RF system (still requires R&D)  Lattice design (review planned for 2009)  Non-linear dynamics and MTE  Collimation system design and efficiency studies  Impedance and instabilities

Potential USLARP activities for other New Initiatives CM11 in FNAL; 27. & 28. October 2008 Oliver Brüning/CERN AB-ABP 11 Phase II upgrade:  CRAB cavity design / production (USLARP & APL)  Rotatable collimators (USLARP / APL)  e-cloud feedback system (USLARP / APL)  electron-lens (USLARP / APL) LINAC4:  Laser profile monitor (APL) SPL:  high power vector modulator (APL)  700 MHz super conducting RF modules (APL)

Status of the LHC Machine ‘2008 Agenda and Events’ O. Brüning CERN, Geneva, Switzerland A Very Eventful First Year!

On Behalf of the whole LHC Commissioning Team Oliver Brüning/CERN AB-ABP 13 CM11 in FNAL; 27. & 28. October 2008

Contents LHC Layout Oliver Brüning/CERN AB-ABP 14 Events at the End of September and implications on 2009 operation. Beam Commissioning in September Synchronization tests in August and September CM11 in FNAL; 27. & 28. October 2008

Status at the Beginning of 2008 Oliver Brüning/CERN AB-ABP 15 Installation: 2002 to 2008 Issues related to QRL installation:  required partial re-installation of installed QRL line in 78 Issues related to the triplet magnets:  decision to cool arc without triplets (arc 78 and 45) implied a warm up at later stage Deformation of the RF fingers in the interconnects Hardware commissioning identified weak elements in arc 78:  one dipole limited to 2kA and QF/QD limited to 6.5kA  implied an intervention (warm up) at later stage Successful transfer line commissioning CM11 in FNAL; 27. & 28. October 2008

Main Events in 2008 First magnet powering in the tunnel: quench tests with large ‘string’; synchronous powering of complete arc system; de-training ‘Synchronization tests’ with beam: first beam steering in injection area; first beam induced quench; inject & dump test Commissioning with beam: first turn; orbit correction; aperture verification; tune measurements; optics checks; RF capture with 20 min+ beam life time Tunnel closure: 5. September - LHC access control enters operational phase Machine cool down: 22. August - all sectors simultaneously at 1.8K; 30. August first cryo OK for complete machine 19. September Oliver Brüning/CERN AB-ABP 16 CM11 in FNAL; 27. & 28. October 2008

De-Training Effect for Quench Levels  The LHC magnets have a higher quench level after thermal cycle as compared to 1 st virgin quench The gain is the larger the lower the 1 st virgin quench  However, Noell magnets shows some anomalous behavior  Detraining looks worse for the Sector 56 data   decision to perform hardware commissioning in 2008 to 5.5 TeV A. Siemko at MAC 23 Oliver Brüning/CERN AB-ABP 17 CM11 in FNAL; 27. & 28. October 2008

In sector 5-6 five symmetric quenches were observed after quench propagation caused by a thermo-hydraulic wave  One quench (in B16.R5 at ~7.4 kA) has developed the high “MIITs” and resulting high hot spot temperature required modifications to the quench protection system! Phenomenon of Symmetric Quenches A.Siemko at B.MAC 23 Oliver Brüning/CERN AB-ABP 18 CM11 in FNAL; 27. & 28. October 2008

Ramp of 138 power converters to a current equivalent to 5.3 TeV (including all high current magnets realistic LHC optics ) 19 February 2008,15:00 commissioning team Oliver Brüning/CERN AB-ABP 19 CM11 in FNAL; 27. & 28. October 2008

Synchronization Tests With Beam Oliver Brüning/CERN AB-ABP 20  Synchronize SPS extraction with LHC injection kickers Adaptation of timing controls  Magnet polarity verification of injection line and first LHC sectors Sorted out several polarity errors (data base)  Aperture scans Identified aperture bottle neck in injection area (vacuum valve) First beam induced quench  BPM & BLM verification Concentrators, data base, thresholds Sorted out several BPM errors  Inject & dump mode Dump kicker timing 9/10 August 23/24 August 9. September CM11 in FNAL; 27. & 28. October 2008

Synchronization Tests With Beam  First Beam in the LHC: Injection area (Sept, kicker and TDI) Oliver Brüning/CERN AB-ABP 21 CM11 in FNAL; 27. & 28. October 2008

Synchronization Tests With Beam  First Beam to IR3: First trajectory steering onto collimator in IR3 Oliver Brüning/CERN AB-ABP 22 CM11 in FNAL; 27. & 28. October 2008

Synchronization Tests With Beam  First Beam to IR3: Beam stopped on collimator jaw Oliver Brüning/CERN AB-ABP 23 CM11 in FNAL; 27. & 28. October 2008

Synchronization Tests With Beam  First Beam to IR3: Kick response  excellent fitting tools! Oliver Brüning/CERN AB-ABP 24  First Beam to IR3: Dispersion orbit measurement  polarity errors V. Kain J. Wenninger V. Kain J. Wenninger CM11 in FNAL; 27. & 28. October 2008

Synchronization Tests With Beam  Injection region aperture verification: Aperture limitation due to vacuum valve Oliver Brüning/CERN AB-ABP 25  MADX online model B. Goddard Ilia Agapov CM11 in FNAL; 27. & 28. October 2008

Synchronization Tests With Beam  Arc aperture verification: Kick measurements  aperture and coupling Oliver Brüning/CERN AB-ABP 26 R. Callaga, M. Giovannozzi et al. CM11 in FNAL; 27. & 28. October 2008

Synchronization Tests With Beam  First Beam to IR3: First trajectory corrections and beam induced quench: ‘quenchino’ Oliver Brüning/CERN AB-ABP 27 CM11 in FNAL; 27. & 28. October 2008

Summary Synchronization Tests Extremely useful exercise: last minute fixes to software (timing), powering data base (polarities), functionality checks (BPM and BLM), Removal of aperture bottle necks (vacuum valve alignment) Tools: extremely useful due to availability of excellent analysis tools (YASP, MADX online model; fitting tools for kick response & BPM data analysis); successful validation of LSA First beam induced quench: BLM calibration!, verification of ‘safe beam’ intensities Oliver Brüning/CERN AB-ABP 28 Procedures: validation of key procedures (synchronous powering of circuits and collimators); access system and beam interlock system CM11 in FNAL; 27. & 28. October 2008

LHC Startup 10. September Oliver Brüning/CERN AB-ABP 29 CM11 in FNAL; 27. & 28. October 2008

LHC Beam Commissioning:  10. September: Established 1. Turn for Beam 1 Established 1. Turn for Beam 2 Established circulating beam for Beam2  Following days: RF capture Beam 2; Klystron based RF system! Noise + feedback loops  First beam measurements Orbit correction Tune & coupling measurement Optics verification via kick-response Oliver Brüning/CERN AB-ABP 30 CM11 in FNAL; 27. & 28. October 2008

First Turn  First & Second Turn on screen  First Turn on BPM system Oliver Brüning/CERN AB-ABP 31 Jörg Weninger Courtesy of Roger Bailey CM11 in FNAL; 27. & 28. October 2008

Closed Orbit and Kick Response for Full Machine Oliver Brüning/CERN AB-ABP 32 YASP by Jörg Weninger CM11 in FNAL; 27. & 28. October 2008

RF Capture:  Captured Beam Current  Mountain Range display DESY – Zeuthen Seminar; 14. & 15. October 2008 Oliver Brüning/CERN AB-ABP 33 Ed Chiapal

Beam Current Transformer and Beam Lifetime:  BCT versus bunch number and time: ca. ½ h beam lifetime! Oliver Brüning/CERN AB-ABP 34 CM11 in FNAL; 27. & 28. October 2008

Tune and  -beat: Oliver Brüning/CERN AB-ABP 35 R. Thomas Jörg Weninger R. Steinhagen CM11 in FNAL; 27. & 28. October 2008

First Beam Seen by the Experiments Oliver Brüning/CERN AB-ABP 36 CM11 in FNAL; 27. & 28. October 2008

Summary Beam Commissioning Extremely successful start-up!! Made possible by: Meticulous preparation Accurate magnetic model Dry runs (parallel ‘operation’ and hardware commissioning) Synchronization tests Powerful control system and tools and a highly motivated team!!! Beam Commissioning stopped on Friday 12. September: Transformer failure on Friday evening (12 MVA) Loss of cryogenics in point 8 (  Arcs 78 and 81) Replacement could be found in CMS installation Several days of access in LHC site Ready for beam by 18. September (started injection tests for Beam 1) Oliver Brüning/CERN AB-ABP 37 CM11 in FNAL; 27. & 28. October 2008

LHC Incident in Sector 34 CERN Press Release from : Geneva, 20 September During commissioning without beam of the final LHC sector (Sector 34) at high current for operation at 5 TeV, an incident occurred at mid-day on Friday 19 September resulting in a large helium leak into the tunnel. Preliminary investigations indicate that the most likely cause of the problem was a faulty electrical connection between two magnets which probably melted at high current leading to mechanical failure. CERN’s strict safety regulations ensured that at no time was there any risk to people. Oliver Brüning/CERN AB-ABP 38 CERN Press Release from : Investigations at CERN following a large helium leak into sector 3-4 of the Large Hadron Collider (LHC) tunnel have indicated that the most likely cause of the incident was a faulty electrical connection between two of the accelerator’s magnets. Before a full understanding of the incident can be established, however, the sector has to be brought to room temperature and the magnets involved opened up for inspection. This will take three to four weeks. Full details of this investigation will be made available once it is complete. CM11 in FNAL; 27. & 28. October 2008

LHC Incident in Sector 34 Assessment as of October 2008:  Loss of ca. 6T of He inventory (ca.½ of the arc inventory).  Ca. 250 MJ of stored electromagnetic energy was ‘missing’ in the dump resistors and diodes of the quench protection system  4 short straight sections (unit of a quadrupole + corrector magnets) are affected by the incident and need to be repaired on surface  Of the order of 10 dipole magnets might be affected by the incident and need to be inspected on the surface.  Most likely cause was a bad splice between magnets  Means for detecting similar problems in the future are currently under study Oliver Brüning/CERN AB-ABP 39 Impact on Operation Schedule:  LHC operation stopped 3 month before planned operation stop.  General shutdown work at CERN was advanced by 2 month (early October).  Start-up in 2009 advanced to 1. May instead of 1. June.  Net loss of ca. 2 month of LHC operation due to September incident. CM11 in FNAL; 27. & 28. October 2008

LHC Incident in Sector 34 Assessment as of last week:  Sector 34 is now at 250K and work on the work on the magnet removal could start in November.  Data from the Joule Thomson valves might provide an early indication similar events in the future.  Looking at the Joule-Thomson valve position data from the hardware commissioning for all sectors shows that a similar signature in sector 12 as has been observed in sector 34 prior to the incident of 19. September. -> Option of additional powering checks in 12 is currently being looked at.  He in Sector 12 (and 45) has to be removed before magnets can be brought to the surface. Removal of magnets in 34 only after powering tests in 12?  Decision to modify the LHC QPS system so that the voltage drop across the splices is included in the protection chain. Oliver Brüning/CERN AB-ABP 40 CM11 in FNAL; 27. & 28. October 2008

Spare Transparencies Oliver Brüning/CERN AB-ABP 41 CM11 in FNAL; 27. & 28. October 2008

Staged Commissioning Plan for Protons Stage I IIIII No beamBeam IV Pilot physics run  First collisions  43 bunches, no crossing angle, no squeeze, moderate intensities  Push performance (156 bunches, partial squeeze in 1 and 5  L ≈ cm -2 sec -1 ) 75ns operation  Establish multi-bunch operation, moderate intensities  Relaxed machine parameters (squeeze and crossing angle)  Push squeeze and crossing angle  L ≈ cm -2 sec -1 (event pile up rate) 25ns operation I  Nominal crossing angle  Push squeeze  Increase intensity to 50% nominal  L ≈ cm -2 sec -1 25ns operation II  Push towards nominal performance Oliver Brüning/CERN AB-ABP 42 Courtesy of Roger Bailey Hardware commissioning Machine checkout Beam commissioning 43 bunch operation 75ns ops 25ns ops I Install Phase II and MKB 25ns ops II CM11 in FNAL; 27. & 28. October 2008

R.Bailey, Elba, May Parameter evolution and rates Parameters Beam levels Rates in 1 and 5 Rates in 2 and 8 kbkbkbkbN  * 1,5 (m) I beam proton E beam (MJ)Luminosity (cm -2 s -1 ) Events/crossingLuminosity Events/crossing << 1 Depend on the configuration of collision pattern << << All values for nominal emittance, 10m  * in points 2 and 8 All values for 936 or 2808 bunches colliding in 2 and 8 (not quite right) 5 TeV 7 TeV

Low-beta squeeze (15 independent quadrupole circuits) Oliver Brüning/CERN AB-ABP 44 CM11 in FNAL; 27. & 28. October 2008