CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee 10.1.2013.

Slides:



Advertisements
Similar presentations
Lyon 2005 DIPAC Lyon th DIPAC Lyon June 2005Ulrich Raich CERN AB/BDI Instrumentation in small, low energy machines Ulrich Raich CERN AB-BDI.
Advertisements

WG 4: High Power Proton Accelerators S. Holmes, J. Thomason PASI Collaboration Meeting April 3-5, 2013.
Commissioning LHC Beam Instrumentation for Nominal Bunch Intensities Beam Commissioning Working Group June 15 th 2010 Rhodri Jones (CERN Beam Instrumentation.
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
R Scrivens, CERN, ABI Workshop, 12/2008 The Feschenko Bunch Shape Monitor User experience at CERN Developed by INR, Troitsk. High resolution bunch shape.
Bunch shape monitor for Linac-4 A.V.Feschenko Institute For Nuclear Research (INR), Moscow , Russia.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
Ulrich RaichLinac-4 instrumentation day May 2007 Longitudinal Bunch Shape Monitor U. Raich.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
Beam Position Monitors MICE CM Harbin January, 2009.
1 Secondary Emission Beam Profile Monitor H. Haseroth, CERN.
Beam current4 A Beam pulse length1.5 ms Power input/structure 35 MW Ohmic losses (beam on)1.6 MW RF power to load (beam on) 0.4 MW RF-to-beam efficiency.
1 Linac/400 MeV BPM System Status Nathan Eddy PIP Meeting 8/8/12.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Budget Summary Linac-4 Instrumentation review CERN, Uli Raich BE/BI.
ESS DTL beam commissioning
AWAKE electron source New Electron Source WP at CERN
Laser Stripping and H 0 monitor systems 10/18/2011B.Cheymol, E. Bravin, U. Raich, F. Roncarolo BE/BI1.
Debbie Harris Sacha Kopp, Commissioning Workshop 1    Beam Monitoring Hadmon will see remnant protons Muon Monitors see whatever escapes beam.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
After last meeting Matt, Riad and I discussed January energy choice…  Focus on Physics paper measurements  Focus on 5 MeV systematics  Pick “final”
Beam Instrumentation for Future High Intensity Hadron Accelerators at Fermilab Manfred Wendt Fermilab 8/25/2008HB2008 WG F: Diagnostics1.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Beam diagnostics in the beamlines
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
The Stripping Foil Test Stand in the Linac4 Transfer Line
DEVELOPMENT OF A BEAM LOSS DETECTION SYSTEM FOR THE CLIC TEST FACILITY 3 T. Lefevre Beam loss monitors for the CLIC Test Facility 3 Preliminary study done.
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Working Group 5 ProjectX Collaboration Meeting April 12-14, 2011 Summary Talk M. Wendt and W. Blokland Controls, Instrumentation & Protection.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
ApEx needs for CeC PoP Experiment December 11, 2015.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
Overview of Present and Future Laser Diagnostics for Fermilab H- Accelerators Vic Scarpine, Fermilab Presenting for the H- laser diagnostics team 26 Sept.
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
European Spallation Source Diagnostics Challenges Lali Tchelidze AD retreat, Lund, Sweden,
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
Experience with beam instrumentation at Linac4
J. Alexander + Cornell accelerator group Cornell University
Beam Diagnostics Instruments
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE-BI Software for LINAC4
F. Zocca, F. Roncarolo, B. Cheymol, A. Ravni,
LINAC 4 source & LEBT measurement results
LINAC4 LEBT beam size and emittance diagnostics
Linac 4 Devices Controls and Monitoring Status
LINAC4 commissioning plans etc.
Proton Beam Diagnostics
Sensitivity tests of BLM_S chamber in PSB dump
commissioning and measurements
Presentation transcript:

CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee

2 BPM SLITS BCT SEM Grids H+V SEM Grid H BSM Halo Monitor

Instruments to be commissioned BPMs: –First tests have been made on Linac-2 –ToF completely untested yet –Problems seen in intensity measurements (signal is lower than predicted by simulations) –Time estimated for commissioning: 2 months, can be done parasitically without disturbing other measurements –Incompatible with emittance measurements CERN, 29.January 2009Uli Raich AB/BI

Emittance meter Emittance Meter: Only movements have been tested Experience with 45 keV emittance meter should help 1 week commissioning before measurements can be made Possible problems: –alignment of the slit –heating CERN, 29.January 2009Uli Raich AB/BI

Bunch Shape Measurements BSM: Device is fully mounted including electron multiplier Has been tested without beam as far as possible Commissioning needs: 2 weeks with presence of colleagues from INR Focusing of secondary electrons needs to be adjusted RF tests not yet done CERN, 29.January 2009Uli Raich AB/BI

Transformers BCTs: Tests have been made in beam with 45 keV protons Calibration needs to be improved Comparison measurements Faraday Cup / Transformer at 45 keV Estimated commissioning time: 1 week but parasitic measurements are possible any time Incompatibility with emittance meter CERN, 29.January 2009Uli Raich AB/BI

Halo Monitor Halo monitor: Can only really be tested with chopper Some preliminary tests may be possible before To be discussed with M. Hori CERN, 29.January 2009Uli Raich AB/BI

Laser stripping Profile measurements using laser stripping: Only possible on H- beams with reasonable intensity Laser can be borrowed from Rutherford Lab. Need to know if tests can be foreseen until May 2013 Can be run parasitically without disturbing other measurements Incompatible with emittance meter CERN, 29.January 2009Uli Raich AB/BI

Spectrometer Needs spectrometer SEMGrids. Has been done at 45 keV 1-2 days should be sufficient to make the SEMGrids work CERN, 29.January 2009Uli Raich AB/BI