NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.

Slides:



Advertisements
Similar presentations
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Advertisements

SCED Power Balance Penalty Curve
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
TPTF Presentation Registration of PUN Facilities December 19, 2007.
ORDC Phase 2 Analysis Summary Wholesale Market Subcommittee March 4, 2015 David Thompson.
Real-Time Transmission Congestion Management & Market Effects
February 2012 CMWG Constraints Competitiveness Tests (CCT)
SBBH Flag Implementation QMWG October 11, SBBH Flag - Background SBBH Flag - Background: –The SBBH acronym stands for “SCED Base Point Below HDL”
March 30, 2015 SCED Event Follow up: Proposed Improvements QMWG, May 08, 2015.
MISUG Meeting Materials ERCOT 10/16/ Agenda 10/16/ Antitrust AdmonitionJ. Lavas 9:30 a.m. 2.Introduction/Agenda OverviewJ. Lavas 9:35 a.m.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
August 16, 2007 EDS Workshop Texas Nodal Market Implementation MMS FAT Testing for Accelerated SCED Mark Patterson, Manager Market Operations Support.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
1 Market Trials Open Market Participant Call Weekly Kick Off Sept 27, 2010.
SCED Security Constrained Economic Dispatch Linear vs. Quadratic Programming Model.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
April 28, 2008 Constraint Competitiveness Tests, an Overview Congestion Management Working Group.
1Texas Nodal Market Trials Update. 2Texas Nodal LFC Testing Review Review of materials presented at TAC Changes in Market Trials schedule and activities.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
Congestion Management Working Group WMS update 11/7/2012.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
CMWG Update to WMS Report of CMWG Meetings of &
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Price Correction Process Resmi Surendran QMWG 04/10/2015.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
1 WMS Report TO TAC April 2007 (which is in March)
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
1 Nodal Stabilization Market Call December 27, 2010.
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
Constraints Competitiveness Tests (CCT) Results Analysis of 2010 SSWG Peak Summer Case Presented to CMWG 1/27/2010.
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
A Broad Review of August 13, 2015 and Similar Historical Situations Luminant Energy January 22, 2016.
CMWG Update to WMS Report of CMWG Meeting of
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Proposal for Consideration Regarding Holistic Solution to Congestion Irresolvable in SCED Issue:How do you identify when constraint is irresolvable Proposal:Adopt.
WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Valley Import Constraint Resmi Surendran. Valley Import Constraint Range of SFs – to in valley area – 0.03 to outside valley area Not.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
TAC Rejection of NPRR Mitigated Offer Caps for RMR Units
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
PRS Rejection of NPRR Mitigated Offer Caps for RMR Units
Congestion Management and Ramp Rate for Delivering Ancillary Services
Presentation transcript:

NPRR 520 Resmi Surendran ERCOT

Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month to feed the results to Daily CCT (DCCT). Currently ACCT & MCCT results are set to CSC/CRE from 2010 For each Operating Day (OD), DCCT runs the day before the OD using the COP data from peak hour of the OD and post results by 6 AM the day before OD Evaluate ECI at export and import side with WGR at zero output at import side

Current SCED 2-Step Process STEP1 - Resolves competitive constraints using submitted energy offer curves to produce Reference LMPs Prior to STEP2 – Irrespective of presence of non-competitive constraints, mitigate ALL online resources – Offer curve capped at Max(Ref LMP, Mitigated Offer Cap) – Offer curve bounded at Min(Ref LMP, Mitigated Offer Floor) STEP2 – Resolves both competitive & non-competitive constraints using mitigated (capped/bounded) energy offer curve to produce Base Points and LMPs

Offer Mitigation

NPRR 520 Run CCT on active constraints every 5 min to identify which constraints to be considered as competitive and which Resource to be mitigated Competitiveness in SCED CCT is determined using import side ECI and telemetered HSL of online Resources Identify DMEs to be mitigated – DME with negative-side-ECI greater than a threshold for an active non- competitive constraints or – DME which is pivotal for a non-competitive constraint as the DMEs For those DMEs, mitigate only Resources with SF > threshold

NPRR 520 Mitigate based on Min[offer, Max(Ref LMP +K1*MOC at lsl, MOC)] Apply offer floor to all resources to address predatory pricing To prevent mitigation from switching between being applied and not being applied, – once a Resource is identified for mitigation, it will be mitigated for the rest of the operating hour – Any constraint deemed non-competitive during the operating hour will not be re-evaluated and will be considered non-competitive until the top of the next operating hour

NPRR 520 Preliminary results for different thresholds

Appendix Issues addressed by NPRR 520

Over Mitigation Issue Price for capacity being set by mitigated offer Mitigation is currently applied to ALL online resources irrespective of their impact to any active non-competitive constraint Resources that were economical and hence moved up in STEP1 could be moved down in STEP2 if they have positive Shift Factor to a non- competitive constraint. Resources having no impact on the non- competitive constraints could then be moved up based on their mitigated prices to meet power balance requirement in STEP2. Offer floors for NSPIN/RUC/RMR, QSGR offers and offers submitted based on Voluntary Mitigation Plan (VMP) could be uneconomical in STEP1 but could become economical in STEP2 and hence get dispatched at mitigated price Fix: Only mitigate Resource that have significant impact to the active non-competitive constraint

Offer Mitigation Base Point Oscillation

Over Mitigation Issue Base Point Oscillation Marginal Resources could be moved around based on changes in system condition like drop in wind, unit tripping etc Offer floors for NSPIN/RUC/RMR, QSGR offers, offers submitted based on VMP increases the number of marginal Resources and hence more Resources are moved around When Reference LMP is higher than typical Mitigated offer cap, Resources with high submitted offers get mitigated at Reference LMP. Under tight system condition Reference LMP could change significantly between consecutive SCED runs causing the offers of these resources to move between economical and uneconomical with respect to other offer resulting in Base Point oscillation Fix : Base Point oscillation could be minimized by reducing the set of Resources that are subject to mitigation

Tie Breaking Issue QSGRs brought online when not needed by system “Tie breaking” logic – Even with no constraints, SCED prorates the energy awarded at Ref LMP in STEP1 to all online resources in STEP2 that have a mitigated price equal to Ref LMP When Ref LMP > typical mitigated offer cap, mitigation often results in lots of Resource offers at the same price (Ref LMP) in STEP2. All QSGRs operating with ON status (Protocol ) may receive small, non-zero Base Points requiring them to come online at LSL when they are not really needed by system which in turn causes price depression Fix : Eliminate multiple offers at same price Cap EOC at max(MOC, Ref LMP + (MOC at LSL)* K1) instead of max(MOC, Ref LMP) where K1 is significantly small, e.g Issue: Multiple QSGRs in the same location with the same MOC can still see tie- breaking impact if their MOCs are same.