Forklift pick set-up interfacing with a MCHP 39 44.

Slides:



Advertisements
Similar presentations
6x6 with articulating Center-wheel and CG Migration Team 33 Killer Bees.
Advertisements

General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Mast Storage Rack NNSY Sean Ellis, Philip Crist, Max Carpenter, Gershom Obeng.
What is a “Lift?” A Lift is a device for grabbing and moving objects in a predominately vertical direction.
Model RJ-3 System Package We offer a Res-Q-Jack™ Model RJ-3 3-point stabilization package system which includes: Qty. of (1) Jack Stand Kit with pins,
Mechanical Engineering Design Review BL ARPES Endstation Derek Yegian, Jonathan Denlinger, Keith Franck 4/18/2008.
Faculty Advisor: Dr. Han P. Bao Group Leader: Parker Harding Group Members: Christina Toroc Hunter Hughes Deborah C. McHugh.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Structural Collapse Technician Training
Distributed Loads Reference Chapter 4, Section 9
ASPIRATOR TRAINING. GENERAL LEADING PARTICULARCHARACTERISTIC FLOW Input Output TEMPERATURE Operating Range Storage Range PHYSICAL DIMENSIONS Outside Diameter.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
Team Flying Sheep Engineering Analysis Mark Berkobin John Nevin John Nott Christian Yaeger Michelle Rivero.
Bridge Design Project Using SolidWorks and SolidWorks Simulation to design, test and build structures.
Feasibility MSA P Base Plate Feasibility 3 plastics were looked at for MSA mounting board material: ABS, Acrylic, and polypropylene. Due to cost.
By: Joseph Martinez University of Michigan Supervisor: Dave Pushka, NuMI Project 3Q120-M Quadrupole Magnet Transport.
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
1 TCS Lab Motors-2 (10/20/03) Design Changes since Version-1 1)Changed Encoder: now using R135S-03600Q-5L16C18TP-04EN 2)Eliminate Outriggers: Retain bolts.
Mechanisms Paul Ventimiglia WPI Student, Team 190.
Senior Design: Validation of Design December 15, 2008.
What you need today Text Notebook Calculator (optional) 1/8” = 1’ print of foundation (basement) plan –With dimensions.
Vbine Energy Generator Assembly Pictures and Info Slide Show.
SofaKing: The Lazy-Man Futon Chris Wooldridge Loren Hankla Ankur Desai JT Stukes Barrett Evans John Pendley.
Design of a Robotic Manipulator for a Wheelchair Gateway Coalition Ohio State University Sinclair Community College Wright State University December.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
Baseline Change Request BCR Title: EBD New 6 Ton Bridge Crane Installation BCR #: N/A Presenter’s Name: Robert Law CCB Presentation Date:
EBD existing crane details and future bridge crane upgrade Alev Ibrahimov June
D-R Compressor Cell RIT Senior Design Team P13458 Systems Design Review.
Aviation Seminars1 #3661. Which items are included in the empty weight of an aircraft? A- Unusable fuel and undrainable oil. B- Only the airframe, powerplant,
Mechanics of Materials. To determine the loading on a body Draw a free body diagram indicating – external loads and moments – reaction loads and moments.
1 MC Assembly over the VV FPA Station 3 FDR Review July 17, 2007 T. Brown.
Engineering with Wood Presenters: David W. Boehm, P.E. Gary Sweeny, P.E. Gary Sweeny, P.E. Shear Walls and Diaphragms Why Buildings Don’t Fall Over.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
CPA Micarta Based Rahul Sharma / Bill Sands. The present design shown in this document is based on the use of Micarta as the base material this will likely.
MAST STORAGE RACK Philip Crist Max Carpenter Sean Ellis Gershom Obeng.
SiD Platform Deformation Studies John Amann ILC Mechanical Engineering 11/21/06.
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
Engineering Division 1 HHMI 8.2.X Endstation Modification Review Allan DeMello 12/13/2006.
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
Shear Stresses in Concrete Beams
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
Cantilever Racks Specifications Scope: This task requires the vendor to provide hardware materials for two types of double cantilever racks for use in.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Systems Level Demo P15010: Arc Wheelchair Swing. Maggie Bates BS/ME Industrial & Systems Engineering Owen Breese BS Mechanical Engineering Elizabeth Cutolo.
Week 8 Deliverables. Assisted Living Facility Visit Talked with elderly who are currently using walkers, a few who were using the same model as the one.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
A View of NCSX Structural System and Load Path for the Base Support Structure.
1 Modular Coil Assembly Fixture (MCAF) Information Meeting February 23, 2005.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD.
Structural Steel Construction
Structural Integrity UNDERSTAND STRUCTURAL STRENGTH OF LOAD BEARING COMPONENTS IN MECHANICAL SYSTEM.
Engineering Analysis & Updated Layout Drawings SofaKing 9 March 2005.
6x6 with articulating Center-wheel and CG Migration
SBN Far Detector Installation & Integration
SX1 manipulation VERSION 1 Version
Escalator Installation
SportsNet - Contingency Plan
CPA Moment on the left is ~100*150kg/2.
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
3 Types of Bridges. Complete the worksheet based on the information in this PowerPoint presentation.
STEEL PLATES.
Civil engineering drawing
3667. (Refer to Figures 33 nd 34.) Calculate the weight and balance and determine if the CG and the weight of the airplane are within limits . Front seat.
Valve stem “gag” mechanism
Unit 6 Structural Members © 2006 ITT Educational Services Inc.
Transverse Shear Objective:
Presentation transcript:

Forklift pick set-up interfacing with a MCHP 39 44

End View Front View

7 x 7 x ½” Sq tubing 1-1/4” plate MCHP storage support weldment Local holes for bolting feet at A and C MC’s Weldment weight: 1200 lbs

12860 F1 F2 24” load center Forklift capacity for different load centers Max lift at 24” load center: 27,750 lbs (per John Edwards input) F2 = 27,750 x 60 For the same moment at F2 with the load center at 39” (75” from F2) the load capacity is reduced to 22,200 lbs

39” 60” Approach A Approach B Backup slides looking at pick options 45” shown  CG of MCHP 60” 39” min

50” 88” Approach C

3584 psi 4043 psi

Wood / steel construction 8 x 8 wood beams that measure 7.5” x 7.5” 1-1/4” steel plate Additional shim stock needed here

38.8” CAD weight for MCHP and crate: 20,511 lbs note: some MCHP components may be missing Fork moved in to minimize CG distance

Top View Tilted View