Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Commercial Showerhead Research Plan RTF April 6 th, 2010 Danielle Gidding
Slide 2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N February 2010 RTF Commercial showerhead measures presented to RTF for direct install: –Hospitality (hotel/motel) –Hospitals –Small commercial employee showers RTF approved commercial deemed savings as provisional for 18 months – with BPA presentation to RTF of research/evaluation plan.
Slide 3 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Commercial Analysis – February Used residential analysis assumptions for flow rates, temperature, cost. Adjusted showerhead utilization (minutes/year) by business type
Slide 4 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Research required for full deeming in commercial applications 1.Baseline flow rate in specific commercial applications Collect pre and post flow rate upon installation for every installation 2.Usage information to determine annual utilization (minutes/year) of showerhead occupancy rates # of occupants per showerhead showers/person/day shower duration Data will be collected through PTR and evaluation
Slide 5 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N PTR Data Collection Data collected through PTR for every installation (through Direct Install) –Utility information –Building information –Building type –Equipment information Flow rate of replaced showerhead Per unit equipment cost Per unit installation/labor cost –Survey of building owners/managers Estimate of showers/showerhead/day For Hospitals/hospitality –Occupancy rates –Number of occupants/day
Slide 6 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Data True-up Secondary research for best information on –Estimate of showers/showerhead/day –For Hospitals/hospitality –Occupancy rates –Number of occupants/day –Minutes/shower Combine with PTR data to re-analyze savings, incremental costs, and cost effectiveness.