Low-Energy Linac Tanks 2, 3, 4 and 5 (3 Slides). Station 7Station 3Station 5Station 4Station 2 BPM NIM BPM NIM BPM NIM BPM NIM 172 MHz 3/8” Heliax (N)

Slides:



Advertisements
Similar presentations
Slide 1Fig. 2.1a, p.25. Slide 2Fig. 2.1b, p.25 Slide 3Table 2.1, p.25.
Advertisements

Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Microtron,TL1 and Booster Diagnostics Status Hussein AL-MOHAMMAD RF & DI Group SESAME 12 th TAC.
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
ANITA SMEX Final Presentation 2-November RF front end P. Gorham UH A N I T A.
L1 Meeting 11/4/2004 – Mario Camuyrano BLS-to-ADF Transition System 230 ns 100 mV/div 200 ns/div Existing and proposed calorimeter trigger rack layouts.
Sequential Logic Design
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Tom Kubicki.  Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Water Distribution Systems. Distribution systems Designed to adequately satisfy water requirements for combination of: Domestic use Commercial Use Industrial.
1 BROOKHAVEN SCIENCE ASSOCIATES LBT Diagnostics Installation Update Dan Padrazo Diagnostics & Instrumentation Group Feb 1, 2012.
Linac BPM Electronics Upgrade PIP Status report Elliott McCrory March 6, 2013.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
1 LIGO-G V5 LLO CDS Components Front End Computer Timing Master 18VDC18VDC I/O Extension Timing Fanout 24VDC24VDC Chassis DC Power AC VoltageAC.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
MTA BPM Electronics NIM module, 4 inputs, 2 BPMs per board Lock to external RF either 201MHz or 805MHz Single network connection reads out ~ 10 boards.
Anders Sunesson RF Group ESS Accelerator Division
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
QBPM System Installation Systems –Rack mount chassis –LO and CAL RF cable plant ( need 714Mhz from eels bedroom) –Down mix boxes –DC power cable plant.
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
G-bit ORx Sensitivity Measurement General Function Block Diagram. ORx Adapter-Board Design. Test Results. ORx 1.25Gbps, 2.5Gbps -9dBm, -12dBm,
Tests of STO IF Components S. Weinreb April 15, 2009 Two 1-2 GHz IF amplifier plates and one 5 GHz converter plate for the Texas test flight have been.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
CARE SC meeting, CERN, 13th September, Report on SRF Work-packages WP7Power Couplers WP8Tuners WP9 Low level RF WP10Horizontal Cryostat Integration.
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Prototype Sensor Status and Measurements u Sensor Response Measurements u Mechanical Response u Noise Expectations u DAQ Status.
WP8-HGA High Gradient Acceleration M. Biagini (INFN-LNF) WP8 coordinator Tiara Kickoff Meeting, CERN, Feb , 2011.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Booster bpm’s Jim Crisp 3/29/06. Plate width and linearity with the response linearized along the axis 60 and 20 degree plates become nonlinear in the.
Calorimetric Power Measurements in Xbox-1 Xiaowei Wu.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
1 st TIARA Steering Committee A. Gallo – INFN Frascati deputy of TIARA WP8 leader STATUS OF TIARA WP8.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
Heung-Sik Kang Pohang Accelerator Laboratory
Template 2 (with serif font) Click through to view sample pages.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
SESAME TL2 and SR Diagnostics
Beam diagnostics at the NICA
ESS Phase Reference Signal Distribution
Template 1 (with sans-serif font)
12.4: SRF HOM Diagnostics: Experimental Results and Future Plans
Section 5.3 Dividing Monomials
THS5671EVM Test with TSW1400EVM
WP02 PRR: Master Oscillator and RF Reference Distribution
Racks Coordination 09 September 2011 E. Negodin
RF cables calibration Matteo Volpi Thomas Geoffry Lucas
'. \s\s I. '.. '... · \ \ \,, I.
' '· \ ·' ,,,,
Additional information placed in this section as necessary
LO BOX and LO/CLK DISTRIBUTION Arash Kaftoosian ESS Bilbao, May 2018.
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Around the room Orders of operations.
Observed CE/RE Failures in the Display Product CE(Conducted Emission )
RF introduction Anders Sunesson RF group leader
Presentation transcript:

Low-Energy Linac Tanks 2, 3, 4 and 5 (3 Slides)

Station 7Station 3Station 5Station 4Station 2 BPM NIM BPM NIM BPM NIM BPM NIM 172 MHz 3/8” Heliax (N) 1/8” Hard Line (SMA) Coupler

Station ?Station 5 BPM NIM 805 MHz 3/8” Heliax (N) 1/8” Hard Line (SMA) Coupler Station 4 BPM NIM Station 3 BPM NIM Station 2 BPM NIM Splitter Attenuator

Station 2Station 5 BPM NIM 805 MHz 3/8” Heliax (N) Coupler Station 4 BPM NIM Station 3 BPM NIM BPM NIM Splitter Attenuator If Necessary LocationMinimum Power NeedRequired Power Input to BPM Modules-10 dBmVarious Sta. 2: Input to coupler10 dBm18-20 dBm Sta. 3: Input to splitter-6 dBm Sta. 3: Input to coupler14 dBm Sta. 4: Input to coupler10 dBm Sta. 5: Input to splitter-6 dBm6 dBm

High-Energy Linac Seven modules and the Transition Section, all in the Diagnostics Room. (1 Slide)

Diagnostics Room LDR-1LDR MHz BPM NIM BPM NIM “7-5" BPM NIM BPM NIM BPM NIM

Booster & Linac 400 MeV Line Two locations (4 Slides)

Debuncher Room BPM Rack ~10m BPM Rack ~40m 805 MHz Source Booster Gallery Linac Gallery Booster Gallery Plan View

Booster 400 MeV Line (Far) GR24-RR6-3GR24-RR MHz GR24-RR6-1 BPM NIM Q10 V-Q11 Q12Q13 DEB BPM NIM Q15Q16Q23 SEPU Q17 BPM NIM HSEPD PFOIL L1D L1U S01S24 BPM NIM Q6Q7Q8Q9

Booster & Linac 400 MeV (near) LG1-RR2-3 BPM NIM BPM201 BPM203BPM204 LG1-RR4-1 BPM NIM Q1Q2 LAM Q3Q4Q5

Debuncher Room 805 MHz Heliax Cable (already exists) New Heliax Cables All 400 MeV line GR24-RR6-3GR24- RR6-2 GR24-RR6-1 BPM NIM Q10 V-Q11 Q12Q13 DEB BPM NIM Q15Q16Q23 SEPU Q17 BPM NIM HSEPD PFOIL L1D L1U S01S24 BPM NIM Q6Q7Q8Q9 LG1-RR2-3 BPM NIM BPM201 BPM203BPM204 LG1-RR4-1 BPM NIM Q1Q2 LAM Q3Q4Q5

Left Right Bottom Top A0 B0 A1 B1 Back Panel of the BPM Module

Obsolete Layouts

GR24-RR6-1 GR24-RR6-3 BPM NIM 805 MHz ~0 dBm BPM NIM BPM NIM BPM NIM -9dBm ~10 dBm OBSOLETE: Nov 2012

GR24-RR MHz GR24-RR6-1 BPM NIM BPM NIM BPM NIM BPM NIM OBSOLETE: Nov 2012

LG1-RR MHz BPM NIM OBSOLETE: Nov 2012

LDR MHz LDR-1 BPM NIM BPM NIM BPM NIM BPM NIM BPM NIM OBSOLETE: Nov 2012

LDR-1LDR-0 BPM NIM 805 MHz ~0 dBm BPM NIM BPM NIM BPM NIM BPM NIM -9dBm ~10 dBm OBSOLETE: Nov 2012

LG1-RR-1 (LG1-RR2-3) 805 MHz BPM NIM ~6 dBm OBSOLETE: Nov 2012

LDR-0 805MHz805MHz LDR-1 BPM NIM BPM NIM BPM NIM BPM NIM BPM NIM LG1-RR4-1 Debuncher Room 805 MH z BPM NIM LG1-RR2-3 BPM NIM Heliax Cable (already exists) New Heliax Cables -10 dBm-0.5 dBm9 dBm -0.5 dBm20 dBm27 dBm20 dBm 0 dBm-4 dBm 100 feet 24 dBm 16 dBm Power Levels