14 th Operational-MIRS Meeting May 2 nd 2008. Agenda MIRS Status [Sid] Operational Status [OSDPD] Validation & Fine Tuning [Kevin] Quality Control [Flavio]

Slides:



Advertisements
Similar presentations
4 th DataGRID Project Conference, Paris, 5 March 2002 Testbed Software Test Plan I. Mandjavidze on behalf of L. Bobelin – CS SI; F.Etienne, E. Fede – CPPM;
Advertisements

LA County Fire Department
8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 1 RA-2/MWR Level 2 algorithms verification and products validation group status.
Status of Operational Implementation of MIRS V2.0 at OSDPD Limin Zhao, Aiwu Li and Jiang Zhao April 18, 2008.
Management Information Systems 2007 Understanding a Systems Approach to Sound Fiscal Management.
E T SMU’S PARTNERSHIP WITH NSC FOR ELECTRONIC TRANSCRIPTS JOHN HALL UNIVERSITY REGISTRAR & EXECUTIVE DIRECTOR OF ENROLLMENT SERVICES Southern Methodist.
1 eAuthentication in Higher Education Tim Bornholtz Session #47.
Requirements Structure 2.0 Clark Elliott Instructor With debt to Chris Thomopolous and Ali Merchant Original Authors.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 User Support Thomas Lindner SLAC January 16 th, 2001.
University of Michigan Administrative Information Services Merit Information HRMS Unit Liaison Meeting June 15, 2007.
University of Michigan Administrative Information Services 2006 Merit Information HRMS Unit Liaison Meeting May 19, 2006.
Using Skype for Building Effective Group Collaboration MODULE I.
SIM346. General information about the software application.
zipLogix ® Digital Ink Training Sending files to be signed using the new zipForm ® Plus Go Beyond.
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
FALCON Annual Meeting December 5 th, 2006 Jason Hitchcock USDA/CSREES Director of Information Policy.
Software Development and Release Process
Automated Benchmarking Program using ENERGY STAR™ Portfolio Manager.
DBS to DBSi 5.0 Environment Strategy Quinn March 22, 2011.
The Trimble Store and Passcodes. Introduction to Trimble Store  This presentation will: –Explain what the Trimble Store offers you –Why you need to be.
SC Websites Training of webmasters end of March/ beginning of April Validation of content in April Launching in May/ June (at the end of March, the hosting.
© 2011 Delmar, Cengage Learning Chapter 7 Managing a Web Server and Files.
MIIDAPS Status – 13 th JCSDA Technical Review and Science Workshop, College Park, MD Quality Control-Consistent algorithm for all sensors to determine.
SurplusSurplus Surplus Forum January 8, SurplusSurplus Changes at Surplus Presented by Margaret Chambers, Director.
CERN - IT Department CH-1211 Genève 23 Switzerland Service Level Status (SLS) What it does The default SLS.
Yannick Patois – Datagrid Repository Presentation- 2001/11/21 - n° 1 Partner Logo DataGrid Software Repository presentation A short presentation of the.
Lesson 2-4 Solving Equations with Variables on Both Side August 14, 2014.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
Status of MIRS Updates Kevin Garrett and Sid-Ahmed Boukabara MIRS Meeting February 15, 2008.
1 TRI-MEweb: The Future Is Now Juan Parra Washington DC November 3, 2010.
Documentation NCRR Documentation for BioPSE/SCIRun and map3d All this great software and you want documentation too!?
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
Using Skype for Building Effective Group Collaboration By JoAnn Fifield.
Introduction More delays for Flavio. Visa appointment in Mexico for Jan 9 th Likely start date: Second half of Jan. MIRS 3 rd Release delivered on.
KISTI Grid CA Operation KISTI Supercomputing Center Sangwan Kim, Soonwook Hwang CA Operators Contact: Jan. 8, 2007.
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
POLAR MULTI-SENSOR AEROSOL PROPERTIES OVER LAND Michael Grzegorski, Rosemary Munro, Gabriele Poli, Andriy Holdak and Ruediger Lang.
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
Module 8 : Configuration II Jong S. Bok
THIS PRESENTATION: WINDOWS UPDATES VIA AUTOMATIC DEPLOYMENT RULES BEST PRACTICES SYSTEM CENTER CONFIGURATION MANAGER 2012 R2 Jodie Gaver Jodie Gaver Working.
A Generalized Approach to Microwave Satellite Data Assimilation Quality Control and Preprocessing Kevin Garrett 1 and Sid Boukabara 2 11 th JCSDA Science.
Web Path Express Monthly Update Process © 2003, J McNeil. Images used for software training under license agreement. No rights granted for further distribution,
Protecting Your Computer By: Victoria Tuttle. There’s never enough you can do to protect your computer.
29 th Operational-MIRS Meeting June 12 th 2009 K. Garrett, F. Iturbide-Sanchez, C. Grassotti, and W. Chen.
National Enrolment Service (NES) Overview October 2015 – June 2016.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
Considerations for the Physical Inversion of Cloudy Radiometric Satellite Observations.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
T Project Review Muuntaja I1 Iteration
Network integration with PanDA Artem Petrosyan PanDA UTA,
MIRS Science and other Updates S.-A. Boukabara and K. Garrett.
Learning Outcomes 1. Know software installation processes 2. Be able to prepare for software installation 3. Be able to install and configure software.
Access Account Activation and Electronic Signature Web Application.
TECHNICAL QUALITY MANAGEMENT Technical Quality Management Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related.
A Physically-based Rainfall Rate Algorithm for the Global Precipitation Mission Kevin Garrett 1, Leslie Moy 1, Flavio Iturbide-Sanchez 1, and Sid-Ahmed.
21 st Operational-MIRS Meeting October 3 rd 2008.
22 nd Operational-MIRS Meeting October 31 st 2008.
User Registration in the SeaDataNet V1 system by Dick M.A. Schaap – technical coordinator Oostende, June 08.
NOAA-08: An Optimal Atmospheric Dataset for Algorithm Training and Covariance Matrix Generation Kevin Garrett, Sid-Ahmed Boukabara, and Fuzhong Weng 10.
From Source Code to Packages and even whole distributions By Cool Person From openSUSE.
Introduction to CAST Technical Support
Best practice Upgrade process
Site License Advisory Team
Banner Project Update for Division Deans
Testbed Software Test Plan Status
Introduction to CAST Technical Support
Managing a Web Server and Files
Update on Building a New Trauma Registry
Presentation transcript:

14 th Operational-MIRS Meeting May 2 nd 2008

Agenda MIRS Status [Sid] Operational Status [OSDPD] Validation & Fine Tuning [Kevin] Quality Control [Flavio] Surface Properties [Cezar] Systems & Web site [Wanchun/Sid]

General Status Extension of MIRS to SSMIS Hydrometeors Retrieval done (RWP and GWP) ECMWF extension done but data not updated. Extend Sounding Validation to SSMIS and to COSMIC data, FRCST, ATOVS Overhaul covariance matrix (clear, cloudy and rainy conditions) done (but might need further tuning) Improve Profile-to-Profile behavior of sounding Work done or close to be done:

General Status Converting an IDL code to F90 Software checking (for robustness) Fine Tuning Biases/Cov/etc to improve sounding performances for SSMIS, N18 and Metop-A Developing a general approach to QC setting based on ChiSq, Lat, Lon, Rain, Ice, QC of TB, etc Surface properties offline study & validation for SSMIS Validation of Surface properties wrt GDAS, ECMWF, ground truth (SSMIS but also N18 and Metop) Surface classification Improvement (esp. for SSMIS) Documentation Updates Work in progress:

MIRS Package/ Licensing Agreement Got the green light to distribute! License agreement sent to 5 users who requested it, for their signature STAR director has the authority to sign the license agreement. We will soon have a password protection that is different for the daily products access than for the package downloading We expect to be able to deliver the package in 2 months

Schedule Pre-release on May 15 th 2008 Official release on June 15 th 2008