SUNTHORN FAIMUENWAI TH Session 5 – Block 1 – Question 16 Barcelona 12-15 May 2003 1 TCSC as a tool to reduce the transmission congestion charge To reduce.

Slides:



Advertisements
Similar presentations
Sistan & Balouchestan Electric Power Distribution Company
Advertisements

Contingency Ranking by Time Domain Simulations ECE 422/522 Russell Patterson Micah Till Terry Jones.
Reactive Power and Voltage Control
EIUG – Wheeling Methodologies
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
Voltage Security Margin Assessment Professor Dr. Garng Huang PS ERC.
Numbers
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Lecture 9. Unconstrained Optimization Need to maximize a function f(x), where x is a scalar or a vector x = (x 1, x 2 ) f(x) = -x x 2 2 f(x) = -(x-a)
Call Admission and Redirection in IP Telephony A Performance Study Matthew Caesar, Dipak Ghosal, Randy Katz {mccaesar,
Presented by: Bikram Choudhury Regd. No. : Department of Electrical And Electronics Engineering FACTS Devices For Smart Grid 2 July 2015.
f has a saddle point at (1,1) 2.f has a local minimum at.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
The Effects of Greenhouse Gas Limits on Electric Power System Dispatch and Operations Miaolei Shao Ward Jewell
Profits Different types of profit Profit Maximisation Effects of changes in revenues and costs The functions of profit in a market economy.
ET2105 Electrical Power System Essentials
Flexible AC Transmission Systems: Placement, Control, and Interaction
Flexible AC Transmission System Overview
POWER FACTOR CORRECTION
Power System 2002 Conference: Impact of Distributed Generation CLEMSON UNIVERSITY ELECTRIC POWER RESEARCH ASSOCIATION 1 Distribution Capacitor Placement.
Tubas ELECTRICAL NETWORK STUDY Prepared by : Omar Abu-Omar Ahmad Nerat Sameed banifadel PRESENTATION TO: Dr.MAHER KHAMASH.
Voltage Collapse M. H. Sadeghi Winter 2007 KNTU. Power System Stability IEEE: Power system stability is defined as the capability of a system to maintain.
Barcelona– May 2003 CIRED’2003 Beta session 4a: Distributed Generation Controllability of DG helps managing Distribution Grids J. A. Peças Lopes
THYRISTOR BASED FACTS CONTROLLER
Frankfurt (Germany), 6-9 June 2011 Pyeongik Hwang School of Electrical Engineering Seoul National University Korea Hwang – Korea – RIF Session 4a – 0324.
Frankfurt (Germany), 6-9 June 2011 Steven Inglis – United Kingdom – RIF Session 5 – Paper 0434 Multi-Objective Network Planning tool for the optimal integration.
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
Capacitors, Batteries. Capacitors Create a difference in Potential based upon how much charge is stored V = q/C (V) C : Capacitance C = k ε o A /d k :
Session 3. Product Development Process 1.Flow 2.Steps and Process.
Contingency-Constrained PMU Placement in Power Networks
Didden, M BE Session 2 – Block 3 Barcelona May Considerations to choose the appropriate voltage sag mitigation device M. Didden, K.U.Leuven.
“ENERGY EFFICIENCY AND PROFITABILITY ANALYSIS OF REDUCED LOSS TRANSFORMERS: Experiences in Spain" 14 th May 2003 J.Frau Spain Session 5 – Block 1.2.
Nelson Kagan BR Session 4 – Block 3 – Planning – Paper #66 Barcelona May Technical Assessment for the Installation of Dispersed Generation.
Juan Mora SP Session 2 – Block 3 – Question 8.1 Barcelona May 2003 University of Girona 1 A slide has to be easy to read It must not be too crowded.
Thirault France Session 4 – Block 4.4 Barcelona May A Dynamic Programming Algorithm for the Design of dispersed generation center adapted.
UNIT-VIII COMBINED COMPENSATORS
1 © ABB Automation Technologies AB, PTSX/TP/A Janez Zakonjsek PS03_Q11_SE Janez Zakonjsek.
UNIT-VII Static Series Compensators
Electricity pricing Tariffs.
Goal Parameters How Tools Results Increasing Revenues by Optimizing Generation Relative to PJM Forecasted Price Signals.
PG Funding and Management Strategies Paris Some thoughts on Road Pricing.
Vaughan Roberts UK Session 4 – Block 4 Barcelona May ACTIVE NETWORKS FOR THE ACCOMMODATION OF DISPERSED GENERATION.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
DICORATO IT Session 4 – Block 1 – Question 3 Barcelona May Set parameters and implement the LM option Market access options Evaluate Economic.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Chapter 3 Slide 1 Figure 3-1 page 43 The Circular Flow of Dollars Through the Economy Slide 2 Figure 3-2 page 47 How a Factor of Production is Compensated.
AQA Physics Gravitational Fields, Electric Fields and Capacitance Section 9 Charging and Discharging a Capacitor.
Stefan Vancampenhout Belgium Session 6 – Block 2 Barcelona May A New Logistics Organisation Electrabel Netmanagement Flanders Speaker – Louis.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
BREAK EVEN POINT & ANALYSIS BREAK EVEN POINT & ANALYSISFROM  MANJULA ROY  AKHILESH GIRI  UDAY PRATAP SINGH  PRASHANT KUMAR.
Unit 5 Blocking oscillators & Time base generators
Lone Star Transmission Presentation on SSR Blair Giffin Operations Engineer September 9, 2013.
1. What is the problem being studied?
Capacitor Action Topics covered in this presentation: Capacitors on DC
Capacitors, Batteries.
Public workshop: CBA 3.0 –come and improve with us the transmission and storage assessment methodology Brussels 07 November 2017.
Series Capacitor Compensation
Yahoo Mail Customer Support Number
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
تحليل الحساسية Sensitive Analysis.
THANK YOU!.
Thank you.
Thank you.
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
1. The price of the hat should be $6 if they want to make maximum profit. The profit would be $15,400.
دکتر سید مجید اسما عیل زاده
Section – Linear Programming
Presentation transcript:

SUNTHORN FAIMUENWAI TH Session 5 – Block 1 – Question 16 Barcelona May TCSC as a tool to reduce the transmission congestion charge To reduce the congestion charge using TCSC. Technique of predictor-corrector primal-dual interior point enhanced linear programming. Verification with IEEE test system.

SUNTHORN FAIMUENWAI TH Session 5 – Block 1 – Question 16 Barcelona May Transmission Congestion Charge

SUNTHORN FAIMUENWAI TH Session 5 – Block 1 – Question 16 Barcelona May

SUNTHORN FAIMUENWAI TH Session 5 – Block 1 – Question 16 Barcelona May Thyristor-Controlled Series Capacitor Line Compensation 40% Minimum 60% Maximum Can be represented as series Capacitor

SUNTHORN FAIMUENWAI TH Session 5 – Block 1 – Question 16 Barcelona May CONGESTION CHARGE IEEE 14 BUSIEEE 30 BUS

SUNTHORN FAIMUENWAI TH Session 5 – Block 1 – Question 16 Barcelona May CONGESTION CHARGE IEEE 57 BUSIEEE 118 BUS

SUNTHORN FAIMUENWAI TH Session 5 – Block 1 – Question 16 Barcelona May IEEE 30 BUS TEST SYSTEM

SUNTHORN FAIMUENWAI TH Session 5 – Block 1 – Question 16 Barcelona May RESULTS

SUNTHORN FAIMUENWAI TH Session 5 – Block 1 – Question 16 Barcelona May RESULTS (Cont.)

SUNTHORN FAIMUENWAI TH Session 5 – Block 1 – Question 16 Barcelona May RESULTS (Cont.) Dramatic decrease in marginal price and transmission congestion charge. 2% reduction in total generation cost. 2.85% reduction in system loss.

SUNTHORN FAIMUENWAI TH Session 5 – Block 1 – Question 16 Barcelona May COMMENTS Things to be taken into consideration : Cost of investment. Sensitivity of the line flow to the series compensation. THANK YOU