Summary Results for: Roundabout Peer Review & Gap Project Evaluation Presented by: City Council: July 2, 2013Presenter: Scott Ritchie, P.E. RoundaboutsCorridorsSignals.

Slides:



Advertisements
Similar presentations
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee July 11, 2007 Meeting.
Advertisements

PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Who we are these people? Gabriela Vega – Transportation Planner, DDOT/PPSA George Branyan – Pedestrian Program Coordinator, DDOT/PPSA Trey Dickerson –
NICHOLS SCHOOL TRAFFIC OPERATIONS STUDY. Existing Operations Examined Data Collection  On-site Count Collection of Representative Traffic Conditions.
Holman Highway 68 / Highway 1 Roundabout Planning Commission May 14, 2013.
In March 2015, Mayor Murray announced a proposal for a new 9-year, $900 million transportation levy to replace the Bridging the Gap levy that expires at.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
Transit Improvements on East-West Routes in Downtown Minneapolis Michael Mechtenberg Planner Metro Transit Minneapolis-St. Paul, MN.
Florida Department of Transportation, November 2009
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
Unsignalized Intersections CTC-340. Hmwk At end of powerpoint.
Watching Out for Us! Skills for Safe Walking Watching Out for Us! Skills for Safe Walking was developed by the Highway Safety Research Center at the University.
Highway Capacity Software Based on the Highway Capacity Manual (HCM) Special Report 209 Transportation Research Board (TRB), National Research Council.
1 Channelization and Turn Bays CE 453 Lecture 31.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
What is the role of the transportation planner? Reference: Institute of Transportation Engineers.
CENTRAL ACCESS SCHEME FOR THE CITY OF KILKENNY Traffic Considerations The feed back resulting from public consultation did cause us to revisit the traffic.
VISSIM and Mn/DOT’s INTERSECTION CONTROL EVALUATION (ICE) VISSIM USER’S GROUP MEETING MAY 15-16, 2008 Philadelphia Dennis Eyler, P.E., P.T.O.E. Vice President.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
1 IntelliDrive SM Research, Development and Emerging Technologies National ITS Perspective Panel Joseph I. Peters, Ph.D. Federal Highway Administration.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Madison Avenue Traffic Calming Who We Are: Consortium of 17 neighborhood associations, churches, schools, hospital, and businesses concerned about economic.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Traffic Flow Parameters Surface Street Application.
LADOTD Statewide Traffic Engineers Meeting June 19, 2014 Traffic Signal Timing Project Update Nick J. Ferlito, Jr., P.E., PTOE Neel-Schaffer, Inc.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Consideration of Dual Left Turns at 82 nd Street Intersections & at 50 th Street Intersections City of Lubbock Citizens Traffic Commission By: Jere Hart.
Small Cost – Big Impact: Lessons in Low-Cost Safety Improvements Gustave Scheerbaum, PE Complete Streets Safety Engineer ARLE Grant Programs Manager City.
E MESE MAKÓ, PhD Associate professor Department of Transport Infrastructure Szechenyi Istvan University, Gyor, Hungary Evaluation of Human.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Chapter 191 Chapter 19: Elements of Intersection Design and Layout Make an initial sizing of the intersection Make an initial sizing of the intersection.
Chapter 6: Intersections
Advancing Traffic Signal Management Programs through Regional Collaboration T3 Webinar -- July 23, 2009 Jim Poston Regional Transportation Commission Reno,
Signal timing CTC-340. Key Elements Development of safe and effective phase plan and sequence Determination of vehicle signal needs –Timing of yellow.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Objective & Goals The objective of this presentation is to build on the Charrette and Museum Project recommendations and present infrastructure upgrades.
Visit Our Website at: Click to edit Master title style.
City of Snoqualmie Tokul Roundabout Project April 10, 2012.
Complete Streets Training Module 4b – Designing for All Users.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
NC-54 at Farrington as Offset Intersection
Assistant City Traffic Engineer
Synthesis of Recent & Ongoing Studies: Accessibility and Pedestrian Safety at Roundabouts Andrew T. Duerr, P.E. Northeast US Roundabouts Peer Exchange.
The I-465 West Leg Reconstruction Project
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
Marina Vista Streetscape Project
Project Management Team Meeting #3
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
North Lamar Boulevard Project
Traffic System Management for “Tulkarem”
Stanford Avenue/El Camino Real Intersection Improvements Project
FM 518 By-pass Traffic Review
Active Traffic Alternatives
Signal Timing: Putting it All Together
Developing a Pedestrian -Bicycle Safety Action Plan
State Aid Standards Development
Design and Engineering Services
FREEWAY MANAGEMENT SYSTEMS:
Module 6 A 21st Century Transportation Network
Presentation transcript:

Summary Results for: Roundabout Peer Review & Gap Project Evaluation Presented by: City Council: July 2, 2013Presenter: Scott Ritchie, P.E. RoundaboutsCorridorsSignals

Scott Ritchie, pe, roundabout specialist Agenda 1) What is A Modern Roundabout? 2) Why Are Roundabouts Safer? 3) Modern Roundabout Operations Visual 4) Rbt Peer Review Results / Recommendations 5) Open Discussion / Questions 6) Gap Project Evaluation Results / Recommendations 7) Open Discussion / Questions

Scott Ritchie, pe, roundabout specialist Study Area  Jackson   Maple  Pine  River   Bridge   Union  N. Main  North

Scott Ritchie, pe, roundabout specialist Evaluation Scope Review Existing Conditions + Site Visit Evaluate Union Signal Capacity Evaluate Ped Xings Provide Capacity & Safety Recommendations Provide Technical Memo of Results Present Results to Council

Scott Ritchie, pe, roundabout specialist Defined Scope  Jackson   Maple  Pine  River   Bridge   Union  N. Main  Mid-Block Ped Xing Controlled Ped Xing

Scott Ritchie, pe, roundabout specialist Jackson Crossing Modern Roundabout Relocated and incorporated into roundabout

Scott Ritchie, pe, roundabout specialist Defined Scope  Jackson   Maple  Pine  River   Bridge   Union  N. Main 

Scott Ritchie, pe, roundabout specialist Union Signal Capacity Unique Signal Ops: 1.E Leg One-way w/ Continuous WB RT (except Ped phase) 2.S Leg One-way (two receiving) 3.W Leg RT Only/No Lefts (No RTOR) 4.3 Approach Leg (Split Phasing) 5.Ped Only Phase (all red time) Evaluation: LOS F Evaluation: Deficient SB Capacity Resolution: Dual SB Thru Design Req’d

Scott Ritchie, pe, roundabout specialist Union Signal Capacity Evaluation: EB No RTOR = Less Cap Resolution: RTOR Not Warranted Remove it…

Scott Ritchie, pe, roundabout specialist Union Signal Capacity Evaluation: WB RT Constricted: Geometry, Parking, Driver Expectations, Ped phase, Xings, High RT Traffic, etc Resolution: Design Mods: Larger RT Rad, Channelize RT, Add Median, Landscape, Move Parking PP

Scott Ritchie, pe, roundabout specialist Union Signal Capacity Evaluation: Ped only phase = Less Cap Resolution: Remove Ped Phase, Relocate Xings, Refuge

Scott Ritchie, pe, roundabout specialist Union Signal Capacity Evaluation: Nearby Ped Xings Hinder Signal Ops = Less Cap Resolution: Merge Closely Spaced Xings (N & S of Signal) Resolution: Shorten Signal’s Cycle Length from 75s to 40s -- (New Xing Location Subject To Signal Timing) ?

Scott Ritchie, pe, roundabout specialist Union Signal Capacity Resolution: LOS A

Scott Ritchie, pe, roundabout specialist Maple Crossings Evaluation: - Xing Warranted? - Skew= Less Safety - Congestion - Distraction Resolution : - Check Warrants - Square Up Intx - Narrow MidB-Xing - +Bulb Out/Refuge - Reduce Parking - New Curbing

Scott Ritchie, pe, roundabout specialist Pine Crossings Evaluation: - Xing Warranted? - SSD w/ Bridge? - Xing Previously Relocated due SSD? - Excessive Xings - Congestion - Car Expectations Resolution: - Check Warrants - Check SSD - Not Met=Remove - Met=Relocate w/ Overxing or Underx

Scott Ritchie, pe, roundabout specialist River Crossings Evaluation: - 140’ Long Xing! - Skew = Less Safety - Lack of Sight Dist. Resolution: - Prohibit EB LT (ssd) - Geometric Mods Req’d (Pine & River) - One-Way River - 50’

Scott Ritchie, pe, roundabout specialist Bridge Crossing

Scott Ritchie, pe, roundabout specialist Peer Review Recommendations Don’t Allow the Gap Project To Simply Replace Extg Authorize New Design Concepts to be Developed for Each Intx / Xing –Jackson  Modern Roundabout –Maple  Square Up Intx, New Curbs, Bulbs, Refuges –Pine  Remove Xing?, Square Intx, + Curbs, New Xing –River  New Curbs, RT-Out only, New Xing –Bridge  Relocate –Union  2 SB Thru, WB RT Curbs, Lndscp, Xings, Time)

Scott Ritchie, pe, roundabout specialist Other Recommendations Gap Project Area – Confident in Recom. Union Signal Issues – Suspect Broader Network Issues Conduct a Planning Level Downtown Transportation Revitalization Study As a Visitor… other deficient issues in Downtown Area Need Analysis and Resolutions (all rdwys interconnected) RTE believes there are better solutions for downtown –Not Just for Traffic Capacity –Enhance Rochester Commerce, –All Mode Users (Peds, Cyclists, P, Trucks, Tourists, Commuters) –Improve Aesthetics, Landscaping, Street Furniture, Etc. –Create a “Sense of Place” –Future Land Use Planning –Accommodate Both Local Commuters and Local Businesses

Scott Ritchie, pe, roundabout specialist Questions? Speaker: Scott Ritchie Roundabouts & Traffic Engineering (928)